X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705230905000

Well Details

Well ID: 0705230905000
Loading map...
Location: 00/05-09-070-23W5/0
Location Alias: 00/05-09-70-23 W5M
Location Alias 2: 00/05-09-070-23 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 23
Section: 09
County/Municipality: Sturgeon Lake 154
Well Name: WINSTAR STURLS 9-8-70-23
Operator Name: Serinus Energy Inc.
License Number: 0027601
License Date: 1965-01-22
License Status: Suspension
Spud Date: 1965-01-25
Final Drill Date: 1965-02-21
Well Total Depth: 2676.10 m
Surface Hole Latitude: 55.044895
Surface Hole Longitude: -117.455502

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-01-22 Obtained License
1965-02-21 Finished Drilling
1965-02-21 Well Mode changed to Drilled and Cased
1965-02-24 Drill Stem Test Performed
1965-02-28 Production Casing Operation Performed
1965-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-03-03 Perforation Treatment Performed - Jet Perforation
1965-03-05 Perforation Treatment Performed - Cement Squeeze
1965-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-03-06 Perforation Treatment Performed - Jet Perforation
1965-03-08 Perforation Treatment Performed - Cement Squeeze
1965-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-03-09 Perforation Treatment Performed - Jet Perforation
1965-04-12 Well Began Production
1965-04-12 Well Fluid changed to Crude Oil
1965-04-12 Well Mode changed to Flowing
1973-06-11 Well Fluid changed to Crude Oil
1973-06-11 Well Mode changed to Pumping
1975-09-01 Well Fluid changed to Crude Oil
1975-09-01 Well Mode changed to Suspended
1981-10-08 Well Fluid changed to Crude Oil
1981-10-08 Well Mode changed to Pumping
1996-11-01 Well Log Performed
1996-11-03 Perforation Treatment Performed - Cement Squeeze
1996-11-04 Perforation Treatment Performed - Jet Perforation
1996-11-04 Well Log Performed
1996-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-08 Perforation Treatment Performed - Jet Perforation
1996-11-08 Well Log Performed
1996-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-11 Well Log Performed
1996-11-12 Perforation Treatment Performed - Jet Perforation
1996-11-15 Perforation Treatment Performed - Jet Perforation
1996-11-15 Well Log Performed
1996-12-01 Well Fluid changed to Crude Oil
1996-12-01 Well Mode changed to Suspended
1999-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-08 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-03-03 Perforation 2662.10 2663.00 13
1996-11-04 Perforation 2652.30 2654.80 13
1996-11-06 Acid Treatment 2652.30 2654.80 0
1996-11-08 Perforation 2646.30 2648.00 13
1996-11-10 Acid Treatment 2646.30 2648.00 0
1996-11-12 Perforation 2570.50 2572.00 13
1996-11-15 Perforation 2564.00 2567.00 13
1999-06-08 Acid Treatment 2564.00 2572.00 0
1999-06-08 Chemical Squeeze 2564.00 2572.00 0
1965-03-03 Acid Treatment 2662.10 2663.00 0
1965-03-05 Cement Squeeze 2662.10 2663.00 0
1965-03-06 Perforation 2662.10 2663.00 3
1965-03-06 Acid Treatment 2662.10 2663.00 0
1965-03-08 Cement Squeeze 2662.10 2663.00 0
1965-03-09 Perforation 2656.00 2656.90 13
1965-03-09 Acid Treatment 2656.00 2656.90 0
1996-11-03 Cement Squeeze 2656.00 2656.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5747 0.0 0.0 0.0
1968 3198 0.0 0.0 0.0
1969 5426 0.0 0.0 0.0
1970 5428 0.0 0.0 0.0
1971 5182 0.0 0.0 0.0
1972 5045 0.0 0.0 0.0
1973 4702 0.0 0.0 0.0
1974 2996 0.0 0.0 0.0
1975 2636 0.0 0.0 0.0
1981 1888 0.0 0.0 0.0
1982 8055 0.0 0.0 0.0
1983 7597 0.0 0.0 0.0
1984 7732 0.0 0.0 0.0
1985 7848 0.0 0.0 0.0
1986 8146 0.0 0.0 0.0
1987 7750 0.0 0.0 0.0
1988 8348 0.0 0.0 0.0
1989 7814 0.0 0.0 0.0
1990 8063 0.0 0.0 0.0
1991 1884 0.0 0.0 0.0
1993 2130 0.0 0.0 0.0
1994 7214 0.0 0.0 0.0
1995 5700 0.0 0.0 0.0
1996 6466 0.0 0.0 0.0

For data sources see[5]

References