X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695250916020

Well Details

Well ID: 0695250916020
Loading map...
Location: 02/16-09-069-25W5/0
Location Alias: 02/16-09-69-25 W5M
Location Alias 2: 02/16-09-069-25 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 25
Section: 09
County/Municipality: Municipal District of Greenview No. 16
Well Name: NAL CPC HZ 102 STURLKS 16-9-69-25
Operator Name: NAL Resources Limited
License Number: 0436200
License Date: 2011-08-19
License Status: Issued
Spud Date: 2011-09-30
Final Drill Date: 2011-10-13
Well Total Depth: 2787.00 m
Surface Hole Latitude: 54.973225
Surface Hole Longitude: -117.751799

For data sources see[1][2]

Well History

Date Event
2011-08-19 Obtained License
2011-10-01 Surface Casing Operation Performed
2011-10-04 Direction Drilling Operation Performed - Deviate
2011-10-07 Direction Drilling Operation Performed - Horizontal
2011-10-09 Intermediate Casing Operation Performed
2011-10-13 Finished Drilling
2011-10-13 Well Mode changed to Drilled and Cased
2011-10-15 Liner Casing Operation Performed
2011-10-15 Perforation Treatment Performed - Open-Hole Completion
2011-10-16 Rig Released
2011-10-21 Well Log Performed
2011-10-30 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-15 Perforation Treatment Performed - Jet Perforation
2011-12-16 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-17 Perforation Treatment Performed - Jet Perforation
2011-12-18 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-19 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-17 Well Began Production
2012-01-17 Well Fluid changed to Crude Oil
2012-01-17 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-04 1549.00 Deviate (5 - 79 degrees)
2011-10-07 1850.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-15 Open Hole/Barefoot Completion 2786.00 2787.00 0
2011-12-18 Multi-Stage Fracture 2247.00 2248.00 0
2011-12-18 Multi-Stage Fracture 2173.00 2174.00 0
2011-12-18 Multi-Stage Fracture 2100.00 2101.00 0
2011-12-18 Multi-Stage Fracture 2025.00 2026.00 0
2011-12-19 Multi-Stage Fracture 1951.00 1952.00 0
2011-12-19 Multi-Stage Fracture 1877.00 1878.00 0
2011-10-30 Multi-Stage Fracture 2690.00 2690.10 0
2011-10-31 Multi-Stage Fracture 2600.00 2600.10 0
2011-10-31 Multi-Stage Fracture 2521.70 2521.80 0
2011-12-15 Perforation 2410.00 2411.00 8
2011-12-16 Multi-Stage Fracture 2410.00 2411.00 0
2011-12-16 Multi-Stage Fracture 2335.00 2336.00 0
2011-12-17 Perforation 2247.00 2248.00 8
2011-12-17 Perforation 2173.00 2174.00 8

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 8056 0.0 0.0 0.0
2013 8493 0.0 0.0 0.0
2014 8315 0.0 0.0 0.0
2015 8297 0.0 0.0 0.0
2016 8664 0.0 0.0 0.0
2017 6050 0.0 0.0 0.0
2018 5523 0.0 0.0 0.0
2019 8687 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References