If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0695252805020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.010795,"lon":-117.761889,"icon":""}]} |
| Location: 02/05-28-069-25W5/0 | |
| Location Alias: 02/05-28-69-25 W5M | |
| Location Alias 2: 02/05-28-069-25 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 069 | |
| Meridian: 5 | |
| Range: 25 | |
| Section: 28 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: NAL HZ 102 STURLKS 5-28-69-25 | |
| Operator Name: NAL Resources Limited | |
| License Number: 0411598 | |
| License Date: 2009-07-28 | |
| License Status: Issued | |
| Spud Date: 2009-10-12 | |
| Final Drill Date: 2009-10-24 | |
| Well Total Depth: 2851.00 m | |
| Surface Hole Latitude: 55.010795 | |
| Surface Hole Longitude: -117.761889 |
| Date | Event |
|---|---|
| 2009-07-28 | Obtained License |
| 2009-10-13 | Surface Casing Operation Performed |
| 2009-10-17 | Direction Drilling Operation Performed - Horizontal |
| 2009-10-19 | Well Log Performed |
| 2009-10-21 | Intermediate Casing Operation Performed |
| 2009-10-24 | Finished Drilling |
| 2009-10-24 | Well Log Performed |
| 2009-10-24 | Well Mode changed to Drilled and Cased |
| 2009-10-26 | Liner Casing Operation Performed |
| 2009-10-26 | Perforation Treatment Performed - Open-Hole Completion |
| 2009-10-27 | Rig Released |
| 2009-11-25 | Well Log Performed |
| 2009-12-09 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2009-12-30 | Well Began Production |
| 2009-12-30 | Well Fluid changed to Crude Oil |
| 2009-12-30 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2009-10-17 | 1558.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2009-10-26 | Open Hole/Barefoot Completion | 1898.00 | 2849.00 | 0 |
| 2009-12-09 | Multi-Stage Fracture | 1983.70 | 1983.80 | 0 |
| 2009-12-09 | Multi-Stage Fracture | 2832.80 | 2832.90 | 0 |
| 2009-12-09 | Multi-Stage Fracture | 2758.10 | 2758.20 | 0 |
| 2009-12-09 | Multi-Stage Fracture | 2645.80 | 2645.90 | 0 |
| 2009-12-09 | Multi-Stage Fracture | 2534.20 | 2534.30 | 0 |
| 2009-12-09 | Multi-Stage Fracture | 2422.50 | 2422.60 | 0 |
| 2009-12-09 | Multi-Stage Fracture | 2314.30 | 2314.40 | 0 |
| 2009-12-09 | Multi-Stage Fracture | 2202.70 | 2202.80 | 0 |
| 2009-12-09 | Multi-Stage Fracture | 2094.40 | 2094.50 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 72 | 0.0 | 0.0 | 0.0 |
| 2010 | 8747 | 0.0 | 0.0 | 0.0 |
| 2011 | 7689 | 0.0 | 0.0 | 0.0 |
| 2012 | 8420 | 0.0 | 0.0 | 0.0 |
| 2013 | 8584 | 0.0 | 0.0 | 0.0 |
| 2014 | 8480 | 0.0 | 0.0 | 0.0 |
| 2015 | 8252 | 0.0 | 0.0 | 0.0 |
| 2016 | 6397 | 0.0 | 0.0 | 0.0 |
| 2017 | 4788 | 0.0 | 0.0 | 0.0 |
| 2018 | 8685 | 0.0 | 0.0 | 0.0 |
| 2019 | 7859 | 0.0 | 0.0 | 0.0 |
| 2020 | 1568 | 0.0 | 0.0 | 0.0 |
For data sources see[6]