If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0696080902000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/02-09-069-08W6/0 | |
Location Alias: 00/02-09-69-08 W6M | |
Location Alias 2: 00/02-09-069-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 6 | |
Range: 08 | |
Section: 09 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: NUVISTA HZ ELM 2-9-69-8 | |
Operator Name: NuVista Energy Ltd. | |
License Number: 0444411 | |
License Date: 2012-02-23 | |
License Status: Issued | |
Spud Date: 2012-03-10 | |
Final Drill Date: 2012-04-23 | |
Well Total Depth: 4320.00 m | |
Surface Hole Latitude: 54.942865 | |
Surface Hole Longitude: -119.138720 |
Date | Event |
---|---|
2012-02-23 | Obtained License |
2012-03-13 | Surface Casing Operation Performed |
2012-03-24 | Direction Drilling Operation Performed - Deviate |
2012-03-27 | Direction Drilling Operation Performed - Horizontal |
2012-03-31 | Well Log Performed |
2012-04-01 | Intermediate Casing Operation Performed |
2012-04-23 | Finished Drilling |
2012-04-23 | Well Mode changed to Drilled and Cased |
2012-04-24 | Well Log Performed |
2012-04-25 | Liner Casing Operation Performed |
2012-04-27 | Rig Released |
2012-06-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-20 | Well Fluid changed to Gas |
2012-06-20 | Well Mode changed to Testing |
2012-06-22 | Well Log Performed |
2012-09-18 | Well Began Production |
2012-09-18 | Well Fluid changed to Gas |
2012-09-18 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-03-10 | Trinidad Drilling Ltd. | 76 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-03-24 | 2438.10 | Deviate (5 - 79 degrees) |
2012-03-27 | 2794.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-06-16 | Multi-Stage Fracture | 4265.00 | 4265.10 | 0 |
2012-06-17 | Multi-Stage Fracture | 3384.50 | 3384.60 | 0 |
2012-06-18 | Multi-Stage Fracture | 3295.00 | 3295.10 | 0 |
2012-06-18 | Multi-Stage Fracture | 3192.20 | 3192.30 | 0 |
2012-06-18 | Multi-Stage Fracture | 3089.50 | 3089.60 | 0 |
2012-06-18 | Multi-Stage Fracture | 3000.10 | 3000.20 | 0 |
2012-06-18 | Multi-Stage Fracture | 2897.50 | 2897.60 | 0 |
2012-06-16 | Multi-Stage Fracture | 4171.00 | 4171.10 | 0 |
2012-06-16 | Multi-Stage Fracture | 4077.00 | 4077.10 | 0 |
2012-06-16 | Multi-Stage Fracture | 3974.00 | 3974.10 | 0 |
2012-06-16 | Multi-Stage Fracture | 3885.20 | 3885.30 | 0 |
2012-06-17 | Multi-Stage Fracture | 3782.30 | 3782.40 | 0 |
2012-06-17 | Multi-Stage Fracture | 3679.50 | 3679.60 | 0 |
2012-06-17 | Multi-Stage Fracture | 3590.00 | 3590.10 | 0 |
2012-06-17 | Multi-Stage Fracture | 3487.20 | 3487.30 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2487 | 0.0 | 0.0 | 0.0 |
2013 | 7145 | 0.0 | 0.0 | 0.0 |
2014 | 5811 | 0.0 | 0.0 | 0.0 |
2015 | 6779 | 0.0 | 0.0 | 0.0 |
2016 | 7008 | 0.0 | 0.0 | 0.0 |
2017 | 3781 | 0.0 | 0.0 | 0.0 |
2018 | 8135 | 0.0 | 0.0 | 0.0 |
2019 | 8735 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-04-27 | No Incident Encountered | 0.00 | 0.00 |
2012-06-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]