X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696031003020

Well Details

Well ID: 0696031003020
Loading map...
Location: 02/03-10-069-03W6/0
Location Alias: 02/03-10-69-03 W6M
Location Alias 2: 02/03-10-069-03 W6/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 03
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: VELVET 102 HZ BEZAN 3-10-69-3
Operator Name: Velvet Energy Ltd.
License Number: 0484596
License Date: 2017-07-19
License Status: Amended
Spud Date: 2018-01-14
Final Drill Date: 2018-01-26
Well Total Depth: 5575.00 m
Surface Hole Latitude: 54.939995
Surface Hole Longitude: -118.327463

For data sources see[1][2]

Well History

Date Event
2017-07-19 Obtained License
2018-01-15 Surface Casing Operation Performed
2018-01-16 Direction Drilling Operation Performed - Deviate
2018-01-19 Direction Drilling Operation Performed - Horizontal
2018-01-21 Well Log Performed
2018-01-26 Finished Drilling
2018-01-26 Well Log Performed
2018-01-26 Well Mode changed to Drilled and Cased
2018-01-27 Production Casing Operation Performed
2018-01-28 Rig Released
2018-05-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-27 Perforation Treatment Performed - Open-Hole Completion
2018-05-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-31 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-14 Well Began Production
2018-08-14 Well Fluid changed to Crude Oil
2018-08-14 Well Mode changed to Gas Lift

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-01-16 1163.80 Deviate (5 - 79 degrees)
2018-01-19 2433.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-05-27 Open Hole/Barefoot Completion 5560.70 5575.00 0
2018-05-28 Multi-Stage Fracture 5383.30 5383.40 0
2018-05-31 Multi-Stage Fracture 3793.60 3793.70 0
2018-05-31 Multi-Stage Fracture 3776.80 3776.90 0
2018-05-31 Multi-Stage Fracture 3758.40 3758.50 0
2018-05-31 Multi-Stage Fracture 3740.80 3740.90 0
2018-05-31 Multi-Stage Fracture 3772.90 3773.00 0
2018-05-31 Multi-Stage Fracture 3705.70 3705.80 0
2018-05-31 Multi-Stage Fracture 3688.10 3688.20 0
2018-05-31 Multi-Stage Fracture 3670.60 3670.70 0
2018-05-31 Multi-Stage Fracture 3653.10 3653.20 0
2018-05-31 Multi-Stage Fracture 3635.70 3635.80 0
2018-05-28 Multi-Stage Fracture 5366.10 5366.20 0
2018-06-01 Multi-Stage Fracture 3618.10 3618.20 0
2018-06-01 Multi-Stage Fracture 3600.70 3600.80 0
2018-06-01 Multi-Stage Fracture 3583.50 3583.60 0
2018-06-01 Multi-Stage Fracture 3566.00 3566.10 0
2018-06-01 Multi-Stage Fracture 3548.70 3548.80 0
2018-06-01 Multi-Stage Fracture 3531.40 3531.50 0
2018-06-01 Multi-Stage Fracture 3514.10 3514.20 0
2018-06-01 Multi-Stage Fracture 3496.80 3496.90 0
2018-06-01 Multi-Stage Fracture 3480.30 3480.40 0
2018-06-01 Multi-Stage Fracture 3462.80 3462.90 0
2018-05-28 Multi-Stage Fracture 5347.80 5347.90 0
2018-06-01 Multi-Stage Fracture 3445.40 3445.50 0
2018-06-01 Multi-Stage Fracture 3428.00 3428.10 0
2018-06-01 Multi-Stage Fracture 3412.70 3412.80 0
2018-06-01 Multi-Stage Fracture 3394.90 3395.00 0
2018-06-01 Multi-Stage Fracture 3377.40 3377.50 0
2018-06-01 Multi-Stage Fracture 3359.80 3359.90 0
2018-06-01 Multi-Stage Fracture 3342.40 3342.50 0
2018-06-01 Multi-Stage Fracture 3325.10 3325.20 0
2018-06-01 Multi-Stage Fracture 3307.20 3307.30 0
2018-06-01 Multi-Stage Fracture 3289.20 3289.30 0
2018-05-28 Multi-Stage Fracture 5330.10 5330.20 0
2018-06-01 Multi-Stage Fracture 3271.80 3271.90 0
2018-06-01 Multi-Stage Fracture 3254.30 3254.40 0
2018-06-01 Multi-Stage Fracture 3237.00 3237.10 0
2018-06-01 Multi-Stage Fracture 3219.00 3219.10 0
2018-06-01 Multi-Stage Fracture 3201.40 3201.50 0
2018-06-01 Multi-Stage Fracture 3184.10 3184.20 0
2018-06-01 Multi-Stage Fracture 3166.50 3166.60 0
2018-06-01 Multi-Stage Fracture 3149.30 3149.40 0
2018-06-01 Multi-Stage Fracture 3131.80 3131.90 0
2018-06-02 Multi-Stage Fracture 3114.50 3114.60 0
2018-05-28 Multi-Stage Fracture 5314.50 5314.60 0
2018-06-02 Multi-Stage Fracture 3096.60 3096.70 0
2018-06-02 Multi-Stage Fracture 3079.20 3079.30 0
2018-06-02 Multi-Stage Fracture 3061.60 3061.70 0
2018-06-02 Multi-Stage Fracture 3044.20 3044.30 0
2018-06-02 Multi-Stage Fracture 3026.60 3026.70 0
2018-06-02 Multi-Stage Fracture 3008.80 3008.90 0
2018-06-02 Multi-Stage Fracture 2991.50 2991.60 0
2018-06-02 Multi-Stage Fracture 2974.00 2974.10 0
2018-06-02 Multi-Stage Fracture 2956.80 2956.90 0
2018-06-02 Multi-Stage Fracture 2939.40 2939.50 0
2018-05-28 Multi-Stage Fracture 5296.20 5296.30 0
2018-06-02 Multi-Stage Fracture 2922.10 2922.20 0
2018-06-02 Multi-Stage Fracture 2905.00 2905.10 0
2018-06-02 Multi-Stage Fracture 2887.60 2887.70 0
2018-06-02 Multi-Stage Fracture 2870.50 2870.60 0
2018-06-02 Multi-Stage Fracture 2853.20 2853.30 0
2018-06-02 Multi-Stage Fracture 2834.80 2834.90 0
2018-06-02 Multi-Stage Fracture 2817.00 2817.10 0
2018-06-02 Multi-Stage Fracture 2799.60 2799.70 0
2018-06-02 Multi-Stage Fracture 2781.80 2781.90 0
2018-06-02 Multi-Stage Fracture 2764.80 2764.90 0
2018-05-28 Multi-Stage Fracture 5278.30 5278.40 0
2018-06-02 Multi-Stage Fracture 2747.00 2747.10 0
2018-06-02 Multi-Stage Fracture 2729.30 2729.40 0
2018-06-02 Multi-Stage Fracture 2711.40 2711.50 0
2018-06-02 Multi-Stage Fracture 2693.80 2693.90 0
2018-06-03 Multi-Stage Fracture 2676.60 2676.70 0
2018-06-03 Multi-Stage Fracture 2659.10 2659.20 0
2018-06-03 Multi-Stage Fracture 2642.00 2642.10 0
2018-05-28 Multi-Stage Fracture 5260.00 5260.10 0
2018-05-28 Multi-Stage Fracture 5241.60 5241.70 0
2018-05-28 Multi-Stage Fracture 5223.50 5223.60 0
2018-05-27 Multi-Stage Fracture 5523.10 5523.20 0
2018-05-28 Multi-Stage Fracture 5208.60 5208.70 0
2018-05-28 Multi-Stage Fracture 5190.50 5190.60 0
2018-05-28 Multi-Stage Fracture 5173.60 5173.70 0
2018-05-28 Multi-Stage Fracture 5155.90 5156.00 0
2018-05-28 Multi-Stage Fracture 5137.50 5137.60 0
2018-05-28 Multi-Stage Fracture 5119.10 5119.20 0
2018-05-28 Multi-Stage Fracture 5101.10 5101.20 0
2018-05-28 Multi-Stage Fracture 5082.60 5082.70 0
2018-05-28 Multi-Stage Fracture 5064.80 5064.90 0
2018-05-28 Multi-Stage Fracture 5046.50 5046.60 0
2018-05-27 Multi-Stage Fracture 5505.70 5505.80 0
2018-05-28 Multi-Stage Fracture 5028.60 5028.70 0
2018-05-28 Multi-Stage Fracture 5010.70 5010.80 0
2018-05-29 Multi-Stage Fracture 4992.90 4993.00 0
2018-05-29 Multi-Stage Fracture 4976.10 4976.20 0
2018-05-29 Multi-Stage Fracture 4957.70 4957.80 0
2018-05-29 Multi-Stage Fracture 4939.90 4940.00 0
2018-05-29 Multi-Stage Fracture 4922.10 4922.20 0
2018-05-29 Multi-Stage Fracture 4904.00 4904.10 0
2018-05-29 Multi-Stage Fracture 4885.60 4885.70 0
2018-05-29 Multi-Stage Fracture 4868.20 4868.30 0
2018-05-27 Multi-Stage Fracture 5487.70 5487.80 0
2018-05-29 Multi-Stage Fracture 4850.80 4850.90 0
2018-05-29 Multi-Stage Fracture 4832.40 4832.50 0
2018-05-29 Multi-Stage Fracture 4815.50 4815.60 0
2018-05-29 Multi-Stage Fracture 4797.60 4797.70 0
2018-05-29 Multi-Stage Fracture 4779.80 4779.90 0
2018-05-29 Multi-Stage Fracture 4762.10 4762.20 0
2018-05-29 Multi-Stage Fracture 4744.20 4744.30 0
2018-05-29 Multi-Stage Fracture 4727.20 4727.30 0
2018-05-29 Multi-Stage Fracture 4709.30 4709.40 0
2018-05-29 Multi-Stage Fracture 4692.10 4692.20 0
2018-05-27 Multi-Stage Fracture 5469.80 5469.90 0
2018-05-29 Multi-Stage Fracture 4673.70 4673.80 0
2018-05-29 Multi-Stage Fracture 4656.20 4656.30 0
2018-05-29 Multi-Stage Fracture 4638.20 4638.30 0
2018-05-29 Multi-Stage Fracture 4620.30 4620.40 0
2018-05-29 Multi-Stage Fracture 4601.90 4602.00 0
2018-05-29 Multi-Stage Fracture 4584.40 4584.50 0
2018-05-29 Multi-Stage Fracture 4566.00 4566.10 0
2018-05-30 Multi-Stage Fracture 4548.10 4548.20 0
2018-05-30 Multi-Stage Fracture 4531.40 4531.50 0
2018-05-30 Multi-Stage Fracture 4513.10 4513.20 0
2018-05-27 Multi-Stage Fracture 5452.70 5452.80 0
2018-05-30 Multi-Stage Fracture 4495.00 4495.10 0
2018-05-30 Multi-Stage Fracture 4477.20 4477.30 0
2018-05-30 Multi-Stage Fracture 4459.80 4459.90 0
2018-05-30 Multi-Stage Fracture 4441.90 4442.00 0
2018-05-30 Multi-Stage Fracture 4424.10 4424.20 0
2018-05-30 Multi-Stage Fracture 4406.60 4406.70 0
2018-05-30 Multi-Stage Fracture 4389.00 4389.10 0
2018-05-30 Multi-Stage Fracture 4371.10 4371.20 0
2018-05-30 Multi-Stage Fracture 4355.50 4355.60 0
2018-05-30 Multi-Stage Fracture 4338.20 4338.30 0
2018-05-27 Multi-Stage Fracture 5435.60 5435.70 0
2018-05-30 Multi-Stage Fracture 4320.30 4320.40 0
2018-05-30 Multi-Stage Fracture 4302.40 4302.50 0
2018-05-30 Multi-Stage Fracture 4284.60 4284.70 0
2018-05-30 Multi-Stage Fracture 4268.70 4268.80 0
2018-05-30 Multi-Stage Fracture 4252.10 4252.20 0
2018-05-30 Multi-Stage Fracture 4235.80 4235.90 0
2018-05-30 Multi-Stage Fracture 4220.10 4220.20 0
2018-05-30 Multi-Stage Fracture 4202.20 4202.30 0
2018-05-30 Multi-Stage Fracture 4184.90 4185.00 0
2018-05-30 Multi-Stage Fracture 4167.10 4167.20 0
2018-05-27 Multi-Stage Fracture 5418.80 5418.90 0
2018-05-30 Multi-Stage Fracture 4149.20 4149.30 0
2018-05-30 Multi-Stage Fracture 4131.40 4131.50 0
2018-05-30 Multi-Stage Fracture 4113.10 4113.20 0
2018-05-31 Multi-Stage Fracture 4095.90 4096.00 0
2018-05-31 Multi-Stage Fracture 4078.40 4078.50 0
2018-05-31 Multi-Stage Fracture 4062.30 4062.40 0
2018-05-31 Multi-Stage Fracture 4045.10 4045.20 0
2018-05-31 Multi-Stage Fracture 4024.70 4024.80 0
2018-05-31 Multi-Stage Fracture 4006.80 4006.90 0
2018-05-31 Multi-Stage Fracture 3989.60 3989.70 0
2018-05-27 Multi-Stage Fracture 5400.90 5401.00 0
2018-05-31 Multi-Stage Fracture 3971.50 3971.60 0
2018-05-31 Multi-Stage Fracture 3953.70 3953.80 0
2018-05-31 Multi-Stage Fracture 3936.30 3936.40 0
2018-05-31 Multi-Stage Fracture 3918.70 3918.80 0
2018-05-31 Multi-Stage Fracture 3900.50 3900.60 0
2018-05-31 Multi-Stage Fracture 3882.30 3882.40 0
2018-05-31 Multi-Stage Fracture 3865.20 3865.30 0
2018-05-31 Multi-Stage Fracture 3847.30 3847.40 0
2018-05-31 Multi-Stage Fracture 3829.30 3829.40 0
2018-05-31 Multi-Stage Fracture 3811.30 3811.40 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-05-27 2018-06-03 2,121 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* 7732-18-5 100 79.3122 N/A
Slickwater / HCl Schlumberger Quartz. Crystalline silica 14808-60-7 100 10.4071 N/A
Slickwater / HCl Schlumberger Energizing Fluid 1.2.4 Trimethylbenzene (impurity) 95-63-6 100 0 N/A
2-Propenamid (impurity) 79-06-1 100 0 N/A
Acetic acid 64-19-7 100 0.001 N/A
Acetic acid. potassium salt 127-08-2 100 0 N/A
Acrylamide. 2-acrylamido-2-methylpropanesulfonic
acid. sodiu
38193-60-1 100 0.0169 N/A
Alcohol. C11-14. ethoxylated 78330-21-9 100 0.0016 N/A
Alcohol. C7-9-iso. C8. ethoxylated 78330-19-5 100 0 N/A
Alcohol. C9-11-iso. C10. ethoxylated 78330-20-8 100 0 N/A
Alcohols. C14-15. ethoxylated (7EO) 68951-67-7 100 0 N/A
Alcohols. C9-11-iso-. C10-rich 68526-85-2 100 0.0007 N/A
Amines. dicoco alkylmethyl 61788-62-3 100 0 N/A
Ammonium. diallyldimethyl-. chloride. polymers 26062-79-3 100 0 N/A
Benzyldimethylammonium chloride 122-18-9 100 0 N/A
Benzyllauryldimethylammonium chloride 139-07-1 100 0 N/A
Copper(II) sulfate 7758-98-7 100 0 N/A
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 100 0 N/A
Dimethylbenzylmyristylammonium chloride 139-08-2 100 0 N/A
Distillates. petroleum. hydrotreated light 64742-47-8 100 0.015 N/A
Ethoxylated propoxylated 4-nonylphenol-formaldehyde resin 30846-35-6 100 0 N/A
Fatty acids. tall-oil 61790-12-3 100 0.0002 N/A
Formaldehyde 50-00-0 100 0 N/A
Glycine. n-[2-[bis(carboxymethyl)amino]ethyl]-n-(2-hydroxye
t
139-89-9 100 0.0012 N/A
Heavy aromatic naphtha 64742-94-5 100 0 N/A
Hexadec-1-ene 629-73-2 100 0 N/A
Hydrochloric acid 7647-01-0 100 0.065 N/A
Methanol 67-56-1 100 0.0054 N/A
Methyl oxirane polymer with oxirane 11/6/9003 100 0 N/A
N-Coco. 1.3-diaminopropane di-acetate 61791-64-8 100 0.0025 N/A
Naphthalene (Impurity) 91-20-3 100 0 N/A
Octadec-1-ene 112-88-9 100 0 N/A
Poly(oxy-1.2-ethanediyl).a-hydro-w-hydroxy-
Ethane-1.2-diol.
25322-68-3 100 0 N/A
Polyethylene glycol monohexyl ether 31726-34-8 100 0 N/A
Potassium oleate 143-18-0 100 0 N/A
Propan-2-ol 67-63-0 100 0 N/A
Propargyl alcohol 107-19-7 100 0 N/A
Sodium chloride 7647-14-5 100 0.0089 N/A
Sodium hydroxide 1310-73-2 100 0 N/A
Sorbitan monooleate 1338-43-8 100 0.0009 N/A
Sorbitan monooleate. ethoxylated 9005-65-6 100 0.0006 N/A
Tetrasodium ethylenediaminetetraacetate 64-02-8 100 0 N/A
Thiourea. polymer with formaldehyde and 1-phenylethanone 68527-49-1 100 0.0001 N/A
Trisodium nitrilotriacetate (impurity) 5064-31-3 100 0 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-05-27 2018-06-03 Surface Water - River 31968
2018-05-05 2018-05-05 Municipal Water 90
2018-05-06 2018-05-10 Oilfield Produced Water 2661

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2995 0.0 0.0 0.0
2019 8133 0.0 0.0 0.0
2020 2078 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-28 No Incident Encountered 0.00 0.00
2018-06-03 No Incident Encountered 0.00 0.00

For data sources see[9]

References