X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696082304000

Well Details

Well ID: 0696082304000
Loading map...
Location: 00/04-23-069-08W6/0
Location Alias: 00/04-23-69-08 W6M
Location Alias 2: 00/04-23-069-08 W6/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 08
Section: 23
County/Municipality: Municipal District of Greenview No. 16
Well Name: CARDINAL ELM 4-23-69-8
Operator Name: Cardinal Energy Ltd.
License Number: 0209307
License Date: 1997-11-26
License Status: Amended
Spud Date: 1997-12-07
Final Drill Date: 1997-12-26
Well Total Depth: 2825.00 m
Surface Hole Latitude: 54.983089
Surface Hole Longitude: -119.117055

For data sources see[1][2]

Well History

Date Event
1997-11-26 Obtained License
1997-12-08 Surface Casing Operation Performed
1997-12-26 Finished Drilling
1997-12-26 Well Mode changed to Drilled and Cased
1997-12-27 Well Log Performed
1997-12-29 Production Casing Operation Performed
1997-12-29 Rig Released
1998-02-11 Perforation Treatment Performed - Jet Perforation
1998-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-08-10 Plug Back Performed
1998-08-12 Perforation Treatment Performed - Jet Perforation
1998-08-17 Perforation Treatment Performed - Fractured
1998-11-12 Well Began Production
1998-11-12 Well Fluid changed to Gas
1998-11-12 Well Mode changed to Flowing
2004-01-10 Perforation Treatment Performed - Cement Squeeze
2004-01-10 Perforation Treatment Performed - Jet Perforation
2004-01-12 Perforation Treatment Performed - Jet Perforation
2004-01-13 Perforation Treatment Performed - Cement Squeeze
2004-02-23 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-02-11 Perforation 2430.50 2436.00 13
2004-02-23 Chemical Squeeze 2308.00 2312.00 0
1998-02-12 Acid Treatment 2430.50 2436.00 0
1998-08-10 Packing Device Capped w/Cement 2408.00 2416.00 0
1998-08-12 Perforation 2308.00 2312.50 13
1998-08-17 Fracture 2308.00 2312.50 0
2004-01-10 Perforation 1351.00 1352.00 20
2004-01-10 Cement Squeeze 1351.00 1352.00 0
2004-01-12 Perforation 810.00 811.00 20
2004-01-13 Cement Squeeze 810.00 811.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 584 0.0 0.0 0.0
1999 5284 0.0 0.0 0.0
2000 8539 0.0 0.0 0.0
2001 8190 0.0 0.0 0.0
2002 6914 0.0 0.0 0.0
2003 8236 0.0 0.0 0.0
2004 1542 0.0 0.0 0.0
2005 7918 0.0 0.0 0.0
2006 8280 0.0 0.0 0.0
2007 8070 0.0 0.0 0.0
2008 4150 0.0 0.0 0.0
2009 8615 0.0 0.0 0.0
2010 8519 0.0 0.0 0.0
2011 8663 0.0 0.0 0.0
2012 8040 0.0 0.0 0.0
2013 8447 0.0 0.0 0.0
2014 6936 0.0 0.0 0.0
2015 5807 0.0 0.0 0.0
2016 8039 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References