If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0706051215003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.053274,"lon":-118.624271,"icon":""}]} |
| Location: 00/15-12-070-05W6/3 | |
| Location Alias: 00/15-12-70-05 W6M | |
| Location Alias 2: 00/15-12-070-05 W6/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 070 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 12 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TOURNEX ELM 14-12-70-5 | |
| Operator Name: Raimount Energy Corp. | |
| License Number: 0393628 | |
| License Date: 2008-02-06 | |
| License Status: Suspension | |
| Spud Date: 2008-02-13 | |
| Final Drill Date: 2008-02-29 | |
| Well Total Depth: 2093.00 m | |
| Surface Hole Latitude: 55.053274 | |
| Surface Hole Longitude: -118.624271 |
| Date | Event |
|---|---|
| 2008-02-06 | Obtained License |
| 2008-02-14 | Surface Casing Operation Performed |
| 2008-02-25 | Direction Drilling Operation Performed - Deviate |
| 2008-02-29 | Finished Drilling |
| 2008-02-29 | Well Mode changed to Drilled and Cased |
| 2008-03-01 | Well Log Performed |
| 2008-03-02 | Drill Stem Test Performed |
| 2008-03-03 | Production Casing Operation Performed |
| 2008-03-03 | Rig Released |
| 2008-03-08 | Perforation Treatment Performed - Jet Perforation |
| 2008-03-09 | Well Log Performed |
| 2008-03-12 | Perforation Treatment Performed - Fractured |
| 2008-03-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2008-03-14 | Perforation Treatment Performed - Jet Perforation |
| 2008-03-14 | Plug Back Performed |
| 2008-03-15 | Perforation Treatment Performed - Fractured |
| 2009-01-03 | Well Began Production |
| 2009-01-03 | Well Fluid changed to Gas |
| 2009-01-03 | Well Mode changed to Flowing |
| 2019-04-01 | Well Fluid changed to Gas |
| 2019-04-01 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2008-02-25 | 600.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2008-03-08 | Perforation | 2042.50 | 2044.00 | 20 |
| 2008-03-12 | Fracture | 2042.50 | 2044.00 | 0 |
| 2008-03-14 | Packing Device Capped w/Cement | 2029.00 | 2037.00 | 0 |
| 2008-03-14 | Perforation | 1858.00 | 1864.50 | 20 |
| 2008-03-15 | Fracture | 1858.00 | 1864.50 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 7293 | 0.0 | 0.0 | 0.0 |
| 2010 | 6494 | 0.0 | 0.0 | 0.0 |
| 2011 | 6920 | 0.0 | 0.0 | 0.0 |
| 2012 | 7230 | 0.0 | 0.0 | 0.0 |
| 2013 | 8135 | 0.0 | 0.0 | 0.0 |
| 2014 | 6852 | 0.0 | 0.0 | 0.0 |
| 2015 | 1221 | 0.0 | 0.0 | 0.0 |
For data sources see[6]