X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705032101000

Well Details

Well ID: 0705032101000
Loading map...
Location: 00/01-21-070-03W5/0
Location Alias: 00/01-21-70-03 W5M
Location Alias 2: 00/01-21-070-03 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 03
Section: 21
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: SUMMERLAND MITSUE 1-21-70-3
Operator Name: Cardinal Energy Ltd.
License Number: 0444763
License Date: 2012-03-08
License Status: Suspension
Spud Date: 2012-05-30
Final Drill Date: 2012-06-22
Well Total Depth: 2823.00 m
Surface Hole Latitude: 55.070208
Surface Hole Longitude: -114.403560

For data sources see[1][2]

Well History

Date Event
2012-03-08 Obtained License
2012-05-31 Surface Casing Operation Performed
2012-06-06 Direction Drilling Operation Performed - Deviate
2012-06-09 Direction Drilling Operation Performed - Horizontal
2012-06-09 Well Log Performed
2012-06-11 Intermediate Casing Operation Performed
2012-06-22 Finished Drilling
2012-06-22 Well Mode changed to Drilled and Cased
2012-06-25 Liner Casing Operation Performed
2012-06-27 Perforation Treatment Performed - Open-Hole Completion
2012-06-27 Rig Released
2012-07-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-18 Well Began Production
2019-03-18 Well Fluid changed to Gas
2019-03-18 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-05-29 Precision Drilling Corporation 419 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-06-06 1568.40 Deviate (5 - 79 degrees)
2012-06-09 1841.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-06-27 Open Hole/Barefoot Completion 2772.60 2823.00 0
2012-07-16 Multi-Stage Fracture 2148.60 2216.60 0
2012-07-16 Multi-Stage Fracture 2080.50 2148.60 0
2012-07-16 Multi-Stage Fracture 2012.90 2080.50 0
2012-07-16 Multi-Stage Fracture 1919.50 2012.90 0
2012-07-16 Multi-Stage Fracture 1889.20 1919.50 0
2012-07-15 Multi-Stage Fracture 2733.00 2823.00 0
2012-07-15 Multi-Stage Fracture 2648.10 2716.10 0
2012-07-15 Multi-Stage Fracture 2568.30 2648.10 0
2012-07-15 Multi-Stage Fracture 2500.50 2568.30 0
2012-07-15 Multi-Stage Fracture 2432.30 2500.50 0
2012-07-15 Multi-Stage Fracture 2364.30 2432.30 0
2012-07-15 Multi-Stage Fracture 2284.40 2364.30 0
2012-07-15 Multi-Stage Fracture 2216.60 2284.40 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 6711 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-29 No Incident Encountered 0.00 0.00
2012-07-21 No Incident Encountered 0.00 0.00

For data sources see[8]

References