X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696080905000

Well Details

Well ID: 0696080905000
Loading map...
Location: 00/05-09-069-08W6/0
Location Alias: 00/05-09-69-08 W6M
Location Alias 2: 00/05-09-069-08 W6/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 08
Section: 09
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA HZ ELM 5-9-69-8
Operator Name: NuVista Energy Ltd.
License Number: 0483633
License Date: 2017-05-19
License Status: Issued
Spud Date: 2017-05-29
Final Drill Date: 2017-06-16
Well Total Depth: 5154.00 m
Surface Hole Latitude: 54.938929
Surface Hole Longitude: -119.142790

For data sources see[1][2]

Well History

Date Event
2017-05-19 Obtained License
2017-05-30 Surface Casing Operation Performed
2017-06-01 Direction Drilling Operation Performed - Deviate
2017-06-06 Direction Drilling Operation Performed - Horizontal
2017-06-06 Well Log Performed
2017-06-07 Intermediate Casing Operation Performed
2017-06-16 Finished Drilling
2017-06-16 Well Log Performed
2017-06-16 Well Mode changed to Drilled and Cased
2017-06-17 Liner Casing Operation Performed
2017-06-19 Rig Released
2017-06-21 Perforation Treatment Performed - Open-Hole Completion
2017-07-30 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-31 Perforation Treatment Performed - Jet Perforation
2017-07-31 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-01 Perforation Treatment Performed - Jet Perforation
2017-08-01 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-02 Perforation Treatment Performed - Jet Perforation
2017-08-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-03 Perforation Treatment Performed - Jet Perforation
2017-08-03 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-04 Perforation Treatment Performed - Jet Perforation
2017-08-04 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-05 Perforation Treatment Performed - Jet Perforation
2017-08-05 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-06 Perforation Treatment Performed - Jet Perforation
2017-08-06 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-07 Perforation Treatment Performed - Jet Perforation
2017-08-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-08 Perforation Treatment Performed - Jet Perforation
2017-08-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-09 Perforation Treatment Performed - Jet Perforation
2017-08-09 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-10 Perforation Treatment Performed - Jet Perforation
2017-08-10 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-26 Well Began Production
2017-09-26 Well Fluid changed to Gas
2017-09-26 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-05-29 Nabors Drilling Limited 60 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-06-01 1823.80 Deviate (5 - 79 degrees)
2017-06-06 2842.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-06-21 Open Hole/Barefoot Completion 5080.00 5154.00 0
2017-08-01 Multi-Stage Fracture 4684.30 4885.30 0
2017-08-01 Perforation 4598.30 4599.30 12
2017-08-01 Multi-Stage Fracture 4598.30 4599.30 0
2017-08-01 Perforation 4512.90 4513.90 12
2017-08-01 Multi-Stage Fracture 4512.90 4513.90 0
2017-08-01 Perforation 4428.40 4429.40 12
2017-08-02 Multi-Stage Fracture 4428.40 4429.40 0
2017-08-02 Perforation 4343.50 4344.50 12
2017-08-02 Multi-Stage Fracture 4343.50 4344.50 0
2017-08-03 Perforation 4258.10 4259.10 12
2017-07-30 Multi-Stage Fracture 5036.50 5037.50 0
2017-08-03 Multi-Stage Fracture 4258.10 4259.10 0
2017-08-03 Perforation 4172.40 4173.40 12
2017-08-04 Multi-Stage Fracture 4172.40 4173.40 0
2017-08-04 Perforation 4086.60 4087.60 12
2017-08-04 Multi-Stage Fracture 4086.60 4087.60 0
2017-08-04 Perforation 4000.70 4001.70 12
2017-08-05 Multi-Stage Fracture 4000.70 4001.70 0
2017-08-05 Perforation 3914.50 3915.50 12
2017-08-05 Multi-Stage Fracture 3914.50 3915.50 0
2017-08-05 Perforation 3828.50 3829.50 12
2017-07-31 Perforation 4949.60 4950.60 12
2017-08-06 Multi-Stage Fracture 3828.50 3829.50 0
2017-08-06 Perforation 3742.00 3743.00 12
2017-08-06 Multi-Stage Fracture 3742.00 3743.00 0
2017-08-06 Perforation 3650.80 3651.80 12
2017-08-07 Multi-Stage Fracture 3650.80 3651.80 0
2017-08-07 Perforation 3559.70 3560.70 12
2017-08-07 Multi-Stage Fracture 3559.70 3560.70 0
2017-08-07 Perforation 3473.50 3474.50 12
2017-08-08 Multi-Stage Fracture 3473.50 3474.50 0
2017-08-08 Perforation 3385.60 3386.60 12
2017-07-31 Multi-Stage Fracture 4949.60 4950.60 0
2017-08-08 Multi-Stage Fracture 3385.60 3386.60 0
2017-08-08 Perforation 3293.80 3294.80 12
2017-08-08 Multi-Stage Fracture 3293.80 3294.80 0
2017-08-08 Perforation 3201.40 3202.40 12
2017-08-09 Multi-Stage Fracture 3201.40 3202.40 0
2017-08-09 Perforation 3109.80 3110.80 12
2017-08-09 Multi-Stage Fracture 3109.80 3110.80 0
2017-08-09 Perforation 3017.90 3018.90 12
2017-08-10 Multi-Stage Fracture 3017.90 3018.90 0
2017-08-10 Perforation 2926.00 2927.00 12
2017-07-31 Perforation 4857.60 4858.60 12
2017-08-10 Multi-Stage Fracture 2926.00 2927.00 0
2017-07-31 Multi-Stage Fracture 4857.60 4858.60 0
2017-07-31 Perforation 4769.40 4770.40 12
2017-08-01 Multi-Stage Fracture 4769.40 4770.40 0
2017-08-01 Perforation 4684.30 4685.30 12

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-07-30 2017-08-10 2,717 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water 7732-18-5 100 89.1595 N/A
SAND-PREMIUM WHITE-30/50. BULK Halliburton Crystalline silica. quartz 14808-60-7 100 8.5558 N/A
SAND-PREMIUM WHITE-40/70. BULK Halliburton Crystalline silica. quartz 14808-60-7 100 2.1391 N/A
AP Breaker Halliburton Breaker Ammonium persulfate 7727-54-0 100 0.0002 N/A
FR-66 Halliburton Friction Reducer Ammonium chloride 12125-02-9 100 0.0521 N/A
Ethoxylated alcohols 9068 100 0.0521 N/A
Fatty nitrogen derived amides 9068 100 0.0521 N/A
Hydrotreated light petroleum distillate 64742-47-8 100 0.0521 N/A
Inert ingredient(s) Not Available 100 0.0521 N/A
Proprietary ingredient(s) Trade Secret 100 0.0532 N/A
LGC-36 UC Halliburton Gelling Agent Guar gum 9000-30-0 100 0.018 N/A
Naphtha. hydrotreated heavy 64742-48-9 100 0.018 N/A
Proprietary ingredient(s) Trade Secret 100 0.0183 N/A
OilPerm A Halliburton Surfactant Ethanol 64-17-5 100 0.0757 N/A
Heavy aromatic petroleum naphtha 64742-94-5 100 0.0757 N/A
Inert Ingredient(s) Not Available 100 0.0757 N/A
Naphthalene 91-20-3 100 0.0757 N/A
Poly(oxy-1.2-ethanediyl).alpha-(4-nonylphenyl)-omega-hydrox
y
127087-87-0 100 0.0757 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-08-04 2017-08-06 Surface Water - Runoff 6000
2017-07-29 2017-08-01 Surface Water - Runoff 5862
2017-07-20 2017-07-22 Surface Water - Runoff 4313
2017-08-06 2017-08-08 Surface Water - Runoff 5064

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 1704 0.0 0.0 0.0
2018 7751 0.0 0.0 0.0
2019 8687 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-06-21 No Incident Encountered 0.00 0.00
2017-08-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References