X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696080413000

Well Details

Well ID: 0696080413000
Loading map...
Location: 00/13-04-069-08W6/0
Location Alias: 00/13-04-69-08 W6M
Location Alias 2: 00/13-04-069-08 W6/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 08
Section: 04
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA HZ ELM 13-4-69-8
Operator Name: NuVista Energy Ltd.
License Number: 0483456
License Date: 2017-04-25
License Status: Issued
Spud Date: 2017-05-08
Final Drill Date: 2017-05-24
Well Total Depth: 4848.00 m
Surface Hole Latitude: 54.938929
Surface Hole Longitude: -119.142946

For data sources see[1][2]

Well History

Date Event
2017-04-25 Obtained License
2017-05-09 Surface Casing Operation Performed
2017-05-11 Direction Drilling Operation Performed - Deviate
2017-05-16 Direction Drilling Operation Performed - Horizontal
2017-05-16 Well Log Performed
2017-05-17 Intermediate Casing Operation Performed
2017-05-24 Finished Drilling
2017-05-24 Well Log Performed
2017-05-24 Well Mode changed to Drilled and Cased
2017-05-26 Liner Casing Operation Performed
2017-05-28 Perforation Treatment Performed - Open-Hole Completion
2017-05-28 Rig Released
2017-07-31 Perforation Treatment Performed - Jet Perforation
2017-07-31 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-01 Perforation Treatment Performed - Jet Perforation
2017-08-01 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-02 Perforation Treatment Performed - Jet Perforation
2017-08-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-03 Perforation Treatment Performed - Jet Perforation
2017-08-03 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-04 Perforation Treatment Performed - Jet Perforation
2017-08-04 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-05 Perforation Treatment Performed - Jet Perforation
2017-08-05 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-06 Perforation Treatment Performed - Jet Perforation
2017-08-06 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-07 Perforation Treatment Performed - Jet Perforation
2017-08-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-08 Perforation Treatment Performed - Jet Perforation
2017-08-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-09 Perforation Treatment Performed - Jet Perforation
2017-08-09 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-10 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-25 Well Began Production
2017-09-25 Well Fluid changed to Gas
2017-09-25 Well Mode changed to Flowing
2018-10-01 Well Fluid changed to Gas
2018-10-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-05-08 Nabors Drilling Canada Limited 60 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-05-11 1434.80 Deviate (5 - 79 degrees)
2017-05-16 2859.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-05-28 Open Hole/Barefoot Completion 4843.00 4848.00 0
2017-08-02 Multi-Stage Fracture 4485.80 4486.80 0
2017-08-02 Perforation 4399.90 4400.90 12
2017-08-02 Multi-Stage Fracture 4399.90 4400.90 0
2017-08-03 Perforation 4312.70 4313.70 12
2017-08-03 Multi-Stage Fracture 4312.70 4313.70 0
2017-08-03 Perforation 4224.60 4225.60 12
2017-08-03 Multi-Stage Fracture 4224.60 4225.60 0
2017-08-04 Perforation 4137.70 4138.70 12
2017-08-04 Multi-Stage Fracture 4137.70 4138.70 0
2017-08-04 Perforation 4051.20 4052.20 12
2017-07-31 Multi-Stage Fracture 4811.90 4812.90 0
2017-08-04 Multi-Stage Fracture 4051.20 4052.20 0
2017-08-04 Perforation 3963.90 3964.90 12
2017-08-04 Multi-Stage Fracture 3963.90 3964.90 0
2017-08-04 Perforation 3877.80 3878.80 12
2017-08-05 Multi-Stage Fracture 3877.80 3878.80 0
2017-08-05 Perforation 3792.10 3793.10 12
2017-08-05 Multi-Stage Fracture 3792.10 3793.10 0
2017-08-05 Perforation 3706.30 3707.30 12
2017-08-06 Multi-Stage Fracture 3706.30 3707.30 0
2017-08-06 Perforation 3620.40 3621.40 12
2017-07-31 Perforation 4738.90 4739.90 12
2017-08-06 Multi-Stage Fracture 3620.40 3621.40 0
2017-08-06 Perforation 3534.70 3535.70 12
2017-08-06 Multi-Stage Fracture 3534.70 3535.70 0
2017-08-06 Perforation 3450.40 3451.40 12
2017-08-07 Multi-Stage Fracture 3450.40 3451.40 0
2017-08-07 Perforation 3366.10 3367.10 12
2017-08-07 Multi-Stage Fracture 3366.10 3367.10 0
2017-08-08 Perforation 3281.80 3282.80 12
2017-08-08 Multi-Stage Fracture 3281.80 3282.80 0
2017-08-08 Perforation 3198.40 3199.40 12
2017-07-31 Multi-Stage Fracture 4738.90 4739.90 0
2017-08-08 Multi-Stage Fracture 3198.40 3199.40 0
2017-08-08 Perforation 3114.00 3115.00 12
2017-08-09 Multi-Stage Fracture 3114.00 3115.00 0
2017-08-09 Perforation 3034.90 3035.90 12
2017-08-09 Multi-Stage Fracture 3034.90 3035.90 0
2017-08-09 Perforation 2962.10 2963.10 12
2017-08-10 Multi-Stage Fracture 2962.10 2963.10 0
2017-07-31 Perforation 4655.60 4656.60 12
2017-08-01 Multi-Stage Fracture 4655.60 4656.60 0
2017-08-01 Perforation 4571.00 4572.00 12
2017-08-01 Multi-Stage Fracture 4571.00 4572.00 0
2017-08-01 Perforation 4485.80 4486.80 12

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-07-31 2017-08-10 2,719 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water 7732-18-5 100 88.9331 N/A
SAND-PREMIUM WHITE-30/50. BULK Halliburton Crystalline silica. quartz 14808-60-7 100 8.7395 N/A
SAND-PREMIUM WHITE-40/70. BULK Halliburton Crystalline silica. quartz 14808-60-7 100 2.1848 N/A
AP Breaker Halliburton Breaker Ammonium persulfate 7727-54-0 100 0.0002 N/A
FR-66 Halliburton Friction Reducer Ammonium chloride 12125-02-9 100 0.0474 N/A
Ethoxylated alcohols 9068 100 0.0474 N/A
Fatty nitrogen derived amides 9068 100 0.0474 N/A
Hydrotreated light petroleum distillate 64742-47-8 100 0.0474 N/A
Inert ingredient(s) Not Available 100 0.0474 N/A
Proprietary ingredient(s) Trade Secret 100 0.0486 N/A
LGC-36 UC Halliburton Gelling Agent Guar gum 9000-30-0 100 0.0148 N/A
Naphtha. hydrotreated heavy 64742-48-9 100 0.0148 N/A
Proprietary ingredient(s) Trade Secret 100 0.0152 N/A
OilPerm A Halliburton Surfactant Ethanol 64-17-5 100 0.0798 N/A
Heavy aromatic petroleum naphtha 64742-94-5 100 0.0798 N/A
Inert Ingredient(s) Not Available 100 0.0798 N/A
Naphthalene 91-20-3 100 0.0798 N/A
Poly(oxy-1.2-ethanediyl).alpha-(4-nonylphenyl)-omega-hydrox
y
127087-87-0 100 0.0798 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-08-03 2017-08-04 Surface Water - Runoff 4383
2017-08-04 2017-08-05 Surface Water - Runoff 5889
2017-07-29 2017-08-01 Surface Water - River 8500

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 1944 0.0 0.0 0.0
2018 3887 0.0 0.0 0.0
2019 8471 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-05-28 No Incident Encountered 0.00 0.00
2017-08-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References