If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0706072115000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.064708,"lon":-118.98105,"icon":""}]} |
Location: 00/15-21-070-07W6/0 | |
Location Alias: 00/15-21-70-07 W6M | |
Location Alias 2: 00/15-21-070-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 070 | |
Meridian: 6 | |
Range: 07 | |
Section: 21 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: PIPE HZ ELM 15-21-70-7 | |
Operator Name: Pipestone Energy Corp. | |
License Number: 0479340 | |
License Date: 2016-04-19 | |
License Status: Amended | |
Spud Date: 2016-11-24 | |
Final Drill Date: 2016-12-14 | |
Well Total Depth: 4120.00 m | |
Surface Hole Latitude: 55.064708 | |
Surface Hole Longitude: -118.981050 |
Date | Event |
---|---|
2016-04-19 | Obtained License |
2016-11-26 | Surface Casing Operation Performed |
2016-12-03 | Direction Drilling Operation Performed - Deviate |
2016-12-03 | Direction Drilling Operation Performed - Horizontal |
2016-12-05 | Well Log Performed |
2016-12-08 | Well Log Performed |
2016-12-14 | Finished Drilling |
2016-12-14 | Well Mode changed to Drilled and Cased |
2016-12-15 | Well Log Performed |
2016-12-19 | Production Casing Operation Performed |
2016-12-19 | Rig Released |
2017-01-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-01-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-01-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-01-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-09-01 | Well Began Production |
2017-09-01 | Well Fluid changed to Gas |
2017-09-01 | Well Mode changed to Flowing |
2017-09-23 | Perforation Treatment Performed - Fractured |
2017-09-23 | Perforation Treatment Performed - Jet Perforation |
2017-09-24 | Perforation Treatment Performed - Fractured |
2017-09-24 | Perforation Treatment Performed - Jet Perforation |
2017-09-25 | Perforation Treatment Performed - Fractured |
2017-09-25 | Perforation Treatment Performed - Jet Perforation |
2017-09-26 | Perforation Treatment Performed - Fractured |
2017-09-26 | Perforation Treatment Performed - Jet Perforation |
2017-09-27 | Perforation Treatment Performed - Fractured |
2017-09-27 | Perforation Treatment Performed - Jet Perforation |
2017-09-28 | Perforation Treatment Performed - Fractured |
2017-09-28 | Perforation Treatment Performed - Jet Perforation |
2017-09-29 | Perforation Treatment Performed - Fractured |
2017-09-29 | Perforation Treatment Performed - Jet Perforation |
2017-09-30 | Perforation Treatment Performed - Fractured |
2017-09-30 | Perforation Treatment Performed - Jet Perforation |
2017-10-01 | Perforation Treatment Performed - Fractured |
2017-10-01 | Perforation Treatment Performed - Jet Perforation |
2017-10-02 | Perforation Treatment Performed - Fractured |
2017-10-02 | Perforation Treatment Performed - Jet Perforation |
2017-10-03 | Perforation Treatment Performed - Fractured |
2017-10-03 | Perforation Treatment Performed - Jet Perforation |
2017-10-04 | Perforation Treatment Performed - Fractured |
2017-10-04 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2016-12-03 | 662.60 | Deviate (5 - 79 degrees) |
2016-12-03 | 2220.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-01-13 | Multi-Stage Fracture | 4074.90 | 4075.00 | 0 |
2017-01-14 | Multi-Stage Fracture | 3799.40 | 3799.50 | 0 |
2017-10-03 | Perforation | 2640.00 | 2680.00 | 4 |
2017-10-03 | Fracture | 2640.00 | 2680.00 | 0 |
2017-10-04 | Perforation | 2580.00 | 2620.00 | 4 |
2017-10-04 | Fracture | 2580.00 | 2620.00 | 0 |
2017-01-14 | Multi-Stage Fracture | 3773.00 | 3773.10 | 0 |
2017-01-14 | Multi-Stage Fracture | 3746.60 | 3746.70 | 0 |
2017-01-14 | Multi-Stage Fracture | 3720.10 | 3720.20 | 0 |
2017-01-14 | Multi-Stage Fracture | 3693.70 | 3693.80 | 0 |
2017-01-14 | Multi-Stage Fracture | 3667.60 | 3667.70 | 0 |
2017-01-14 | Multi-Stage Fracture | 3641.20 | 3641.30 | 0 |
2017-01-14 | Multi-Stage Fracture | 3614.80 | 3614.90 | 0 |
2017-01-14 | Multi-Stage Fracture | 3588.40 | 3588.50 | 0 |
2017-01-14 | Multi-Stage Fracture | 3561.90 | 3562.00 | 0 |
2017-01-13 | Multi-Stage Fracture | 4048.50 | 4048.60 | 0 |
2017-01-14 | Multi-Stage Fracture | 3535.50 | 3535.60 | 0 |
2017-01-14 | Multi-Stage Fracture | 3509.10 | 3509.20 | 0 |
2017-01-14 | Multi-Stage Fracture | 3482.70 | 3482.80 | 0 |
2017-01-14 | Multi-Stage Fracture | 3456.20 | 3456.30 | 0 |
2017-01-14 | Multi-Stage Fracture | 3417.20 | 3417.30 | 0 |
2017-01-14 | Multi-Stage Fracture | 3391.10 | 3391.20 | 0 |
2017-01-14 | Multi-Stage Fracture | 3364.70 | 3364.80 | 0 |
2017-01-14 | Multi-Stage Fracture | 3338.30 | 3338.40 | 0 |
2017-01-15 | Multi-Stage Fracture | 3311.80 | 3311.90 | 0 |
2017-01-15 | Multi-Stage Fracture | 3285.40 | 3285.50 | 0 |
2017-01-13 | Multi-Stage Fracture | 4022.10 | 4022.20 | 0 |
2017-01-15 | Multi-Stage Fracture | 3258.90 | 3259.00 | 0 |
2017-01-15 | Multi-Stage Fracture | 3232.50 | 3232.60 | 0 |
2017-01-15 | Multi-Stage Fracture | 3206.90 | 3207.00 | 0 |
2017-01-15 | Multi-Stage Fracture | 3180.50 | 3180.60 | 0 |
2017-01-15 | Multi-Stage Fracture | 3154.10 | 3154.20 | 0 |
2017-01-15 | Multi-Stage Fracture | 3127.60 | 3127.70 | 0 |
2017-01-15 | Multi-Stage Fracture | 3101.20 | 3101.30 | 0 |
2017-01-15 | Multi-Stage Fracture | 3074.80 | 3074.90 | 0 |
2017-01-15 | Multi-Stage Fracture | 3048.30 | 3048.40 | 0 |
2017-01-15 | Multi-Stage Fracture | 3021.90 | 3022.00 | 0 |
2017-01-13 | Multi-Stage Fracture | 3995.60 | 3995.70 | 0 |
2017-01-15 | Multi-Stage Fracture | 2995.60 | 2995.70 | 0 |
2017-01-15 | Multi-Stage Fracture | 2969.20 | 2969.30 | 0 |
2017-01-15 | Multi-Stage Fracture | 2942.80 | 2942.90 | 0 |
2017-01-15 | Multi-Stage Fracture | 2916.30 | 2916.40 | 0 |
2017-01-15 | Multi-Stage Fracture | 2889.90 | 2890.00 | 0 |
2017-01-15 | Multi-Stage Fracture | 2863.50 | 2863.60 | 0 |
2017-01-15 | Multi-Stage Fracture | 2837.10 | 2837.20 | 0 |
2017-01-15 | Multi-Stage Fracture | 2810.60 | 2810.70 | 0 |
2017-01-15 | Multi-Stage Fracture | 2784.20 | 2784.30 | 0 |
2017-01-15 | Multi-Stage Fracture | 2757.80 | 2757.90 | 0 |
2017-01-13 | Multi-Stage Fracture | 3969.20 | 3969.30 | 0 |
2017-01-16 | Multi-Stage Fracture | 2731.50 | 2731.60 | 0 |
2017-01-16 | Multi-Stage Fracture | 2705.10 | 2705.20 | 0 |
2017-01-16 | Multi-Stage Fracture | 2678.60 | 2678.70 | 0 |
2017-01-16 | Multi-Stage Fracture | 2652.30 | 2652.40 | 0 |
2017-01-16 | Multi-Stage Fracture | 2625.90 | 2626.00 | 0 |
2017-01-16 | Multi-Stage Fracture | 2599.50 | 2599.60 | 0 |
2017-09-23 | Perforation | 3850.00 | 3880.00 | 4 |
2017-09-23 | Fracture | 3850.00 | 3880.00 | 0 |
2017-09-24 | Perforation | 3800.00 | 3830.00 | 4 |
2017-09-24 | Fracture | 3800.00 | 3830.00 | 0 |
2017-01-13 | Multi-Stage Fracture | 3942.80 | 3942.90 | 0 |
2017-09-24 | Perforation | 3750.00 | 3780.00 | 4 |
2017-09-24 | Fracture | 3750.00 | 3780.00 | 0 |
2017-09-25 | Perforation | 3700.00 | 3730.00 | 4 |
2017-09-25 | Fracture | 3700.00 | 3730.00 | 0 |
2017-09-25 | Perforation | 3650.00 | 3680.00 | 4 |
2017-09-25 | Fracture | 3650.00 | 3680.00 | 0 |
2017-09-26 | Perforation | 3600.00 | 3630.00 | 4 |
2017-09-26 | Fracture | 3600.00 | 3630.00 | 0 |
2017-09-27 | Perforation | 3550.00 | 3580.00 | 4 |
2017-09-27 | Fracture | 3550.00 | 3580.00 | 0 |
2017-01-13 | Multi-Stage Fracture | 3916.40 | 3916.50 | 0 |
2017-09-27 | Perforation | 3500.00 | 3530.00 | 4 |
2017-09-27 | Fracture | 3500.00 | 3530.00 | 0 |
2017-09-28 | Perforation | 3450.00 | 3480.00 | 4 |
2017-09-28 | Fracture | 3450.00 | 3480.00 | 0 |
2017-09-28 | Perforation | 3400.00 | 3430.00 | 4 |
2017-09-28 | Fracture | 3400.00 | 3430.00 | 0 |
2017-09-28 | Perforation | 3350.00 | 3380.00 | 4 |
2017-09-28 | Fracture | 3350.00 | 3380.00 | 0 |
2017-09-29 | Perforation | 3300.00 | 3330.00 | 4 |
2017-09-29 | Fracture | 3300.00 | 3330.00 | 0 |
2017-01-13 | Multi-Stage Fracture | 3878.30 | 3878.40 | 0 |
2017-09-29 | Perforation | 3240.00 | 3280.00 | 4 |
2017-09-29 | Fracture | 3240.00 | 3280.00 | 0 |
2017-09-30 | Perforation | 3180.00 | 3220.00 | 4 |
2017-09-30 | Fracture | 3180.00 | 3220.00 | 0 |
2017-09-30 | Perforation | 3120.00 | 3160.00 | 4 |
2017-09-30 | Fracture | 3120.00 | 3160.00 | 0 |
2017-09-30 | Perforation | 3060.00 | 3100.00 | 4 |
2017-09-30 | Fracture | 3060.00 | 3100.00 | 0 |
2017-10-01 | Perforation | 3000.00 | 3040.00 | 4 |
2017-10-01 | Fracture | 3000.00 | 3040.00 | 0 |
2017-01-14 | Multi-Stage Fracture | 3825.60 | 3825.70 | 0 |
2017-10-01 | Perforation | 2940.00 | 2980.00 | 4 |
2017-10-01 | Fracture | 2940.00 | 2980.00 | 0 |
2017-10-02 | Perforation | 2880.00 | 2920.00 | 4 |
2017-10-02 | Fracture | 2880.00 | 2920.00 | 0 |
2017-10-02 | Perforation | 2820.00 | 2860.00 | 4 |
2017-10-02 | Fracture | 2820.00 | 2860.00 | 0 |
2017-10-03 | Perforation | 2760.00 | 2800.00 | 4 |
2017-10-03 | Fracture | 2760.00 | 2800.00 | 0 |
2017-10-03 | Perforation | 2700.00 | 2740.00 | 4 |
2017-10-03 | Fracture | 2700.00 | 2740.00 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-09-23 | 2017-10-04 | 2,358 | 18,827 | N/A |
2 | 2017-01-13 | 2017-01-16 | 2,358 | 20,635 | N/A |
3 | 2017-01-13 | 2017-10-04 | 2,358 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 85.1939 | N/A | |||
15% HCL Acid | Step Energy Services | Acid | Hydrochloric Acid | 7647-01-0 | 100 | 0.2495 | N/A | |
Water | 7732-18-5 | 100 | 0.2495 | N/A | ||||
SCS-8 (Clay Control) | Step Energy Services | Clay Control | Inorganic Salt | Not Available | 100 | 0.0846 | N/A | |
SCI-4 (Corrosion Inhibitor) | Step Energy Services | Corrosion Inhibitor | Methanol | 67-56-1 | 100 | 0.0004 | N/A | |
Modified Thiourea Polymer | 68527-49-1 | 100 | 0.0004 | N/A | ||||
Olefin | 64743-02-8 | 100 | 0.0004 | N/A | ||||
Polyoxyalkylenes | 68951-67-7 | 100 | 0.0004 | N/A | ||||
Propargyl Alcohol | 107-19-7 | 100 | 0.0004 | N/A | ||||
SFR-102s (Friction Reducer) | STEP Energy Services | Friction Reducer | Distillates. Petroleum. Hydrotreated Light | 64742-47-8 | 100 | 0.0436 | N/A | |
Proprietary | Trade Secret | 100 | 0.0436 | N/A | ||||
SIC-3 (Iron Chelator) | Step Energy Services | Iron Control | Citric Acid | 77-92-9 | 100 | 0.0011 | N/A | |
2 | Water | Not Available | 100 | 87.5054 | N/A | |||
15% HCL Acid Blend | Step Energy Services | Acid | Hydrochloric Acid | 7647-01-0 | 100 | 0.3632 | N/A | |
Water | 7732-18-5 | 100 | 0.3632 | N/A | ||||
SCS-1 (Clay Control) | Step Energy Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.087 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.087 | N/A | ||||
SFR-106 (Friction Reducer) | Step Energy Services | Friction Reducer | Ethoxylated Alcohol | 78330-21-9 | 100 | 0.0415 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0415 | N/A | ||||
Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.0415 | N/A | ||||
3 | 30/50 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 3.9336 | N/A | |
40/70 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 8.9368 | N/A | ||
Econocide B1008 (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0084 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0084 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0084 | N/A | ||||
SBO-1 (Breaker) | Step Energy Services | Breaker | Disodium peroxydisulfate | 7775-27-1 | 100 | 0.0082 | N/A | |
SNE-2 (Non-Emulsifier) | Step Energy Services | Surfactant | 2-Ethylhexanol distillation residue | 68609-68-7 | 100 | 0.0554 | N/A | |
Dodecylbenzene Sulfonic Acid | 27176-87-0 | 100 | 0.0554 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0554 | N/A | ||||
Monoethanolamine | 141-43-5 | 100 | 0.0554 | N/A | ||||
Oxirane. methyl-. polymer | 11/6/9003 | 100 | 0.0554 | N/A | ||||
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- | 9043-30-5 | 100 | 0.0554 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0554 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-09-24 | 2017-10-02 | Surface Water - River | 17950 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 1290 | 0.0 | 0.0 | 0.0 |
2018 | 5557 | 0.0 | 0.0 | 0.0 |
2019 | 4443 | 0.0 | 0.0 | 0.0 |
2020 | 1975 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-12-18 | No Incident Encountered | 0.00 | 0.00 |
2017-01-16 | No Incident Encountered | 0.00 | 0.00 |
2017-10-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]