X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706081701000

Well Details

Well ID: 0706081701000
Loading map...
Location: 00/01-17-070-08W6/0
Location Alias: 00/01-17-70-08 W6M
Location Alias 2: 00/01-17-070-08 W6/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 08
Section: 17
County/Municipality: County of Grande Prairie No. 1
Well Name: NUVISTA 100 HZ D ELM 1-17-70-8
Operator Name: NuVista Energy Ltd.
License Number: 0492708
License Date: 2018-12-10
License Status: Issued
Spud Date: 2018-12-15
Final Drill Date: 2019-02-28
Well Total Depth: 4601.00 m
Surface Hole Latitude: 55.069626
Surface Hole Longitude: -119.199897

For data sources see[1][2]

Well History

Date Event
2018-12-10 Obtained License
2018-12-17 Surface Casing Operation Performed
2019-02-19 Direction Drilling Operation Performed - Deviate
2019-02-21 Direction Drilling Operation Performed - Horizontal
2019-02-22 Intermediate Casing Operation Performed
2019-02-22 Well Log Performed
2019-02-28 Finished Drilling
2019-02-28 Liner Casing Operation Performed
2019-02-28 Well Log Performed
2019-02-28 Well Mode changed to Drilled and Cased
2019-03-02 Rig Released
2019-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-07-29 Perforation Treatment Performed - Fractured
2019-07-29 Perforation Treatment Performed - Jet Perforation
2019-07-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-07-30 Perforation Treatment Performed - Fractured
2019-07-30 Perforation Treatment Performed - Jet Perforation
2019-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-07-31 Perforation Treatment Performed - Fractured
2019-07-31 Perforation Treatment Performed - Jet Perforation
2019-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-01 Perforation Treatment Performed - Fractured
2019-08-01 Perforation Treatment Performed - Jet Perforation
2019-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-02 Perforation Treatment Performed - Fractured
2019-08-02 Perforation Treatment Performed - Jet Perforation
2019-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-03 Perforation Treatment Performed - Fractured
2019-08-03 Perforation Treatment Performed - Jet Perforation
2019-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-04 Perforation Treatment Performed - Fractured
2019-08-04 Perforation Treatment Performed - Jet Perforation
2019-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-05 Perforation Treatment Performed - Fractured
2019-08-05 Perforation Treatment Performed - Jet Perforation
2019-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-06 Perforation Treatment Performed - Fractured
2019-08-06 Perforation Treatment Performed - Jet Perforation
2019-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-07 Perforation Treatment Performed - Fractured
2019-08-07 Perforation Treatment Performed - Jet Perforation
2019-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-12 Perforation Treatment Performed - Fractured
2019-08-12 Perforation Treatment Performed - Jet Perforation
2019-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-13 Perforation Treatment Performed - Fractured
2019-08-13 Perforation Treatment Performed - Jet Perforation
2019-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-14 Perforation Treatment Performed - Fractured
2019-08-14 Perforation Treatment Performed - Jet Perforation
2019-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-16 Perforation Treatment Performed - Fractured
2019-08-16 Perforation Treatment Performed - Jet Perforation
2019-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-17 Perforation Treatment Performed - Fractured
2019-08-17 Perforation Treatment Performed - Jet Perforation
2019-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-18 Perforation Treatment Performed - Fractured
2019-08-18 Perforation Treatment Performed - Jet Perforation
2019-10-01 Well Began Production
2019-10-01 Well Fluid changed to Gas
2019-10-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-12-15 Precision Drilling Corporation 182 N/A Set Surface
2019-02-16 Nabors Drilling Canada Limited 79E N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-02-19 2241.90 Deviate (5 - 79 degrees)
2019-02-21 2579.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-07-29 Multi-Stage Fracture 4506.80 4573.60 0
2019-07-30 Perforation 4417.10 4417.40 4
2019-08-07 Perforation 3456.80 3457.10 4
2019-08-07 Perforation 3442.10 3442.40 4
2019-08-07 Perforation 3427.10 3427.40 4
2019-08-07 Perforation 3412.10 3412.40 4
2019-08-07 Perforation 3397.10 3397.40 4
2019-08-07 Acid Treatment 3397.10 3457.10 0
2019-08-07 Fracture 3397.10 3457.10 0
2019-08-12 Perforation 3381.80 3382.10 4
2019-08-12 Perforation 3367.10 3367.40 4
2019-08-12 Perforation 3352.10 3352.40 4
2019-07-30 Perforation 4402.10 4402.40 4
2019-08-12 Perforation 3337.10 3337.40 4
2019-08-12 Perforation 3322.10 3322.40 4
2019-08-12 Acid Treatment 3322.10 3382.10 0
2019-08-12 Fracture 3322.10 3382.10 0
2019-08-13 Perforation 3306.80 3307.10 4
2019-08-13 Perforation 3292.10 3292.40 4
2019-08-13 Perforation 3277.10 3277.40 4
2019-08-13 Perforation 3262.10 3262.40 4
2019-08-13 Perforation 3247.10 3247.40 4
2019-08-13 Acid Treatment 3247.10 3307.10 0
2019-07-30 Perforation 4387.10 4387.40 4
2019-08-13 Fracture 3247.10 3307.10 0
2019-08-14 Perforation 3231.80 3232.10 4
2019-08-14 Perforation 3217.10 3217.40 4
2019-08-14 Perforation 3202.10 3202.40 4
2019-08-14 Perforation 3187.10 3187.40 4
2019-08-14 Perforation 3172.10 3172.40 4
2019-08-14 Acid Treatment 3172.10 3232.10 0
2019-08-14 Fracture 3172.10 3232.10 0
2019-08-16 Perforation 3156.80 3157.10 4
2019-08-16 Perforation 3142.10 3142.40 4
2019-07-30 Perforation 4372.10 4372.40 4
2019-08-16 Perforation 3127.10 3127.40 4
2019-08-16 Perforation 3112.10 3112.40 4
2019-08-16 Perforation 3097.10 3097.40 4
2019-08-16 Acid Treatment 3097.10 3157.10 0
2019-08-16 Fracture 3097.10 3157.10 0
2019-08-17 Perforation 3081.80 3082.10 4
2019-08-17 Perforation 3067.10 3067.40 4
2019-08-17 Perforation 3052.10 3052.40 4
2019-08-17 Perforation 3037.10 3037.40 4
2019-08-17 Perforation 3022.10 3022.40 4
2019-07-30 Acid Treatment 4372.10 4432.10 0
2019-08-17 Acid Treatment 3022.10 3082.10 0
2019-08-17 Fracture 3022.10 3082.10 0
2019-08-18 Perforation 3006.80 3007.10 4
2019-08-18 Perforation 2992.10 2992.40 4
2019-08-18 Perforation 2977.10 2977.40 4
2019-08-18 Perforation 2962.10 2962.40 4
2019-08-18 Perforation 2947.10 2947.40 4
2019-08-18 Acid Treatment 2947.10 3007.10 0
2019-08-18 Fracture 2947.10 3007.10 0
2019-07-30 Fracture 4372.10 4432.10 0
2019-07-30 Perforation 4356.80 4357.10 4
2019-07-30 Perforation 4342.10 4342.40 4
2019-07-30 Perforation 4327.10 4327.40 4
2019-07-30 Perforation 4312.10 4312.40 4
2019-07-29 Perforation 4506.80 4507.10 4
2019-07-30 Perforation 4297.10 4297.40 4
2019-07-30 Acid Treatment 4297.10 4357.10 0
2019-07-30 Fracture 4297.10 4357.10 0
2019-07-31 Perforation 4281.80 4282.10 4
2019-07-31 Perforation 4267.10 4267.40 4
2019-07-31 Perforation 4252.10 4252.40 4
2019-07-31 Perforation 4237.10 4237.40 4
2019-07-31 Perforation 4222.10 4222.40 4
2019-07-31 Acid Treatment 4222.10 4282.10 0
2019-07-31 Fracture 4222.10 4282.10 0
2019-07-29 Perforation 4492.10 4492.40 4
2019-08-01 Perforation 4206.80 4207.10 4
2019-08-01 Perforation 4192.10 4192.40 4
2019-08-01 Perforation 4177.10 4177.40 4
2019-08-01 Perforation 4162.10 4162.40 4
2019-08-01 Perforation 4147.10 4147.40 4
2019-08-01 Acid Treatment 4147.10 4207.10 0
2019-08-01 Fracture 4147.10 4207.10 0
2019-08-02 Perforation 4130.80 4131.10 4
2019-08-02 Perforation 4117.10 4117.40 4
2019-08-02 Perforation 4102.10 4102.40 4
2019-07-29 Perforation 4477.10 4477.40 4
2019-08-02 Perforation 4087.10 4087.40 4
2019-08-02 Perforation 4072.10 4072.40 4
2019-08-02 Acid Treatment 4072.10 4131.10 0
2019-08-02 Fracture 4072.10 4131.10 0
2019-08-03 Perforation 4055.80 4056.10 4
2019-08-03 Perforation 4041.10 4041.40 4
2019-08-03 Perforation 4026.10 4026.40 4
2019-08-03 Perforation 4012.10 4012.40 4
2019-08-03 Perforation 3997.10 3997.40 4
2019-08-03 Acid Treatment 3997.10 4056.10 0
2019-07-29 Perforation 4462.10 4462.40 4
2019-08-03 Fracture 3997.10 4056.10 0
2019-08-03 Perforation 3981.80 3982.10 4
2019-08-03 Perforation 3967.10 3967.40 4
2019-08-03 Perforation 3952.10 3952.40 4
2019-08-03 Perforation 3937.10 3937.40 4
2019-08-03 Perforation 3922.10 3922.40 4
2019-08-03 Acid Treatment 3922.10 3982.10 0
2019-08-03 Fracture 3922.10 3982.10 0
2019-08-03 Perforation 3906.80 3907.10 4
2019-08-03 Perforation 3892.10 3892.40 4
2019-07-29 Perforation 4447.10 4447.40 4
2019-08-03 Perforation 3877.10 3877.40 4
2019-08-03 Perforation 3862.10 3862.40 4
2019-08-03 Perforation 3847.10 3847.40 4
2019-08-03 Acid Treatment 3847.10 3907.10 0
2019-08-03 Fracture 3847.10 3907.10 0
2019-08-04 Perforation 3831.80 3832.10 4
2019-08-04 Perforation 3817.10 3817.40 4
2019-08-04 Perforation 3802.10 3802.40 4
2019-08-04 Perforation 3788.10 3788.40 4
2019-08-04 Perforation 3771.10 3771.40 4
2019-07-29 Acid Treatment 4447.10 4507.10 0
2019-08-04 Acid Treatment 3771.10 3832.10 0
2019-08-04 Fracture 3771.10 3832.10 0
2019-08-05 Perforation 3756.80 3757.10 4
2019-08-05 Perforation 3742.10 3742.40 4
2019-08-05 Perforation 3727.10 3727.40 4
2019-08-05 Perforation 3712.10 3712.40 4
2019-08-05 Perforation 3697.10 3697.40 4
2019-08-05 Acid Treatment 3697.10 3757.10 0
2019-08-05 Fracture 3697.10 3757.10 0
2019-08-06 Perforation 3681.80 3682.10 4
2019-07-29 Fracture 4447.10 4507.10 0
2019-08-06 Perforation 3667.10 3667.40 4
2019-08-06 Perforation 3652.10 3652.40 4
2019-08-06 Perforation 3637.10 3637.40 4
2019-08-06 Perforation 3622.10 3622.40 4
2019-08-06 Acid Treatment 3622.10 3682.10 0
2019-08-06 Fracture 3622.10 3682.10 0
2019-08-06 Perforation 3606.80 3607.10 4
2019-08-06 Perforation 3592.10 3592.40 4
2019-08-06 Perforation 3577.10 3577.40 4
2019-08-06 Perforation 3562.10 3562.40 4
2019-07-30 Perforation 4431.80 4432.10 4
2019-08-06 Perforation 3547.10 3547.40 4
2019-08-06 Acid Treatment 3547.10 3607.10 0
2019-08-06 Fracture 3547.10 3607.10 0
2019-08-07 Perforation 3531.80 3532.10 4
2019-08-07 Perforation 3517.10 3517.40 4
2019-08-07 Perforation 3502.10 3502.40 4
2019-08-07 Perforation 3487.10 3487.40 4
2019-08-07 Perforation 3472.10 3472.40 4
2019-08-07 Acid Treatment 3472.10 3532.10 0
2019-08-07 Fracture 3472.10 3532.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-07-29 2019-08-18 2,480 15,548 N/A
2 2019-08-14 2019-08-18 2,480 0 N/A
3 2019-07-29 2019-08-13 2,480 0 N/A
4 2019-07-29 2019-08-17 2,480 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 83.0111 N/A
30/50 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 14.1943 N/A
40/70 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 2.3945 N/A
HCR-7000 (Synthetic HCL Acid) Fluid Energy Group Ltd. Acid Demulsifiers Not Available 100 0.3383 N/A
Inhibitors Not Available 100 0.3383 N/A
Non Hazardous Ingredients Not Available 100 0.3383 N/A
Water 7732-18-5 100 0.3383 N/A
SCBO-2 (Breaker) Step Energy Services Breaker Ammonium Persulfate 7727-54-0 100 0.0006 N/A
Cured Acrylic Resin Not Available 100 0.0006 N/A
Non-Hazardous Ingredients Not Available 100 0.0006 N/A
2 SFR-110 (Friction Reducer) Step Energy Services Friction Reducer Anionic Acrylamide 5/8/9003 100 0.138 N/A
Mineral Oil 8012-95-1 100 0.138 N/A
Primary Alcohol Ethoxylatehigh 68131-39-5 100 0.138 N/A
Sodium 2-Acryloylamino-2-methyl-1-propanesulfonic 15214-89-8 100 0.138 N/A
Sodium Acrylate 7446-81-3 100 0.138 N/A
Water 7732-18-5 100 0.138 N/A
3 SFR-302 (Friction Reducer) Step Energy Services Friction Reducer Proprietary Trade Secret 100 0.0337 N/A
Sodium Chloride 7647-14-5 100 0.0337 N/A
4 SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.0085 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0085 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-08-03 2019-08-16 Surface Water - River 15548

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1872 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-02 No Incident Encountered 0.00 0.00
2019-08-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References