X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695251515020

Well Details

Well ID: 0695251515020
Loading map...
Location: 02/15-15-069-25W5/0
Location Alias: 02/15-15-69-25 W5M
Location Alias 2: 02/15-15-069-25 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 25
Section: 15
County/Municipality: Municipal District of Greenview No. 16
Well Name: NAL CPC 102 HZ STURLKS 15-15-69-25
Operator Name: NAL Resources Limited
License Number: 0411567
License Date: 2009-07-24
License Status: Amended
Spud Date: 2009-09-28
Final Drill Date: 2009-10-09
Well Total Depth: 2477.00 m
Surface Hole Latitude: 54.981499
Surface Hole Longitude: -117.736213

For data sources see[1][2]

Well History

Date Event
2009-07-24 Obtained License
2009-09-29 Surface Casing Operation Performed
2009-10-03 Direction Drilling Operation Performed - Horizontal
2009-10-03 Well Log Performed
2009-10-07 Intermediate Casing Operation Performed
2009-10-09 Finished Drilling
2009-10-09 Well Log Performed
2009-10-09 Well Mode changed to Drilled and Cased
2009-10-10 Liner Casing Operation Performed
2009-10-10 Perforation Treatment Performed - Open-Hole Completion
2009-10-11 Rig Released
2009-10-14 Well Log Performed
2009-11-23 Perforation Treatment Performed - Multi-Stage Fracture
2009-12-26 Well Began Production
2009-12-26 Well Fluid changed to Crude Oil
2009-12-26 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-10-03 1553.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-10-10 Open Hole/Barefoot Completion 1885.00 2475.00 0
2009-11-23 Multi-Stage Fracture 2458.80 2458.90 0
2009-11-23 Multi-Stage Fracture 2383.20 2383.30 0
2009-11-23 Multi-Stage Fracture 2272.20 2272.30 0
2009-11-23 Multi-Stage Fracture 2158.80 2158.90 0
2009-11-23 Multi-Stage Fracture 2046.80 2046.90 0
2009-11-23 Multi-Stage Fracture 1935.30 1935.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 144 0.0 0.0 0.0
2010 8615 0.0 0.0 0.0
2011 8667 0.0 0.0 0.0
2012 8462 0.0 0.0 0.0
2013 8679 0.0 0.0 0.0
2014 8411 0.0 0.0 0.0
2015 7392 0.0 0.0 0.0
2016 6332 0.0 0.0 0.0
2017 8615 0.0 0.0 0.0
2018 8733 0.0 0.0 0.0
2019 5786 0.0 0.0 0.0

For data sources see[6]

References