X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695251610000

Well Details

Well ID: 0695251610000
Loading map...
Location: 00/10-16-069-25W5/0
Location Alias: 00/10-16-69-25 W5M
Location Alias 2: 00/10-16-069-25 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 25
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: NAL CRESTAR STURLS 10-16-69-25
Operator Name: NAL Resources Limited
License Number: 0220476
License Date: 1999-01-06
License Status: Suspension
Spud Date: 1999-01-14
Final Drill Date: 1999-01-23
Well Total Depth: 1857.00 m
Surface Hole Latitude: 54.976194
Surface Hole Longitude: -117.747790

For data sources see[1][2]

Well History

Date Event
1999-01-06 Obtained License
1999-01-15 Surface Casing Operation Performed
1999-01-23 Drill Stem Test Performed
1999-01-23 Finished Drilling
1999-01-23 Well Log Performed
1999-01-24 Well Log Performed
1999-01-25 Drill Stem Test Performed
1999-01-25 Well Log Performed
1999-01-26 Drill Stem Test Performed
1999-01-27 Production Casing Operation Performed
1999-01-27 Rig Released
1999-01-27 Well Mode changed to Drilled and Cased
1999-02-04 Well Log Performed
1999-02-06 Perforation Treatment Performed - Jet Perforation
1999-02-06 Well Log Performed
1999-02-12 Perforation Treatment Performed - Fractured
1999-02-17 Well Began Production
1999-02-17 Well Fluid changed to Crude Oil
1999-02-17 Well Mode changed to Flowing
1999-02-22 Well Fluid changed to Crude Oil
1999-02-22 Well Mode changed to Suspended
1999-03-07 Well Log Performed
2001-04-25 Well Fluid changed to Crude Oil
2001-04-25 Well Mode changed to Flowing
2013-04-01 Well Fluid changed to Crude Oil
2013-04-01 Well Mode changed to Pumping
2013-06-01 Well Fluid changed to Crude Oil
2013-06-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-02-06 Perforation 1778.50 1779.50 14
1999-02-06 Perforation 1781.00 1783.00 14
1999-02-06 Perforation 1786.00 1788.00 14
1999-02-06 Perforation 1789.00 1790.50 14
1999-02-12 Fracture 1778.50 1790.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 5735 0.0 0.0 0.0
2002 8522 0.0 0.0 0.0
2003 8346 0.0 0.0 0.0
2004 8633 0.0 0.0 0.0
2005 7695 0.0 0.0 0.0
2006 8035 0.0 0.0 0.0
2007 8723 0.0 0.0 0.0
2008 8443 0.0 0.0 0.0
2009 8626 0.0 0.0 0.0
2010 8727 0.0 0.0 0.0
2011 8681 0.0 0.0 0.0
2012 8453 0.0 0.0 0.0
2013 3482 0.0 0.0 0.0

For data sources see[5]

References