X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706072002002

Well Details

Well ID: 0706072002002
Loading map...
Location: 00/02-20-070-07W6/2
Location Alias: 00/02-20-70-07 W6M
Location Alias 2: 00/02-20-070-07 W6/02
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 07
Section: 20
County/Municipality: Municipal District of Greenview No. 16
Well Name: PIPE 102 ELM 10-8-70-7
Operator Name: Pipestone Energy Corp.
License Number: 0476845
License Date: 2015-09-04
License Status: Amended
Spud Date: 2015-09-24
Final Drill Date: 2015-10-21
Well Total Depth: 4660.00 m
Surface Hole Latitude: 55.049424
Surface Hole Longitude: -119.025289

For data sources see[1][2]

Well History

Date Event
2015-09-04 Obtained License
2015-09-25 Surface Casing Operation Performed
2015-10-03 Well Log Performed
2015-10-07 Direction Drilling Operation Performed - Horizontal
2015-10-12 Well Log Performed
2015-10-21 Finished Drilling
2015-10-21 Well Log Performed
2015-10-21 Well Mode changed to Drilled and Cased
2015-10-25 Production Casing Operation Performed
2015-10-26 Rig Released
2015-11-21 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-23 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-25 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-26 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-27 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-28 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-29 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-30 Perforation Treatment Performed - Multi-Stage Fracture
2015-12-01 Perforation Treatment Performed - Multi-Stage Fracture
2015-12-02 Perforation Treatment Performed - Multi-Stage Fracture
2015-12-03 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-01 Well Began Production
2017-01-01 Well Fluid changed to Gas
2017-01-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2015-10-07 2142.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-11-21 Multi-Stage Fracture 4607.00 4608.90 0
2015-11-23 Multi-Stage Fracture 4337.90 4339.90 0
2015-11-25 Multi-Stage Fracture 4308.00 4309.00 0
2015-11-25 Multi-Stage Fracture 4278.00 4280.00 0
2015-11-25 Multi-Stage Fracture 4248.00 4249.90 0
2015-11-25 Multi-Stage Fracture 4217.90 4219.90 0
2015-11-25 Multi-Stage Fracture 4187.90 4189.80 0
2015-11-25 Multi-Stage Fracture 4158.00 4159.90 0
2015-11-25 Multi-Stage Fracture 4127.90 4129.80 0
2015-11-26 Multi-Stage Fracture 4097.80 4099.80 0
2015-11-26 Multi-Stage Fracture 4067.80 4069.80 0
2015-11-21 Multi-Stage Fracture 4577.00 4578.90 0
2015-11-26 Multi-Stage Fracture 4037.80 4039.70 0
2015-11-26 Multi-Stage Fracture 4007.80 4009.70 0
2015-11-26 Multi-Stage Fracture 3977.70 3979.70 0
2015-11-26 Multi-Stage Fracture 3947.70 3949.60 0
2015-11-26 Multi-Stage Fracture 3917.60 3919.60 0
2015-11-26 Multi-Stage Fracture 3887.60 3889.50 0
2015-11-26 Multi-Stage Fracture 3857.60 3859.50 0
2015-11-27 Multi-Stage Fracture 3827.50 3829.40 0
2015-11-27 Multi-Stage Fracture 3797.50 3799.40 0
2015-11-27 Multi-Stage Fracture 3767.40 3769.40 0
2015-11-21 Multi-Stage Fracture 4547.00 4548.90 0
2015-11-27 Multi-Stage Fracture 3737.50 3739.40 0
2015-11-27 Multi-Stage Fracture 3707.40 3709.40 0
2015-11-27 Multi-Stage Fracture 3677.40 3679.40 0
2015-11-27 Multi-Stage Fracture 3647.30 3649.30 0
2015-11-27 Multi-Stage Fracture 3617.30 3619.20 0
2015-11-27 Multi-Stage Fracture 3587.30 3589.20 0
2015-11-28 Multi-Stage Fracture 3557.20 3559.20 0
2015-11-28 Multi-Stage Fracture 3527.20 3529.10 0
2015-11-28 Multi-Stage Fracture 3497.10 3499.00 0
2015-11-28 Multi-Stage Fracture 3467.10 3469.10 0
2015-11-21 Multi-Stage Fracture 4516.90 4518.90 0
2015-11-28 Multi-Stage Fracture 3437.00 3439.00 0
2015-11-28 Multi-Stage Fracture 3407.00 3408.00 0
2015-11-28 Multi-Stage Fracture 3377.00 3378.90 0
2015-11-28 Multi-Stage Fracture 3346.90 3348.90 0
2015-11-28 Multi-Stage Fracture 3316.90 3318.80 0
2015-11-28 Multi-Stage Fracture 3286.80 3288.70 0
2015-11-28 Multi-Stage Fracture 3256.80 3258.70 0
2015-11-29 Multi-Stage Fracture 3226.70 3228.70 0
2015-11-29 Multi-Stage Fracture 3196.90 3198.80 0
2015-11-29 Multi-Stage Fracture 3166.80 3168.80 0
2015-11-21 Multi-Stage Fracture 4488.20 4490.10 0
2015-11-29 Multi-Stage Fracture 3136.80 3138.70 0
2015-11-29 Multi-Stage Fracture 3106.80 3108.70 0
2015-11-29 Multi-Stage Fracture 3076.70 3078.60 0
2015-11-30 Multi-Stage Fracture 3046.70 3048.60 0
2015-11-30 Multi-Stage Fracture 3016.70 3018.60 0
2015-11-30 Multi-Stage Fracture 2986.60 2988.60 0
2015-11-30 Multi-Stage Fracture 2956.60 2958.50 0
2015-12-01 Multi-Stage Fracture 2926.60 2928.50 0
2015-12-01 Multi-Stage Fracture 2896.60 2898.40 0
2015-12-01 Multi-Stage Fracture 2866.50 2868.50 0
2015-11-23 Multi-Stage Fracture 4458.10 4460.00 0
2015-12-01 Multi-Stage Fracture 2836.50 2838.40 0
2015-12-01 Multi-Stage Fracture 2806.60 2808.50 0
2015-12-02 Multi-Stage Fracture 2776.60 2778.50 0
2015-12-02 Multi-Stage Fracture 2746.50 2748.50 0
2015-12-02 Multi-Stage Fracture 2716.60 2718.50 0
2015-12-02 Multi-Stage Fracture 2686.60 2688.50 0
2015-12-02 Multi-Stage Fracture 2669.20 2671.10 0
2015-12-02 Multi-Stage Fracture 2651.70 2653.70 0
2015-12-03 Multi-Stage Fracture 2634.30 2636.20 0
2015-12-03 Multi-Stage Fracture 2616.90 2618.80 0
2015-11-23 Multi-Stage Fracture 4428.10 4430.00 0
2015-12-03 Multi-Stage Fracture 2599.50 2601.40 0
2015-11-23 Multi-Stage Fracture 4398.00 4400.00 0
2015-11-23 Multi-Stage Fracture 4368.00 4369.90 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-11-21 2015-12-03 2,456 0 N/A
2 2015-11-29 2015-11-30 2,456 0 N/A
3 2015-11-23 2015-11-23 2,456 0 N/A
4 2015-11-21 2015-11-30 2,456 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water - KCL ( 2%) Not Available 100 32.808 N/A
Sand (30/50) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 9.5302 N/A
Crystalline silica. quartz 14808-60-7 100 9.5302 N/A
Iron Oxide 1309-37-1 100 9.5302 N/A
Titanium Oxide 13463-67-7 100 9.5302 N/A
Sand (50/140) Canyon Technical Services Aluminum Oxide 1344-28-1 100 0.4196 N/A
Crystalline silica. quartz 14808-60-7 100 0.4196 N/A
Iron Oxide 1309-37-1 100 0.4196 N/A
Titanium Oxide 13463-67-7 100 0.4196 N/A
Super LC (30/50) Canyon Technical Services Crystalline silica. quartz 14808-60-7 100 1.8847 N/A
Hexamethylenetetramine 100-97-0 100 1.8847 N/A
Phenol formaldehyde resin 9003-35-4 100 1.8847 N/A
HCL 15% Canyon Technical Services Acid Hydrogen Chloride 7647-01-0 100 0.3703 N/A
Water 7732-18-5 100 0.3703 N/A
Tolcide PS75LT Canyon Technical Services Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0056 N/A
Water 7732-18-5 100 0.0056 N/A
CAN-2330 Breaker Canyon Technical Services Breaker Magnesium Oxide 1309-48-4 100 0.0527 N/A
Petroleum Distillates 64741-44-2 100 0.0527 N/A
CAN-1636 pH Buffer (LpH) Canyon Technical Services Buffer Acetic Acid 64-19-7 100 0.0655 N/A
Water 7732-18-5 100 0.0655 N/A
CAN-1004 Corrosion Inhibitor Canyon Technical Services Corrosion Inhibitor Alcohols. C12-15. ethoxylated 68131-39-5 100 0.0019 N/A
Alcohols. C14-15. ethoxylated 68951-67-7 100 0.0018 N/A
Formic Acid 64-18-6 100 0.0018 N/A
Isopropanol 67-63-0 100 0.0018 N/A
Methanol 67-56-1 100 0.0018 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0018 N/A
CAN-1203 Anti-Sludge Agent / Non-Emulsifier Canyon Technical Services Demulsifier Refer to MSDS 8253 100 0.0005 N/A
CO2 - Liquid Canyon Technical Services Energizing Fluid Carbon Dioxide 124-38-9 100 54.5061 N/A
CAN-2062 Viscosifier Canyon Technical Services Gelling Agent Isopropanol 67-63-0 100 0.5662 N/A
Refer to MSDS 8826 100 0.5662 N/A
CAN-1101 Iron Control Reduction Canyon Technical Services Iron Control 2-Mercaptoethanol 60-24-2 100 0.0044 N/A
Cupric Chloride 7447-39-4 100 0.0044 N/A
Monoethanolamine 141-43-5 100 0.0044 N/A
CAN-1202 Acid Wetting Agent Canyon Technical Services Surfactant 1-Methoxy-2-Propanol 107-98-2 100 0.0008 N/A
Water 7732-18-5 100 0.0008 N/A
CAN-2403 nanoFLO Canyon Technical Services Surfactant Ethanol 64-17-5 100 0.0313 N/A
Methanol 67-56-1 100 0.0313 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.0313 N/A
Water 7732-18-5 100 0.0313 N/A
2 Prime Plus (30/50) Canyon Technical Services No specific ingredients Not Available 100 2.0017 N/A
3 Super LC (20/40) Canyon Technical Services Crystalline silica. quartz 14808-60-7 100 1.4029 N/A
Hexamethylenetetramine 100-97-0 100 1.403 N/A
Phenol formaldehyde resin 9003-35-4 100 1.4029 N/A
4 CAN-2057 Friction Reducer Canyon Technical Services Gelling Agent No hazardous ingredients Not Available 100 0.004 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-11-07 2015-12-03 Municipal Water 10778

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 3952 0.0 0.0 0.0
2018 749 0.0 0.0 0.0
2019 1712 0.0 0.0 0.0
2020 996 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-10-28 No Incident Encountered 0.00 0.00
2017-08-28 No Incident Encountered 0.00 0.00
2017-09-14 No Incident Encountered 0.00 0.00
2016-01-23 No Incident Encountered 0.00 0.00

For data sources see[9]

References