If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0714250909003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.136451,"lon":-113.781994,"icon":""}]} |
Location: 00/09-09-071-25W4/3 | |
Location Alias: 00/09-09-71-25 W4M | |
Location Alias 2: 00/09-09-071-25 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 071 | |
Meridian: 4 | |
Range: 25 | |
Section: 09 | |
County/Municipality: Municipal District of Lesser Slave River No. 124 | |
Well Name: RIFE SMITH 9-9-71-25 | |
Operator Name: Rife Resources Ltd. | |
License Number: 0143703 | |
License Date: 1990-03-13 | |
License Status: Abandoned | |
Spud Date: 1990-03-15 | |
Final Drill Date: 1990-03-17 | |
Well Total Depth: 658.00 m | |
Surface Hole Latitude: 55.136451 | |
Surface Hole Longitude: -113.781994 |
Date | Event |
---|---|
1990-03-13 | Obtained License |
1990-03-15 | Lost Circulation Occurred |
1990-03-15 | Surface Casing Operation Performed |
1990-03-17 | Finished Drilling |
1990-03-17 | Kick Occurred |
1990-03-17 | Well Log Performed |
1990-03-17 | Well Mode changed to Drilled and Cased |
1990-03-18 | Production Casing Operation Performed |
1990-03-18 | Well Log Performed |
1990-03-19 | Rig Released |
1990-06-25 | Well Log Performed |
1990-06-28 | Perforation Treatment Performed - Jet Perforation |
1990-06-28 | Well Log Performed |
1990-06-29 | Perforation Treatment Performed - Fractured |
1990-06-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-01-10 | Perforation Treatment Performed - Jet Perforation |
1995-01-10 | Well Log Performed |
1995-01-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-01-11 | Plug Back Performed |
1995-01-11 | Well Log Performed |
1995-01-12 | Perforation Treatment Performed - Jet Perforation |
1995-01-12 | Well Log Performed |
1995-01-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-01-08 | Well Log Performed |
1997-01-10 | Perforation Treatment Performed - Jet Perforation |
1997-01-22 | Well Began Production |
1997-01-22 | Well Fluid changed to Gas |
1997-01-22 | Well Mode changed to Flowing |
1998-02-27 | Well Log Performed |
1998-02-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-02-28 | Perforation Treatment Performed - Jet Perforation |
1998-02-28 | Plug Back Performed |
1998-03-12 | Well Fluid changed to Gas |
1998-03-12 | Well Mode changed to Suspended |
1998-03-13 | Well Fluid changed to Gas |
1998-03-13 | Well Mode changed to Suspended |
2007-01-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-01-27 | Plug Back Performed |
2007-01-27 | Well Fluid changed to Gas |
2007-01-27 | Well Log Performed |
2007-01-27 | Well Mode changed to Abandoned Zone |
2007-02-01 | Well Log Performed |
2007-02-05 | Well Log Performed |
2007-02-15 | Perforation Treatment Performed - Jet Perforation |
2007-02-15 | Perforation Treatment Performed - Remedial Casing |
2007-02-15 | Well Log Performed |
2007-02-28 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-06-28 | Perforation | 640.50 | 641.00 | 14 |
1997-01-10 | Perforation | 479.00 | 480.00 | 20 |
1998-02-28 | Packing Device Capped w/Cement | 492.00 | 500.00 | 0 |
1998-02-28 | Perforation | 465.00 | 466.00 | 20 |
2007-01-27 | Packing Device Capped w/Cement | 469.00 | 477.00 | 0 |
2007-01-27 | Packing Device Capped w/Cement | 452.00 | 460.00 | 0 |
2007-02-15 | Perforation | 219.00 | 220.00 | 17 |
2007-02-15 | Perforation | 150.00 | 151.00 | 17 |
2007-02-15 | Remedial Casing Cementing | 219.00 | 220.00 | 0 |
2007-02-15 | Remedial Casing Cementing | 150.00 | 151.00 | 0 |
1990-06-28 | Perforation | 642.50 | 646.00 | 14 |
1990-06-29 | Fracture | 642.50 | 646.00 | 0 |
1990-06-30 | Acid Treatment | 640.50 | 646.00 | 0 |
1995-01-10 | Perforation | 652.00 | 653.00 | 14 |
1995-01-11 | Packing Device Capped w/Cement | 622.00 | 630.00 | 0 |
1995-01-12 | Perforation | 502.00 | 503.00 | 13 |
1995-01-13 | Acid Treatment | 502.00 | 503.00 | 0 |
1997-01-10 | Perforation | 485.50 | 486.50 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 7134 | 0.0 | 0.0 | 0.0 |
1998 | 1321 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1990-03-15 | Lost Circulation | 31.00 | 31.00 |
1990-03-17 | Kick | 658.00 | 658.00 |
For data sources see[6]