If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0696080313000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.937126,"lon":-119.118678,"icon":""}]} |
| Location: 00/13-03-069-08W6/0 | |
| Location Alias: 00/13-03-69-08 W6M | |
| Location Alias 2: 00/13-03-069-08 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 069 | |
| Meridian: 6 | |
| Range: 08 | |
| Section: 03 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: NUVISTA HZ ELM 13-3-69-8 | |
| Operator Name: NuVista Energy Ltd. | |
| License Number: 0452234 | |
| License Date: 2012-12-14 | |
| License Status: Suspension | |
| Spud Date: 2013-03-29 | |
| Final Drill Date: 2013-04-28 | |
| Well Total Depth: 4831.00 m | |
| Surface Hole Latitude: 54.937126 | |
| Surface Hole Longitude: -119.118678 |
| Date | Event |
|---|---|
| 2012-12-14 | Obtained License |
| 2013-03-31 | Surface Casing Operation Performed |
| 2013-04-09 | Direction Drilling Operation Performed - Deviate |
| 2013-04-15 | Direction Drilling Operation Performed - Horizontal |
| 2013-04-17 | Well Log Performed |
| 2013-04-18 | Intermediate Casing Operation Performed |
| 2013-04-28 | Finished Drilling |
| 2013-04-28 | Well Log Performed |
| 2013-04-28 | Well Mode changed to Drilled and Cased |
| 2013-04-30 | Well Log Performed |
| 2013-05-01 | Liner Casing Operation Performed |
| 2013-05-02 | Rig Released |
| 2013-05-11 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-05-12 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-05-13 | Well Fluid changed to Gas |
| 2013-05-13 | Well Mode changed to Testing |
| 2013-06-08 | Well Began Production |
| 2013-06-08 | Well Fluid changed to Gas |
| 2013-06-08 | Well Mode changed to Flowing |
| 2018-10-01 | Well Fluid changed to Gas |
| 2018-10-01 | Well Mode changed to Pumping |
| 2019-08-22 | Well Fluid changed to Gas |
| 2019-08-22 | Well Mode changed to Suspended |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2013-03-29 | Nabors Drilling Limited | 60 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2013-04-09 | 2546.40 | Deviate (5 - 79 degrees) |
| 2013-04-15 | 2901.80 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-05-11 | Multi-Stage Fracture | 4791.00 | 4791.10 | 0 |
| 2013-05-12 | Multi-Stage Fracture | 3787.50 | 3787.60 | 0 |
| 2013-05-12 | Multi-Stage Fracture | 3675.20 | 3675.30 | 0 |
| 2013-05-12 | Multi-Stage Fracture | 3564.80 | 3564.90 | 0 |
| 2013-05-12 | Multi-Stage Fracture | 3452.90 | 3453.00 | 0 |
| 2013-05-12 | Multi-Stage Fracture | 3343.80 | 3343.90 | 0 |
| 2013-05-12 | Multi-Stage Fracture | 3231.70 | 3231.80 | 0 |
| 2013-05-12 | Multi-Stage Fracture | 3144.80 | 3144.90 | 0 |
| 2013-05-11 | Multi-Stage Fracture | 4676.20 | 4676.30 | 0 |
| 2013-05-11 | Multi-Stage Fracture | 4565.60 | 4565.70 | 0 |
| 2013-05-11 | Multi-Stage Fracture | 4455.10 | 4455.20 | 0 |
| 2013-05-11 | Multi-Stage Fracture | 4345.80 | 4345.90 | 0 |
| 2013-05-11 | Multi-Stage Fracture | 4233.40 | 4233.50 | 0 |
| 2013-05-11 | Multi-Stage Fracture | 4121.20 | 4121.30 | 0 |
| 2013-05-11 | Multi-Stage Fracture | 4009.60 | 4009.70 | 0 |
| 2013-05-11 | Multi-Stage Fracture | 3899.60 | 3899.70 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-05-11 | 2013-05-12 | 2,792 | 0 | N/A |
| 2 | 2013-05-11 | 2013-05-11 | 2,792 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | No specific ingredients | Not Available | 100 | 87.8142 | N/A | |||
| Prime Plus (30/50) | Canyon | No specific ingredients | Not Available | 100 | 2.0963 | N/A | ||
| Prime Plus (40/70) | Canyon | No specific ingredients | Not Available | 100 | 2.263 | N/A | ||
| Sand (30/50) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 4.853 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 4.853 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 4.853 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 4.8529 | N/A | ||||
| Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0125 | N/A | |
| Water | 7732-18-5 | 100 | 0.0125 | N/A | ||||
| CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.0589 | N/A | |
| Water | 7732-18-5 | 100 | 0.0589 | N/A | ||||
| CAN-2057 Friction Reducer | Canyon | Friction Reducer | No hazardous ingredients | Not Available | 100 | 0.0468 | N/A | |
| CAN-2410 Demulsifier | Canyon | Surfactant | Methyl Alcohol | 67-56-1 | 100 | 0.0833 | N/A | |
| Water | 7732-18-5 | 100 | 0.0833 | N/A | ||||
| 2 | PR-6000 (30/50) | Canyon | No specific ingredients | Not Available | 100 | 1.4834 | N/A | |
| Sand (40/70) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 3.4437 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 3.4437 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 3.4437 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 3.4439 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2013-05-10 | 2013-05-12 | Surface Water - Runoff | 11704 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 4736 | 0.0 | 0.0 | 0.0 |
| 2014 | 5380 | 0.0 | 0.0 | 0.0 |
| 2015 | 4749 | 0.0 | 0.0 | 0.0 |
| 2016 | 24 | 0.0 | 0.0 | 0.0 |
| 2017 | 24 | 0.0 | 0.0 | 0.0 |
| 2018 | 264 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-05-03 | No Incident Encountered | 0.00 | 0.00 |
| 2013-05-15 | No Incident Encountered | 0.00 | 0.00 |
| 2019-08-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]