X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686082105000

Well Details

Well ID: 0686082105000
Loading map...
Location: 00/05-21-068-08W6/0
Location Alias: 00/05-21-68-08 W6M
Location Alias 2: 00/05-21-068-08 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 08
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA HZ ELM 5-21-68-8
Operator Name: NuVista Energy Ltd.
License Number: 0491525
License Date: 2018-10-22
License Status: Issued
Spud Date: 2018-12-06
Final Drill Date: 2019-01-22
Well Total Depth: 5965.00 m
Surface Hole Latitude: 54.879216
Surface Hole Longitude: -119.133931

For data sources see[1][2]

Well History

Date Event
2018-10-22 Obtained License
2018-12-07 Surface Casing Operation Performed
2019-01-09 Direction Drilling Operation Performed - Deviate
2019-01-10 Direction Drilling Operation Performed - Horizontal
2019-01-10 Well Log Performed
2019-01-14 Intermediate Casing Operation Performed
2019-01-22 Finished Drilling
2019-01-22 Well Log Performed
2019-01-22 Well Mode changed to Drilled and Cased
2019-01-24 Liner Casing Operation Performed
2019-01-25 Rig Released
2019-03-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-13 Perforation Treatment Performed - Fractured
2019-03-13 Perforation Treatment Performed - Jet Perforation
2019-03-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-14 Perforation Treatment Performed - Fractured
2019-03-14 Perforation Treatment Performed - Jet Perforation
2019-03-15 Perforation Treatment Performed - Fractured
2019-03-15 Perforation Treatment Performed - Jet Perforation
2019-03-16 Perforation Treatment Performed - Fractured
2019-03-16 Perforation Treatment Performed - Jet Perforation
2019-03-17 Perforation Treatment Performed - Fractured
2019-03-17 Perforation Treatment Performed - Jet Perforation
2019-03-18 Perforation Treatment Performed - Fractured
2019-03-18 Perforation Treatment Performed - Jet Perforation
2019-03-19 Perforation Treatment Performed - Fractured
2019-04-09 Well Began Production
2019-04-09 Well Fluid changed to Gas
2019-04-09 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-01-04 Nabors Drilling Canada Limited 127 N/A Resumption
2018-12-06 Nabors Drilling Canada Limited 127 N/A Set Surface
2019-01-26 Nabors Drilling Canada Limited 127 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-09 2622.30 Deviate (5 - 79 degrees)
2019-01-10 2969.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-06 Multi-Stage Fracture 5933.40 5937.00 0
2019-03-09 Multi-Stage Fracture 5375.60 5375.70 0
2019-03-10 Multi-Stage Fracture 5314.20 5314.30 0
2019-03-10 Multi-Stage Fracture 5252.30 5252.40 0
2019-03-10 Multi-Stage Fracture 5190.60 5190.70 0
2019-03-10 Multi-Stage Fracture 5128.70 5128.80 0
2019-03-10 Multi-Stage Fracture 5067.90 5068.00 0
2019-03-10 Multi-Stage Fracture 5006.10 5006.20 0
2019-03-10 Multi-Stage Fracture 4944.50 4944.60 0
2019-03-11 Multi-Stage Fracture 4882.20 4882.30 0
2019-03-11 Multi-Stage Fracture 4820.90 4821.00 0
2019-03-07 Multi-Stage Fracture 5869.60 5869.70 0
2019-03-11 Multi-Stage Fracture 4758.90 4759.00 0
2019-03-12 Multi-Stage Fracture 4698.20 4698.30 0
2019-03-12 Multi-Stage Fracture 4636.60 4636.70 0
2019-03-12 Multi-Stage Fracture 4575.40 4575.50 0
2019-03-12 Multi-Stage Fracture 4513.10 4513.20 0
2019-03-12 Multi-Stage Fracture 4453.50 4453.60 0
2019-03-13 Multi-Stage Fracture 4401.10 4401.20 0
2019-03-13 Multi-Stage Fracture 4346.20 4346.30 0
2019-03-13 Multi-Stage Fracture 4286.90 4287.00 0
2019-03-13 Multi-Stage Fracture 4232.30 4232.40 0
2019-03-07 Multi-Stage Fracture 5807.90 5808.00 0
2019-03-13 Multi-Stage Fracture 4169.90 4170.00 0
2019-03-13 Multi-Stage Fracture 4121.90 4122.00 0
2019-03-13 Perforation 4076.00 4076.60 12
2019-03-13 Fracture 4076.00 4076.60 0
2019-03-13 Perforation 4014.00 4014.60 12
2019-03-14 Fracture 4014.00 4014.60 0
2019-03-14 Perforation 3953.50 3954.10 12
2019-03-14 Fracture 3953.50 3954.10 0
2019-03-14 Perforation 3901.00 3901.60 12
2019-03-14 Fracture 3901.00 3901.60 0
2019-03-08 Multi-Stage Fracture 5746.70 5746.80 0
2019-03-14 Perforation 3847.00 3847.60 12
2019-03-15 Fracture 3847.00 3847.60 0
2019-03-15 Perforation 3790.50 3791.10 12
2019-03-16 Fracture 3790.50 3791.10 0
2019-03-16 Perforation 3725.00 3725.60 12
2019-03-16 Fracture 3725.00 3725.60 0
2019-03-16 Perforation 3672.00 3672.60 12
2019-03-16 Fracture 3672.00 3672.60 0
2019-03-16 Perforation 3616.00 3616.60 12
2019-03-16 Fracture 3616.00 3616.60 0
2019-03-08 Multi-Stage Fracture 5684.80 5684.90 0
2019-03-16 Perforation 3558.00 3558.60 12
2019-03-17 Fracture 3558.00 3558.60 0
2019-03-17 Perforation 3498.50 3499.10 12
2019-03-17 Fracture 3498.50 3499.10 0
2019-03-17 Perforation 3443.00 3443.60 12
2019-03-17 Fracture 3443.00 3443.60 0
2019-03-17 Perforation 3383.00 3383.60 12
2019-03-17 Fracture 3383.00 3383.60 0
2019-03-17 Perforation 3324.00 3324.60 12
2019-03-17 Fracture 3324.00 3324.60 0
2019-03-08 Multi-Stage Fracture 5623.50 5623.60 0
2019-03-17 Perforation 3264.00 3264.60 12
2019-03-18 Fracture 3264.00 3264.60 0
2019-03-18 Perforation 3204.00 3204.60 12
2019-03-18 Fracture 3204.00 3204.60 0
2019-03-18 Perforation 3144.50 3145.10 12
2019-03-18 Fracture 3144.50 3145.10 0
2019-03-18 Perforation 3084.00 3084.60 12
2019-03-19 Fracture 3084.00 3084.60 0
2019-03-08 Multi-Stage Fracture 5561.40 5561.50 0
2019-03-08 Multi-Stage Fracture 5499.80 5499.90 0
2019-03-08 Multi-Stage Fracture 5437.40 5437.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-06 2019-03-19 2,881 34,654 N/A
2 2019-03-13 2019-03-18 2,881 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 88.8685 N/A
30/50 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 9.4303 N/A
40/70 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 2.381 N/A
SFR-302 (Friction Reducer) Step Energy Services Friction Reducer Proprietary Trade Secret 100 0.0384 N/A
Sodium Chloride 7647-14-5 100 0.0384 N/A
2 SCBO-2 (Breaker) Step Energy Services Breaker Ammonium Persulfate 7727-54-0 100 0.0003 N/A
Cured Acrylic Resin Not Available 100 0.0003 N/A
Non-Hazardous Ingredients Not Available 100 0.0003 N/A
SWG-201L (Gellant) Step Energy Services Gelling Agent Non-Hazardous Ingredients Not Available 100 0.0125 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-03-07 2019-03-23 Surface Water - River 33649

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 5664 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-25 No Incident Encountered 0.00 0.00
2019-03-25 No Incident Encountered 0.00 0.00

For data sources see[10]

References