If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0686082112000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.879157,"lon":-119.133812,"icon":""}]} |
Location: 00/12-21-068-08W6/0 | |
Location Alias: 00/12-21-68-08 W6M | |
Location Alias 2: 00/12-21-068-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 6 | |
Range: 08 | |
Section: 21 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: NUVISTA HZ ELM 12-21-68-8 | |
Operator Name: NuVista Energy Ltd. | |
License Number: 0491526 | |
License Date: 2018-10-22 | |
License Status: Issued | |
Spud Date: 2018-12-07 | |
Final Drill Date: 2018-12-31 | |
Well Total Depth: 6435.00 m | |
Surface Hole Latitude: 54.879157 | |
Surface Hole Longitude: -119.133812 |
Date | Event |
---|---|
2018-10-22 | Obtained License |
2018-12-08 | Surface Casing Operation Performed |
2018-12-13 | Direction Drilling Operation Performed - Deviate |
2018-12-15 | Direction Drilling Operation Performed - Horizontal |
2018-12-15 | Well Log Performed |
2018-12-17 | Intermediate Casing Operation Performed |
2018-12-17 | Well Log Performed |
2018-12-31 | Finished Drilling |
2018-12-31 | Well Log Performed |
2018-12-31 | Well Mode changed to Drilled and Cased |
2019-01-01 | Liner Casing Operation Performed |
2019-01-03 | Perforation Treatment Performed - Open-Hole Completion |
2019-01-03 | Rig Released |
2019-03-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-13 | Perforation Treatment Performed - Fractured |
2019-03-13 | Perforation Treatment Performed - Jet Perforation |
2019-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-14 | Perforation Treatment Performed - Fractured |
2019-03-14 | Perforation Treatment Performed - Jet Perforation |
2019-03-15 | Perforation Treatment Performed - Fractured |
2019-03-15 | Perforation Treatment Performed - Jet Perforation |
2019-03-16 | Perforation Treatment Performed - Fractured |
2019-03-16 | Perforation Treatment Performed - Jet Perforation |
2019-03-17 | Perforation Treatment Performed - Fractured |
2019-03-17 | Perforation Treatment Performed - Jet Perforation |
2019-03-18 | Perforation Treatment Performed - Fractured |
2019-03-18 | Perforation Treatment Performed - Jet Perforation |
2019-03-19 | Perforation Treatment Performed - Fractured |
2019-03-19 | Perforation Treatment Performed - Jet Perforation |
2019-04-16 | Well Began Production |
2019-04-16 | Well Fluid changed to Gas |
2019-04-16 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-12-07 | Nabors Drilling Canada Limited | 127 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-12-13 | 2621.60 | Deviate (5 - 79 degrees) |
2018-12-15 | 2987.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-01-03 | Open Hole/Barefoot Completion | 6430.10 | 6435.00 | 0 |
2019-03-07 | Multi-Stage Fracture | 5921.90 | 5922.00 | 0 |
2019-03-08 | Multi-Stage Fracture | 5862.40 | 5862.50 | 0 |
2019-03-09 | Multi-Stage Fracture | 5802.10 | 5802.20 | 0 |
2019-03-09 | Multi-Stage Fracture | 5743.10 | 5743.20 | 0 |
2019-03-09 | Multi-Stage Fracture | 5682.90 | 5683.00 | 0 |
2019-03-09 | Multi-Stage Fracture | 5623.00 | 5623.10 | 0 |
2019-03-09 | Multi-Stage Fracture | 5562.60 | 5562.70 | 0 |
2019-03-09 | Multi-Stage Fracture | 5502.10 | 5502.20 | 0 |
2019-03-10 | Multi-Stage Fracture | 5441.70 | 5441.80 | 0 |
2019-03-11 | Multi-Stage Fracture | 5383.60 | 5383.70 | 0 |
2019-03-06 | Multi-Stage Fracture | 6406.60 | 6410.20 | 0 |
2019-03-11 | Multi-Stage Fracture | 5323.90 | 5324.00 | 0 |
2019-03-11 | Multi-Stage Fracture | 5263.30 | 5263.40 | 0 |
2019-03-11 | Multi-Stage Fracture | 5203.80 | 5203.90 | 0 |
2019-03-11 | Multi-Stage Fracture | 5143.80 | 5143.90 | 0 |
2019-03-11 | Multi-Stage Fracture | 5084.10 | 5084.20 | 0 |
2019-03-12 | Multi-Stage Fracture | 5024.40 | 5024.50 | 0 |
2019-03-12 | Multi-Stage Fracture | 4964.50 | 4964.60 | 0 |
2019-03-13 | Multi-Stage Fracture | 4905.70 | 4905.80 | 0 |
2019-03-13 | Multi-Stage Fracture | 4845.40 | 4845.50 | 0 |
2019-03-13 | Multi-Stage Fracture | 4785.60 | 4785.70 | 0 |
2019-03-06 | Multi-Stage Fracture | 6344.00 | 6344.10 | 0 |
2019-03-13 | Multi-Stage Fracture | 4725.30 | 4725.40 | 0 |
2019-03-13 | Multi-Stage Fracture | 4667.30 | 4667.40 | 0 |
2019-03-13 | Multi-Stage Fracture | 4607.00 | 4607.10 | 0 |
2019-03-13 | Multi-Stage Fracture | 4546.80 | 4546.90 | 0 |
2019-03-13 | Perforation | 4489.50 | 4490.10 | 12 |
2019-03-13 | Fracture | 4489.50 | 4490.10 | 0 |
2019-03-14 | Perforation | 4430.50 | 4431.10 | 12 |
2019-03-14 | Fracture | 4430.50 | 4431.10 | 0 |
2019-03-14 | Perforation | 4371.00 | 4371.60 | 12 |
2019-03-14 | Fracture | 4371.00 | 4371.60 | 0 |
2019-03-07 | Multi-Stage Fracture | 6283.70 | 6283.80 | 0 |
2019-03-14 | Perforation | 4311.00 | 4311.60 | 12 |
2019-03-14 | Fracture | 4311.00 | 4311.60 | 0 |
2019-03-14 | Perforation | 4251.00 | 4251.60 | 12 |
2019-03-14 | Fracture | 4251.00 | 4251.60 | 0 |
2019-03-15 | Perforation | 4191.50 | 4192.10 | 12 |
2019-03-15 | Fracture | 4191.50 | 4192.60 | 0 |
2019-03-15 | Perforation | 4133.00 | 4133.60 | 12 |
2019-03-15 | Fracture | 4133.00 | 4133.60 | 0 |
2019-03-15 | Perforation | 4073.50 | 4074.10 | 12 |
2019-03-15 | Fracture | 4073.50 | 4074.10 | 0 |
2019-03-07 | Multi-Stage Fracture | 6223.50 | 6223.60 | 0 |
2019-03-15 | Perforation | 4014.00 | 4014.60 | 12 |
2019-03-15 | Fracture | 4014.00 | 4014.60 | 0 |
2019-03-16 | Perforation | 3954.00 | 3954.60 | 12 |
2019-03-16 | Fracture | 3954.00 | 3954.60 | 0 |
2019-03-16 | Perforation | 3894.50 | 3895.10 | 12 |
2019-03-16 | Fracture | 3894.50 | 3895.10 | 0 |
2019-03-16 | Perforation | 3834.50 | 3835.10 | 12 |
2019-03-16 | Fracture | 3834.50 | 3835.10 | 0 |
2019-03-16 | Perforation | 3775.00 | 3775.60 | 12 |
2019-03-16 | Fracture | 3775.00 | 3775.60 | 0 |
2019-03-07 | Multi-Stage Fracture | 6163.10 | 6163.20 | 0 |
2019-03-17 | Perforation | 3715.50 | 3716.10 | 12 |
2019-03-17 | Fracture | 3715.50 | 3716.10 | 0 |
2019-03-17 | Perforation | 3656.00 | 3656.60 | 12 |
2019-03-17 | Fracture | 3656.00 | 3656.60 | 0 |
2019-03-17 | Perforation | 3596.00 | 3596.60 | 12 |
2019-03-17 | Fracture | 3596.00 | 3596.60 | 0 |
2019-03-17 | Perforation | 3536.50 | 3537.10 | 12 |
2019-03-17 | Fracture | 3536.50 | 3537.10 | 0 |
2019-03-17 | Perforation | 3476.50 | 3477.10 | 12 |
2019-03-17 | Fracture | 3476.50 | 3477.10 | 0 |
2019-03-07 | Multi-Stage Fracture | 6102.50 | 6102.60 | 0 |
2019-03-17 | Perforation | 3417.00 | 3417.60 | 12 |
2019-03-17 | Fracture | 3417.00 | 3417.60 | 0 |
2019-03-18 | Perforation | 3357.00 | 3357.60 | 12 |
2019-03-18 | Fracture | 3357.00 | 3357.60 | 0 |
2019-03-18 | Perforation | 3298.00 | 3298.60 | 12 |
2019-03-18 | Fracture | 3298.00 | 3298.60 | 0 |
2019-03-18 | Perforation | 3198.00 | 3198.60 | 12 |
2019-03-18 | Fracture | 3198.00 | 3198.60 | 0 |
2019-03-18 | Perforation | 3108.00 | 3108.60 | 12 |
2019-03-18 | Fracture | 3108.00 | 3108.60 | 0 |
2019-03-07 | Multi-Stage Fracture | 6042.20 | 6042.30 | 0 |
2019-03-19 | Perforation | 3064.00 | 3064.60 | 12 |
2019-03-19 | Fracture | 3064.00 | 3064.60 | 0 |
2019-03-07 | Multi-Stage Fracture | 5982.10 | 5982.20 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-03-06 | 2019-03-19 | 2,879 | 39,814 | N/A |
2 | 2019-03-13 | 2019-03-18 | 2,879 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 89.5124 | N/A | |||
30/50 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 9.1109 | N/A | ||
40/70 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 2.2654 | N/A | ||
SFR-302 (Friction Reducer) | Step Energy Services | Friction Reducer | Proprietary | Trade Secret | 100 | 0.0392 | N/A | |
Sodium Chloride | 7647-14-5 | 100 | 0.0392 | N/A | ||||
2 | SCBO-2 (Breaker) | Step Energy Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0003 | N/A |
Cured Acrylic Resin | Not Available | 100 | 0.0003 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0003 | N/A | ||||
SWG-201L (Gellant) | Step Energy Services | Gelling Agent | Non-Hazardous Ingredients | Not Available | 100 | 0.0151 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-03-06 | 2019-03-19 | Surface Water - River | 40166 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 5184 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-01-03 | No Incident Encountered | 0.00 | 0.00 |
2019-03-31 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]