X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686082104000

Well Details

Well ID: 0686082104000
Loading map...
Location: 00/04-21-068-08W6/0
Location Alias: 00/04-21-68-08 W6M
Location Alias 2: 00/04-21-068-08 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 08
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA HZ ELM 4-21-68-8
Operator Name: NuVista Energy Ltd.
License Number: 0491262
License Date: 2018-10-02
License Status: Issued
Spud Date: 2018-12-04
Final Drill Date: 2019-02-11
Well Total Depth: 5660.00 m
Surface Hole Latitude: 54.879274
Surface Hole Longitude: -119.134049

For data sources see[1][2]

Well History

Date Event
2018-10-02 Obtained License
2018-12-05 Surface Casing Operation Performed
2019-02-01 Direction Drilling Operation Performed - Deviate
2019-02-01 Well Log Performed
2019-02-02 Direction Drilling Operation Performed - Horizontal
2019-02-02 Intermediate Casing Operation Performed
2019-02-11 Finished Drilling
2019-02-11 Well Log Performed
2019-02-11 Well Mode changed to Drilled and Cased
2019-02-14 Liner Casing Operation Performed
2019-02-14 Rig Released
2019-03-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-12 Perforation Treatment Performed - Jet Perforation
2019-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-13 Perforation Treatment Performed - Fractured
2019-03-13 Perforation Treatment Performed - Jet Perforation
2019-03-14 Perforation Treatment Performed - Fractured
2019-03-14 Perforation Treatment Performed - Jet Perforation
2019-03-15 Perforation Treatment Performed - Fractured
2019-03-15 Perforation Treatment Performed - Jet Perforation
2019-03-16 Perforation Treatment Performed - Fractured
2019-03-16 Perforation Treatment Performed - Jet Perforation
2019-03-17 Perforation Treatment Performed - Fractured
2019-03-17 Perforation Treatment Performed - Jet Perforation
2019-03-18 Perforation Treatment Performed - Fractured
2019-03-18 Perforation Treatment Performed - Jet Perforation
2019-03-24 Well Began Production
2019-03-24 Well Fluid changed to Gas
2019-03-24 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-12-04 Nabors Drilling Canada Limited 127 N/A Set Surface
2019-01-26 Nabors Drilling Canada Limited 127 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-02-01 2630.60 Deviate (5 - 79 degrees)
2019-02-02 3006.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-06 Multi-Stage Fracture 5623.20 5626.80 0
2019-03-10 Multi-Stage Fracture 5135.20 5135.30 0
2019-03-10 Multi-Stage Fracture 5088.20 5088.30 0
2019-03-10 Multi-Stage Fracture 5026.60 5026.70 0
2019-03-10 Multi-Stage Fracture 4979.70 4979.80 0
2019-03-10 Multi-Stage Fracture 4918.50 4918.60 0
2019-03-10 Multi-Stage Fracture 4871.70 4871.80 0
2019-03-10 Multi-Stage Fracture 4809.90 4810.00 0
2019-03-11 Multi-Stage Fracture 4762.40 4762.50 0
2019-03-12 Multi-Stage Fracture 4700.60 4700.70 0
2019-03-12 Multi-Stage Fracture 4653.30 4653.40 0
2019-03-08 Multi-Stage Fracture 5573.00 5573.10 0
2019-03-12 Multi-Stage Fracture 4591.60 4591.70 0
2019-03-12 Multi-Stage Fracture 4544.20 4544.30 0
2019-03-12 Multi-Stage Fracture 4482.50 4482.60 0
2019-03-12 Multi-Stage Fracture 4435.00 4435.10 0
2019-03-12 Perforation 4374.50 4375.10 12
2019-03-13 Fracture 4374.50 4375.10 0
2019-03-13 Perforation 4319.50 4320.10 12
2019-03-14 Fracture 4319.50 4320.10 0
2019-03-14 Perforation 4266.00 4266.60 12
2019-03-14 Fracture 4266.00 4266.60 0
2019-03-08 Multi-Stage Fracture 5525.30 5525.40 0
2019-03-14 Perforation 4204.50 4205.10 12
2019-03-14 Fracture 4204.50 4205.10 0
2019-03-14 Perforation 4143.00 4143.60 12
2019-03-15 Fracture 4143.00 4143.60 0
2019-03-15 Perforation 4081.00 4081.60 12
2019-03-15 Fracture 4081.00 4081.60 0
2019-03-15 Perforation 4020.00 4020.60 12
2019-03-15 Fracture 4020.00 4020.60 0
2019-03-15 Perforation 3956.50 3957.10 12
2019-03-15 Fracture 3956.50 3957.10 0
2019-03-08 Multi-Stage Fracture 5463.30 5463.40 0
2019-03-15 Perforation 3895.00 3895.60 12
2019-03-15 Fracture 3895.00 3895.60 0
2019-03-15 Perforation 3833.50 3834.10 12
2019-03-16 Fracture 3833.50 3834.10 0
2019-03-16 Perforation 3733.00 3733.60 12
2019-03-16 Fracture 3733.00 3733.60 0
2019-03-16 Perforation 3711.00 3711.60 12
2019-03-16 Fracture 3711.00 3711.60 0
2019-03-16 Perforation 3649.50 3650.10 12
2019-03-16 Fracture 3649.50 3650.10 0
2019-03-08 Multi-Stage Fracture 5415.50 5415.60 0
2019-03-16 Perforation 3588.00 3588.60 12
2019-03-17 Fracture 3588.00 3588.60 0
2019-03-17 Perforation 3526.00 3526.60 12
2019-03-17 Fracture 3526.00 3526.60 0
2019-03-17 Perforation 3463.00 3463.60 12
2019-03-17 Fracture 3463.00 3463.60 0
2019-03-17 Perforation 3401.50 3402.10 12
2019-03-17 Fracture 3401.50 3402.10 0
2019-03-17 Perforation 3340.00 3340.60 12
2019-03-18 Fracture 3340.00 3340.60 0
2019-03-09 Multi-Stage Fracture 5353.60 5353.70 0
2019-03-18 Perforation 3278.50 3279.10 12
2019-03-18 Fracture 3278.50 3279.10 0
2019-03-18 Perforation 3217.50 3218.10 12
2019-03-18 Fracture 3217.50 3218.10 0
2019-03-18 Perforation 3156.00 3156.60 12
2019-03-18 Fracture 3156.00 3156.60 0
2019-03-18 Perforation 3100.00 3100.60 12
2019-03-18 Fracture 3100.00 3100.60 0
2019-03-09 Multi-Stage Fracture 5306.20 5306.30 0
2019-03-09 Multi-Stage Fracture 5244.10 5244.20 0
2019-03-09 Multi-Stage Fracture 5196.40 5196.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-06 2019-03-18 2,883 31,778 N/A
2 2019-03-12 2019-03-18 2,883 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 89.1041 N/A
30/50 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 9.2534 N/A
40/70 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 2.3777 N/A
SFR-302 (Friction Reducer) Step Energy Services Friction Reducer Proprietary Trade Secret 100 0.0342 N/A
Sodium Chloride 7647-14-5 100 0.0342 N/A
2 SCBO-2 (Breaker) Step Energy Services Breaker Ammonium Persulfate 7727-54-0 100 0.0002 N/A
Cured Acrylic Resin Not Available 100 0.0002 N/A
Non-Hazardous Ingredients Not Available 100 0.0002 N/A
SWG-201L (Gellant) Step Energy Services Gelling Agent Non-Hazardous Ingredients Not Available 100 0.0116 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-03-07 2019-03-22 Groundwater - Non-saline less than or equal to 150m deep 11419
2019-03-07 2019-03-22 Groundwater - Non-saline less than or equal to 150m deep 7500
2019-03-07 2019-03-22 Groundwater - Non-saline less than or equal to 150m deep 3144
2019-03-07 2019-03-22 Surface Water - River 10007

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 5520 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-15 No Incident Encountered 0.00 0.00
2019-03-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References