If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0706072606020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.066043,"lon":-118.958951,"icon":""}]} |
| Location: 02/06-26-070-07W6/0 | |
| Location Alias: 02/06-26-70-07 W6M | |
| Location Alias 2: 02/06-26-070-07 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 070 | |
| Meridian: 6 | |
| Range: 07 | |
| Section: 26 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: PIPE 102 HZ ELM 6-26-70-7 | |
| Operator Name: Pipestone Energy Corp. | |
| License Number: 0483776 | |
| License Date: 2017-05-31 | |
| License Status: Issued | |
| Spud Date: 2017-06-10 | |
| Final Drill Date: 2017-07-01 | |
| Well Total Depth: 4808.00 m | |
| Surface Hole Latitude: 55.066043 | |
| Surface Hole Longitude: -118.958951 |
| Date | Event |
|---|---|
| 2017-05-31 | Obtained License |
| 2017-06-12 | Surface Casing Operation Performed |
| 2017-06-16 | Direction Drilling Operation Performed - Deviate |
| 2017-06-18 | Direction Drilling Operation Performed - Horizontal |
| 2017-07-01 | Finished Drilling |
| 2017-07-01 | Well Log Performed |
| 2017-07-01 | Well Mode changed to Drilled and Cased |
| 2017-07-05 | Production Casing Operation Performed |
| 2017-07-08 | Rig Released |
| 2017-08-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-08-22 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-08-23 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-08-24 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-08-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-08-26 | Perforation Treatment Performed - Jet Perforation |
| 2017-08-26 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-08-27 | Perforation Treatment Performed - Jet Perforation |
| 2017-08-27 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-08-28 | Perforation Treatment Performed - Jet Perforation |
| 2017-08-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-08-29 | Perforation Treatment Performed - Jet Perforation |
| 2017-08-29 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-08-30 | Perforation Treatment Performed - Jet Perforation |
| 2017-08-30 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-08-31 | Perforation Treatment Performed - Jet Perforation |
| 2017-08-31 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-09-10 | Well Began Production |
| 2017-09-10 | Well Fluid changed to Gas |
| 2017-09-10 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2017-06-10 | Ensign Drilling Inc. | 66 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-06-16 | 684.00 | Deviate (5 - 79 degrees) |
| 2017-06-18 | 2454.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-08-21 | Multi-Stage Fracture | 4699.60 | 4699.70 | 0 |
| 2017-08-23 | Multi-Stage Fracture | 4347.40 | 4347.50 | 0 |
| 2017-08-30 | Multi-Stage Fracture | 2920.00 | 2940.00 | 0 |
| 2017-08-30 | Perforation | 2900.00 | 2900.20 | 4 |
| 2017-08-30 | Perforation | 2890.00 | 2890.20 | 4 |
| 2017-08-30 | Perforation | 2880.00 | 2880.20 | 4 |
| 2017-08-30 | Multi-Stage Fracture | 2880.00 | 2900.00 | 0 |
| 2017-08-30 | Perforation | 2860.00 | 2860.20 | 4 |
| 2017-08-30 | Perforation | 2850.00 | 2850.20 | 4 |
| 2017-08-30 | Perforation | 2840.00 | 2840.20 | 4 |
| 2017-08-30 | Multi-Stage Fracture | 2840.00 | 2860.00 | 0 |
| 2017-08-31 | Perforation | 2820.00 | 2820.20 | 4 |
| 2017-08-23 | Multi-Stage Fracture | 4309.10 | 4309.20 | 0 |
| 2017-08-31 | Perforation | 2810.00 | 2810.20 | 4 |
| 2017-08-31 | Perforation | 2800.00 | 2800.20 | 4 |
| 2017-08-31 | Multi-Stage Fracture | 2800.00 | 2820.00 | 0 |
| 2017-08-31 | Multi-Stage Fracture | 2760.00 | 2780.00 | 0 |
| 2017-08-31 | Perforation | 2744.00 | 2744.20 | 4 |
| 2017-08-31 | Perforation | 2735.00 | 2735.20 | 4 |
| 2017-08-31 | Perforation | 2725.00 | 2725.20 | 4 |
| 2017-08-31 | Multi-Stage Fracture | 2725.00 | 2744.00 | 0 |
| 2017-08-23 | Multi-Stage Fracture | 4270.00 | 4270.10 | 0 |
| 2017-08-23 | Multi-Stage Fracture | 4230.90 | 4231.00 | 0 |
| 2017-08-23 | Multi-Stage Fracture | 4192.20 | 4192.30 | 0 |
| 2017-08-24 | Multi-Stage Fracture | 4153.10 | 4153.20 | 0 |
| 2017-08-24 | Multi-Stage Fracture | 4114.20 | 4114.30 | 0 |
| 2017-08-24 | Multi-Stage Fracture | 4075.30 | 4075.40 | 0 |
| 2017-08-24 | Multi-Stage Fracture | 4036.20 | 4036.30 | 0 |
| 2017-08-24 | Multi-Stage Fracture | 3997.10 | 3997.20 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 4659.80 | 4659.90 | 0 |
| 2017-08-24 | Multi-Stage Fracture | 3958.00 | 3958.10 | 0 |
| 2017-08-25 | Multi-Stage Fracture | 3919.00 | 3919.10 | 0 |
| 2017-08-26 | Perforation | 3900.00 | 3900.20 | 4 |
| 2017-08-26 | Perforation | 3890.00 | 3890.20 | 4 |
| 2017-08-26 | Perforation | 3880.00 | 3880.20 | 4 |
| 2017-08-26 | Multi-Stage Fracture | 3880.00 | 3900.00 | 0 |
| 2017-08-26 | Perforation | 3860.00 | 3860.20 | 4 |
| 2017-08-26 | Perforation | 3850.00 | 3850.20 | 4 |
| 2017-08-26 | Perforation | 3840.00 | 3840.20 | 4 |
| 2017-08-26 | Multi-Stage Fracture | 3840.00 | 3860.00 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 4620.70 | 4620.80 | 0 |
| 2017-08-26 | Perforation | 3820.00 | 3820.20 | 4 |
| 2017-08-26 | Perforation | 3810.00 | 3810.20 | 4 |
| 2017-08-26 | Multi-Stage Fracture | 3800.00 | 3820.00 | 0 |
| 2017-08-26 | Perforation | 3780.00 | 3780.20 | 4 |
| 2017-08-26 | Perforation | 3770.00 | 3770.20 | 4 |
| 2017-08-26 | Multi-Stage Fracture | 3760.00 | 3780.00 | 0 |
| 2017-08-26 | Perforation | 3760.00 | 3760.20 | 4 |
| 2017-08-26 | Perforation | 3740.00 | 3740.30 | 4 |
| 2017-08-26 | Perforation | 3730.00 | 3730.30 | 4 |
| 2017-08-26 | Multi-Stage Fracture | 3720.00 | 3740.00 | 0 |
| 2017-08-22 | Multi-Stage Fracture | 4581.60 | 4581.70 | 0 |
| 2017-08-26 | Perforation | 3720.00 | 3720.30 | 4 |
| 2017-08-27 | Perforation | 3700.00 | 3700.20 | 4 |
| 2017-08-27 | Perforation | 3690.00 | 3690.20 | 4 |
| 2017-08-27 | Perforation | 3680.00 | 3680.20 | 4 |
| 2017-08-27 | Multi-Stage Fracture | 3680.00 | 3700.00 | 0 |
| 2017-08-27 | Perforation | 3660.00 | 3660.20 | 4 |
| 2017-08-27 | Perforation | 3650.00 | 3650.20 | 4 |
| 2017-08-27 | Perforation | 3640.00 | 3640.20 | 4 |
| 2017-08-27 | Multi-Stage Fracture | 3640.00 | 3660.00 | 0 |
| 2017-08-27 | Perforation | 3620.00 | 3620.20 | 4 |
| 2017-08-22 | Multi-Stage Fracture | 4542.50 | 4542.60 | 0 |
| 2017-08-27 | Perforation | 3610.00 | 3610.20 | 4 |
| 2017-08-27 | Perforation | 3600.00 | 3600.20 | 4 |
| 2017-08-27 | Multi-Stage Fracture | 3600.00 | 3620.00 | 0 |
| 2017-08-27 | Perforation | 3580.00 | 3580.20 | 4 |
| 2017-08-27 | Perforation | 3570.00 | 3570.20 | 4 |
| 2017-08-27 | Perforation | 3560.00 | 3560.20 | 4 |
| 2017-08-27 | Multi-Stage Fracture | 3560.00 | 3580.00 | 0 |
| 2017-08-27 | Perforation | 3540.00 | 3540.20 | 4 |
| 2017-08-27 | Perforation | 3530.00 | 3530.20 | 4 |
| 2017-08-27 | Perforation | 3520.00 | 3520.20 | 4 |
| 2017-08-22 | Multi-Stage Fracture | 4503.50 | 4503.60 | 0 |
| 2017-08-27 | Multi-Stage Fracture | 3520.00 | 3540.00 | 0 |
| 2017-08-28 | Perforation | 3500.00 | 3500.20 | 4 |
| 2017-08-28 | Perforation | 3490.00 | 3490.20 | 4 |
| 2017-08-28 | Perforation | 3480.00 | 3480.20 | 4 |
| 2017-08-28 | Multi-Stage Fracture | 3480.00 | 3500.00 | 0 |
| 2017-08-28 | Perforation | 3460.00 | 3460.20 | 4 |
| 2017-08-28 | Perforation | 3450.00 | 3450.20 | 4 |
| 2017-08-28 | Perforation | 3440.00 | 3440.20 | 4 |
| 2017-08-28 | Multi-Stage Fracture | 3440.00 | 3460.00 | 0 |
| 2017-08-28 | Perforation | 3420.00 | 3420.20 | 4 |
| 2017-08-22 | Multi-Stage Fracture | 4464.40 | 4464.50 | 0 |
| 2017-08-28 | Perforation | 3410.00 | 3410.20 | 4 |
| 2017-08-28 | Perforation | 3400.00 | 3400.20 | 4 |
| 2017-08-28 | Multi-Stage Fracture | 3400.00 | 3420.00 | 0 |
| 2017-08-28 | Perforation | 3380.00 | 3380.20 | 4 |
| 2017-08-28 | Perforation | 3370.00 | 3370.20 | 4 |
| 2017-08-28 | Perforation | 3360.00 | 3360.20 | 4 |
| 2017-08-28 | Multi-Stage Fracture | 3360.00 | 3380.00 | 0 |
| 2017-08-29 | Perforation | 3140.00 | 3140.20 | 4 |
| 2017-08-29 | Perforation | 3130.00 | 3130.20 | 4 |
| 2017-08-29 | Perforation | 3120.00 | 3120.20 | 4 |
| 2017-08-22 | Multi-Stage Fracture | 4425.30 | 4425.40 | 0 |
| 2017-08-29 | Multi-Stage Fracture | 3120.00 | 3140.00 | 0 |
| 2017-08-29 | Perforation | 3100.00 | 3100.20 | 4 |
| 2017-08-29 | Perforation | 3090.00 | 3090.20 | 4 |
| 2017-08-29 | Perforation | 3080.00 | 3080.20 | 4 |
| 2017-08-30 | Multi-Stage Fracture | 3080.00 | 3100.00 | 0 |
| 2017-08-30 | Perforation | 3060.00 | 3060.20 | 4 |
| 2017-08-30 | Perforation | 3050.00 | 3050.20 | 4 |
| 2017-08-30 | Perforation | 3040.00 | 3040.20 | 4 |
| 2017-08-30 | Multi-Stage Fracture | 3040.00 | 3060.00 | 0 |
| 2017-08-30 | Perforation | 3020.00 | 3020.20 | 4 |
| 2017-08-22 | Multi-Stage Fracture | 4386.20 | 4386.30 | 0 |
| 2017-08-30 | Perforation | 3010.00 | 3010.20 | 4 |
| 2017-08-30 | Multi-Stage Fracture | 3000.00 | 3020.00 | 0 |
| 2017-08-30 | Perforation | 3000.00 | 3000.20 | 4 |
| 2017-08-30 | Perforation | 2980.00 | 2980.20 | 4 |
| 2017-08-30 | Perforation | 2970.00 | 2970.20 | 4 |
| 2017-08-30 | Perforation | 2960.00 | 2960.20 | 4 |
| 2017-08-30 | Multi-Stage Fracture | 2960.00 | 2980.00 | 0 |
| 2017-08-30 | Perforation | 2940.00 | 2940.20 | 4 |
| 2017-08-30 | Perforation | 2930.00 | 2930.20 | 4 |
| 2017-08-30 | Perforation | 2920.00 | 2920.20 | 4 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-08-21 | 2017-08-31 | 2,327 | 24,460 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 88.6315 | N/A | |||
| 30/50 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 3.7438 | N/A | ||
| 40/70 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 7.828 | N/A | ||
| 15% HCL Acid | Step Energy Services | Acid | Hydrochloric Acid | 7647-01-0 | 100 | 0.3076 | N/A | |
| Water | 7732-18-5 | 100 | 0.3076 | N/A | ||||
| Econocide B1008 (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0095 | N/A | |
| Methyl Alcohol | 67-56-1 | 100 | 0.0095 | N/A | ||||
| Non-Hazardous Ingredients | Not Available | 100 | 0.0095 | N/A | ||||
| SBO-1 (Breaker) | Step Energy Services | Breaker | Disodium peroxydisulfate | 7775-27-1 | 100 | 0.0086 | N/A | |
| SCS-8 (Clay Control) | Step Energy Services | Clay Control | Inorganic Salt | Not Available | 100 | 0.0867 | N/A | |
| SCI-4 (Corrosion Inhibitor) | Step Energy Services | Corrosion Inhibitor | Methanol | 67-56-1 | 100 | 0.0006 | N/A | |
| Modified Thiourea Polymer | 68527-49-1 | 100 | 0.0006 | N/A | ||||
| Olefin | 64743-02-8 | 100 | 0.0006 | N/A | ||||
| Polyoxyalkylenes | 68951-67-7 | 100 | 0.0006 | N/A | ||||
| Propargyl Alcohol | 107-19-7 | 100 | 0.0006 | N/A | ||||
| SFR-106 (Friction Reducer) | Step Energy Services | Friction Reducer | Ethoxylated Alcohol | 78330-21-9 | 100 | 0.0491 | N/A | |
| Non-Hazardous Ingredients | Not Available | 100 | 0.0491 | N/A | ||||
| Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.0491 | N/A | ||||
| SIC-3 (Iron Chelator) | Step Energy Services | Iron Control | Citric Acid | 77-92-9 | 100 | 0.0015 | N/A | |
| SNE-2 (Non-Emulsifier) | Step Energy Services | Surfactant | 2-Ethylhexanol distillation residue | 68609-68-7 | 100 | 0.0435 | N/A | |
| Dodecylbenzene Sulfonic Acid | 27176-87-0 | 100 | 0.0435 | N/A | ||||
| Methanol | 67-56-1 | 100 | 0.0435 | N/A | ||||
| Monoethanolamine | 141-43-5 | 100 | 0.0435 | N/A | ||||
| Oxirane. methyl-. polymer | 11/6/9003 | 100 | 0.0435 | N/A | ||||
| Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- | 9043-30-5 | 100 | 0.0435 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0435 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-08-20 | 2017-08-31 | Surface Water - Runoff | 26750 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 1717 | 0.0 | 0.0 | 0.0 |
| 2018 | 5008 | 0.0 | 0.0 | 0.0 |
| 2019 | 3415 | 0.0 | 0.0 | 0.0 |
| 2020 | 1748 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-07-08 | No Incident Encountered | 0.00 | 0.00 |
| 2017-09-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]