If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0694111412000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.975595,"lon":-111.576364,"icon":""}]} |
Location: 00/12-14-069-11W4/0 | |
Location Alias: 00/12-14-69-11 W4M | |
Location Alias 2: 00/12-14-069-11 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 4 | |
Range: 11 | |
Section: 14 | |
County/Municipality: Heart Lake 167 | |
Well Name: UNEX ET AL HEART LAKE 12-14-69-11 | |
Operator Name: TAQA North Ltd. | |
License Number: 0110304 | |
License Date: 1984-10-26 | |
License Status: RecCertified | |
Spud Date: 1984-11-06 | |
Final Drill Date: 1984-11-10 | |
Well Total Depth: 525.00 m | |
Surface Hole Latitude: 54.975595 | |
Surface Hole Longitude: -111.576364 |
Date | Event |
---|---|
1984-10-26 | Obtained License |
1984-11-08 | Surface Casing Operation Performed |
1984-11-09 | Well Log Performed |
1984-11-10 | Finished Drilling |
1984-11-10 | Well Mode changed to Drilled and Cased |
1984-11-11 | Production Casing Operation Performed |
1984-11-11 | Rig Released |
1984-11-15 | Perforation Treatment Performed - Jet Perforation |
1984-11-15 | Well Log Performed |
1984-12-19 | Well Began Production |
1984-12-19 | Well Fluid changed to Gas |
1984-12-19 | Well Mode changed to Flowing |
1985-01-04 | Well Log Performed |
1985-01-05 | Perforation Treatment Performed - Cement Squeeze |
1985-01-05 | Perforation Treatment Performed - Jet Perforation |
1985-06-01 | Well Fluid changed to Gas |
1985-06-01 | Well Mode changed to Suspended |
1991-02-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-02-01 | Plug Back Performed |
1991-02-01 | Well Abandoned |
1991-02-01 | Well Fluid changed to Gas |
1991-02-01 | Well Mode changed to Abandoned |
1991-02-02 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-11-15 | Perforation | 326.00 | 327.50 | 13 |
1985-01-05 | Perforation | 332.00 | 332.50 | 5 |
1985-01-05 | Cement Squeeze | 332.00 | 332.50 | 0 |
1991-02-01 | Packing Device Capped w/Cement | 316.00 | 323.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 159 | 0.0 | 0.0 | 0.0 |
1985 | 297 | 0.0 | 0.0 | 0.0 |
For data sources see[5]