X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0714101305000

Well Details

Well ID: 0714101305000
Loading map...
Location: 00/05-13-071-10W4/0
Location Alias: 00/05-13-71-10 W4M
Location Alias 2: 00/05-13-071-10 W4/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 4
Range: 10
Section: 13
County/Municipality: Lac La Biche County
Well Name: BVI ET AL PHILOMENA 5-13-71-10
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0087083
License Date: 1980-11-17
License Status: RecCertified
Spud Date: 1981-01-10
Final Drill Date: 1981-01-13
Well Total Depth: 535.00 m
Surface Hole Latitude: 55.145064
Surface Hole Longitude: -111.410933

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-11-17 Obtained License
1981-01-12 Drill Stem Test Performed
1981-01-13 Finished Drilling
1981-01-13 Well Log Performed
1981-01-13 Well Mode changed to Drilled and Cased
1981-01-14 Drill Stem Test Performed
1981-01-14 Production Casing Operation Performed
1981-01-23 Perforation Treatment Performed - Jet Perforation
1981-02-01 Well Began Production
1981-02-01 Well Fluid changed to Gas
1981-02-01 Well Mode changed to Flowing
1984-05-22 Well Fluid changed to Gas
1984-05-22 Well Mode changed to Suspended
1987-01-24 Well Fluid changed to Gas
1987-01-24 Well Mode changed to Flowing
1987-02-28 Well Fluid changed to Gas
1987-02-28 Well Mode changed to Suspended
1989-04-01 Well Fluid changed to Gas
1989-04-01 Well Mode changed to Flowing
1989-05-31 Well Fluid changed to Gas
1989-05-31 Well Mode changed to Suspended
1995-03-03 Perforation Treatment Performed - Cement Squeeze
1995-03-03 Plug Back Performed
1995-03-03 Well Fluid changed to Gas
1995-03-03 Well Mode changed to Abandoned
1995-03-05 Perforation Treatment Performed - Jet Perforation
1995-03-05 Well Log Performed
1995-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-03-07 Plug Back Performed
1995-03-07 Well Log Performed
1995-03-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-01-23 Perforation 345.90 346.90 13
1995-03-03 Cement Squeeze 345.90 346.90 0
1995-03-05 Perforation 515.50 516.50 13
1995-03-07 Packing Device Capped w/Cement 431.00 511.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 1372 0.0 0.0 0.0
1987 621 0.0 0.0 0.0
1989 700 0.0 0.0 0.0

For data sources see[5]

References