X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705031604000

Well Details

Well ID: 0705031604000
Loading map...
Location: 00/04-16-070-03W5/0
Location Alias: 00/04-16-70-03 W5M
Location Alias 2: 00/04-16-070-03 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 03
Section: 16
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CARDINAL MITSUE 4-16-70-3
Operator Name: Cardinal Energy Ltd.
License Number: 0029593
License Date: 1965-12-13
License Status: Issued
Spud Date: 1965-12-24
Final Drill Date: 1966-01-07
Well Total Depth: 1734.30 m
Surface Hole Latitude: 55.056081
Surface Hole Longitude: -114.405566

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-12-13 Obtained License
1966-01-07 Finished Drilling
1966-01-07 Well Mode changed to Drilled and Cased
1966-01-08 Production Casing Operation Performed
1966-01-22 Perforation Treatment Performed - Jet Perforation
1966-01-23 Well Began Production
1966-01-23 Well Fluid changed to Crude Oil
1966-01-23 Well Mode changed to Flowing
1966-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-03-12 Perforation Treatment Performed - Fractured
1978-04-27 Well Fluid changed to Crude Oil
1978-04-27 Well Mode changed to Suspended
1992-08-12 Well Fluid changed to Crude Oil
1992-08-12 Well Mode changed to Flowing
2000-10-25 Well Fluid changed to Crude Oil
2000-10-25 Well Mode changed to Pumping
2009-11-24 Perforation Treatment Performed - Chemical Squeeze
2010-10-03 Perforation Treatment Performed - Jet Perforation
2010-10-03 Well Log Performed
2010-10-08 Perforation Treatment Performed - Fractured
2010-10-15 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-01-22 Perforation 1715.40 1718.50 7
1966-03-12 Acid Treatment 1715.40 1718.50 0
1966-03-12 Fracture 1715.40 1718.50 0
2009-11-24 Chemical Squeeze 1715.40 1718.50 0
2010-10-03 Perforation 1715.40 1717.40 13
2010-10-08 Fracture 1715.40 1718.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 1958 0.0 0.0 0.0
1968 1567 0.0 0.0 0.0
1992 2667 0.0 0.0 0.0
1993 232 0.0 0.0 0.0
1994 1344 0.0 0.0 0.0
1995 1764 0.0 0.0 0.0
1998 6712 0.0 0.0 0.0
1999 8470 0.0 0.0 0.0
2000 8616 0.0 0.0 0.0
2001 7314 0.0 0.0 0.0
2002 7548 0.0 0.0 0.0
2003 6360 0.0 0.0 0.0
2004 6170 0.0 0.0 0.0
2005 8184 0.0 0.0 0.0
2006 7260 0.0 0.0 0.0
2007 7308 0.0 0.0 0.0
2008 6292 0.0 0.0 0.0
2009 7818 0.0 0.0 0.0
2010 7841 0.0 0.0 0.0
2011 7576 0.0 0.0 0.0
2012 8052 0.0 0.0 0.0
2013 8684 0.0 0.0 0.0
2014 7625 0.0 0.0 0.0
2015 7337 0.0 0.0 0.0
2016 4492 0.0 0.0 0.0
2017 6266 0.0 0.0 0.0
2018 8090 0.0 0.0 0.0
2019 3538 0.0 0.0 0.0

For data sources see[5]

References