If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0705230905000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.044895,"lon":-117.455502,"icon":""}]} |
Location: 00/05-09-070-23W5/0 | |
Location Alias: 00/05-09-70-23 W5M | |
Location Alias 2: 00/05-09-070-23 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 070 | |
Meridian: 5 | |
Range: 23 | |
Section: 09 | |
County/Municipality: Sturgeon Lake 154 | |
Well Name: WINSTAR STURLS 9-8-70-23 | |
Operator Name: Serinus Energy Inc. | |
License Number: 0027601 | |
License Date: 1965-01-22 | |
License Status: Suspension | |
Spud Date: 1965-01-25 | |
Final Drill Date: 1965-02-21 | |
Well Total Depth: 2676.10 m | |
Surface Hole Latitude: 55.044895 | |
Surface Hole Longitude: -117.455502 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1965-01-22 | Obtained License |
1965-02-21 | Finished Drilling |
1965-02-21 | Well Mode changed to Drilled and Cased |
1965-02-24 | Drill Stem Test Performed |
1965-02-28 | Production Casing Operation Performed |
1965-03-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-03-03 | Perforation Treatment Performed - Jet Perforation |
1965-03-05 | Perforation Treatment Performed - Cement Squeeze |
1965-03-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-03-06 | Perforation Treatment Performed - Jet Perforation |
1965-03-08 | Perforation Treatment Performed - Cement Squeeze |
1965-03-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-03-09 | Perforation Treatment Performed - Jet Perforation |
1965-04-12 | Well Began Production |
1965-04-12 | Well Fluid changed to Crude Oil |
1965-04-12 | Well Mode changed to Flowing |
1973-06-11 | Well Fluid changed to Crude Oil |
1973-06-11 | Well Mode changed to Pumping |
1975-09-01 | Well Fluid changed to Crude Oil |
1975-09-01 | Well Mode changed to Suspended |
1981-10-08 | Well Fluid changed to Crude Oil |
1981-10-08 | Well Mode changed to Pumping |
1996-11-01 | Well Log Performed |
1996-11-03 | Perforation Treatment Performed - Cement Squeeze |
1996-11-04 | Perforation Treatment Performed - Jet Perforation |
1996-11-04 | Well Log Performed |
1996-11-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-11-08 | Perforation Treatment Performed - Jet Perforation |
1996-11-08 | Well Log Performed |
1996-11-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-11-11 | Well Log Performed |
1996-11-12 | Perforation Treatment Performed - Jet Perforation |
1996-11-15 | Perforation Treatment Performed - Jet Perforation |
1996-11-15 | Well Log Performed |
1996-12-01 | Well Fluid changed to Crude Oil |
1996-12-01 | Well Mode changed to Suspended |
1999-06-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-06-08 | Perforation Treatment Performed - Chemical Squeeze |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1965-03-03 | Perforation | 2662.10 | 2663.00 | 13 |
1996-11-04 | Perforation | 2652.30 | 2654.80 | 13 |
1996-11-06 | Acid Treatment | 2652.30 | 2654.80 | 0 |
1996-11-08 | Perforation | 2646.30 | 2648.00 | 13 |
1996-11-10 | Acid Treatment | 2646.30 | 2648.00 | 0 |
1996-11-12 | Perforation | 2570.50 | 2572.00 | 13 |
1996-11-15 | Perforation | 2564.00 | 2567.00 | 13 |
1999-06-08 | Acid Treatment | 2564.00 | 2572.00 | 0 |
1999-06-08 | Chemical Squeeze | 2564.00 | 2572.00 | 0 |
1965-03-03 | Acid Treatment | 2662.10 | 2663.00 | 0 |
1965-03-05 | Cement Squeeze | 2662.10 | 2663.00 | 0 |
1965-03-06 | Perforation | 2662.10 | 2663.00 | 3 |
1965-03-06 | Acid Treatment | 2662.10 | 2663.00 | 0 |
1965-03-08 | Cement Squeeze | 2662.10 | 2663.00 | 0 |
1965-03-09 | Perforation | 2656.00 | 2656.90 | 13 |
1965-03-09 | Acid Treatment | 2656.00 | 2656.90 | 0 |
1996-11-03 | Cement Squeeze | 2656.00 | 2656.90 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 5747 | 0.0 | 0.0 | 0.0 |
1968 | 3198 | 0.0 | 0.0 | 0.0 |
1969 | 5426 | 0.0 | 0.0 | 0.0 |
1970 | 5428 | 0.0 | 0.0 | 0.0 |
1971 | 5182 | 0.0 | 0.0 | 0.0 |
1972 | 5045 | 0.0 | 0.0 | 0.0 |
1973 | 4702 | 0.0 | 0.0 | 0.0 |
1974 | 2996 | 0.0 | 0.0 | 0.0 |
1975 | 2636 | 0.0 | 0.0 | 0.0 |
1981 | 1888 | 0.0 | 0.0 | 0.0 |
1982 | 8055 | 0.0 | 0.0 | 0.0 |
1983 | 7597 | 0.0 | 0.0 | 0.0 |
1984 | 7732 | 0.0 | 0.0 | 0.0 |
1985 | 7848 | 0.0 | 0.0 | 0.0 |
1986 | 8146 | 0.0 | 0.0 | 0.0 |
1987 | 7750 | 0.0 | 0.0 | 0.0 |
1988 | 8348 | 0.0 | 0.0 | 0.0 |
1989 | 7814 | 0.0 | 0.0 | 0.0 |
1990 | 8063 | 0.0 | 0.0 | 0.0 |
1991 | 1884 | 0.0 | 0.0 | 0.0 |
1993 | 2130 | 0.0 | 0.0 | 0.0 |
1994 | 7214 | 0.0 | 0.0 | 0.0 |
1995 | 5700 | 0.0 | 0.0 | 0.0 |
1996 | 6466 | 0.0 | 0.0 | 0.0 |
For data sources see[5]