X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706071406000

Well Details

Well ID: 0706071406000
Loading map...
Location: 00/06-14-070-07W6/0
Location Alias: 00/06-14-70-07 W6M
Location Alias 2: 00/06-14-070-07 W6/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 07
Section: 14
County/Municipality: Municipal District of Greenview No. 16
Well Name: PIPE HZ DISP ELM 6-14-70-7
Operator Name: Pipestone Energy Corp.
License Number: 0479478
License Date: 2016-05-18
License Status: Issued
Spud Date: 2016-06-07
Final Drill Date: 2016-06-12
Well Total Depth: 1433.00 m
Surface Hole Latitude: 55.066044
Surface Hole Longitude: -118.957984

For data sources see[1][2]

Well History

Date Event
2016-05-18 Obtained License
2016-06-08 Surface Casing Operation Performed
2016-06-09 Direction Drilling Operation Performed - Deviate
2016-06-09 Direction Drilling Operation Performed - Horizontal
2016-06-10 Intermediate Casing Operation Performed
2016-06-12 Finished Drilling
2016-06-12 Kick Occurred
2016-06-12 Liner Casing Operation Performed
2016-06-12 Well Log Performed
2016-06-12 Well Mode changed to Drilled and Cased
2016-06-13 Rig Released
2016-07-06 Well Log Performed
2016-07-11 Perforation Treatment Performed - Multi-Stage Fracture
2016-07-11 Well Log Performed
2016-07-12 Kick Occurred
2017-01-01 Well Began Injection
2017-01-01 Well Fluid changed to Water
2017-01-01 Well Type changed to Disposal

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-06-07 Precision Drilling Corporation 182 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-06-09 508.00 Deviate (5 - 79 degrees)
2016-06-09 843.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-07-11 Multi-Stage Fracture 893.80 976.00 0
2016-07-11 Multi-Stage Fracture 976.00 1072.50 0
2016-07-11 Multi-Stage Fracture 1072.50 1168.40 0
2016-07-11 Multi-Stage Fracture 1168.40 1251.10 0
2016-07-11 Multi-Stage Fracture 1251.10 1347.10 0
2016-07-11 Multi-Stage Fracture 1347.10 1433.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-07-11 2016-07-11 755 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water - KCL (3%) Not Available 100 92.4026 N/A
Water - KCL - (3%) Not Available 100 100 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-07-07 2016-07-11 Municipal Water 361

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-06-12 Kick 1430.00 1430.00
2016-07-12 Kick 1433.00 1433.00

For data sources see[10]

References