If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0686083312002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.922169,"lon":-119.146541,"icon":""}]} |
Location: 00/12-33-068-08W6/2 | |
Location Alias: 00/12-33-68-08 W6M | |
Location Alias 2: 00/12-33-068-08 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 6 | |
Range: 08 | |
Section: 33 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: NUVISTA ELM 12-33-68-8 | |
Operator Name: NuVista Energy Ltd. | |
License Number: 0479504 | |
License Date: 2016-05-25 | |
License Status: Amended | |
Spud Date: 2016-07-09 | |
Final Drill Date: 2017-03-10 | |
Well Total Depth: 4700.00 m | |
Surface Hole Latitude: 54.922169 | |
Surface Hole Longitude: -119.146541 |
Date | Event |
---|---|
2016-05-25 | Obtained License |
2016-07-11 | Surface Casing Operation Performed |
2016-07-13 | Direction Drilling Operation Performed - Deviate |
2016-07-18 | Direction Drilling Operation Performed - Horizontal |
2016-07-18 | Intermediate Casing Operation Performed |
2017-02-25 | Direction Drilling Operation Performed - Horizontal |
2017-03-10 | Finished Drilling |
2017-03-10 | Well Log Performed |
2017-03-10 | Well Mode changed to Drilled and Cased |
2017-03-12 | Liner Casing Operation Performed |
2017-03-14 | Rig Released |
2017-03-18 | Perforation Treatment Performed - Open-Hole Completion |
2017-03-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-03-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-03-28 | Well Began Production |
2017-03-28 | Well Fluid changed to Gas |
2017-03-28 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-02-19 | Precision Drilling Corporation | 530 | N/A | Resumption |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-07-13 | 1623.50 | Deviate (5 - 79 degrees) |
2016-07-18 | 2925.00 | Horizontal |
2017-02-25 | 2990.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-03-18 | Open Hole/Barefoot Completion | 4695.00 | 4700.00 | 0 |
2017-03-23 | Multi-Stage Fracture | 4112.10 | 4112.20 | 0 |
2017-03-23 | Multi-Stage Fracture | 4050.20 | 4050.30 | 0 |
2017-03-23 | Multi-Stage Fracture | 3973.20 | 3973.30 | 0 |
2017-03-24 | Multi-Stage Fracture | 3897.10 | 3897.20 | 0 |
2017-03-24 | Multi-Stage Fracture | 3820.40 | 3820.50 | 0 |
2017-03-24 | Multi-Stage Fracture | 3743.40 | 3743.50 | 0 |
2017-03-24 | Multi-Stage Fracture | 3666.50 | 3666.60 | 0 |
2017-03-24 | Multi-Stage Fracture | 3590.40 | 3590.50 | 0 |
2017-03-24 | Multi-Stage Fracture | 3513.40 | 3513.50 | 0 |
2017-03-24 | Multi-Stage Fracture | 3436.50 | 3436.60 | 0 |
2017-03-23 | Multi-Stage Fracture | 4656.90 | 4660.50 | 0 |
2017-03-24 | Multi-Stage Fracture | 3359.60 | 3359.70 | 0 |
2017-03-24 | Multi-Stage Fracture | 3282.70 | 3282.80 | 0 |
2017-03-24 | Multi-Stage Fracture | 3206.40 | 3206.50 | 0 |
2017-03-24 | Multi-Stage Fracture | 3129.70 | 3129.80 | 0 |
2017-03-23 | Multi-Stage Fracture | 4606.50 | 4606.60 | 0 |
2017-03-23 | Multi-Stage Fracture | 4530.10 | 4530.20 | 0 |
2017-03-23 | Multi-Stage Fracture | 4467.80 | 4467.90 | 0 |
2017-03-23 | Multi-Stage Fracture | 4390.90 | 4391.00 | 0 |
2017-03-23 | Multi-Stage Fracture | 4328.50 | 4328.60 | 0 |
2017-03-23 | Multi-Stage Fracture | 4251.60 | 4251.70 | 0 |
2017-03-23 | Multi-Stage Fracture | 4189.10 | 4189.20 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-03-23 | 2017-03-24 | 2,812 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | 7732-18-5 | 100 | 88.1703 | N/A | |||
SAND-PREMIUM WHITE-30/50. BULK | Halliburton | Crystalline silica. quartz | 14808-60-7 | 100 | 9.3065 | N/A | ||
SAND-PREMIUM WHITE-40/70. BULK | Halliburton | Crystalline silica. quartz | 14808-60-7 | 100 | 2.3275 | N/A | ||
FR-66 | Halliburton | Friction Reducer | Ammonium Chloride | 12125-02-9 | 100 | 0.0438 | N/A | |
Ethoxylated Alchol | Trade Secret | 100 | 0.0438 | N/A | ||||
Fatty Nitrogen Derived Amides | Trade Secret | 100 | 0.0438 | N/A | ||||
Hydrotreated Light Petroleum Distilate | 64742-47-8 | 100 | 0.0438 | N/A | ||||
Inert Ingredient(s) | Not Available | 100 | 0.0438 | N/A | ||||
OilPerm A | Halliburton | Surfactant | Ethanol | 64-17-5 | 100 | 0.0871 | N/A | |
Heavy Aromatic Petroleum Naphta | 64742-94-5 | 100 | 0.0871 | N/A | ||||
Inert Ingredient(s) | Not Available | 100 | 0.0871 | N/A | ||||
Naphthalene | 91-20-3 | 100 | 0.0871 | N/A | ||||
Poly(oxy-1.2-ethanediyl). alpha-(4-nonylphenyl) | 127087-87-0 | 100 | 0.0871 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-02-06 | 2017-02-28 | Surface Water - River | 16686 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 5764 | 0.0 | 0.0 | 0.0 |
2018 | 7151 | 0.0 | 0.0 | 0.0 |
2019 | 8615 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-03-18 | No Incident Encountered | 0.00 | 0.00 |
2017-03-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]