X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0714251109002

Well Details

Well ID: 0714251109002
Loading map...
Location: 00/09-11-071-25W4/2
Location Alias: 00/09-11-71-25 W4M
Location Alias 2: 00/09-11-071-25 W4/02
Country: Canada
Province: Alberta
Township: 071
Meridian: 4
Range: 25
Section: 11
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: RIFE SMITH 9-11-71-25
Operator Name: Rife Resources Ltd.
License Number: 0147945
License Date: 1991-02-13
License Status: RecCertified
Spud Date: 1991-02-19
Final Drill Date: 1991-02-22
Well Total Depth: 662.00 m
Surface Hole Latitude: 55.135813
Surface Hole Longitude: -113.729492

For data sources see[1][2]

Well History

Date Event
1991-02-13 Obtained License
1991-02-20 Surface Casing Operation Performed
1991-02-22 Finished Drilling
1991-02-22 Kick Occurred
1991-02-22 Lost Circulation Occurred
1991-02-22 Well Mode changed to Drilled and Cased
1991-02-23 Well Log Performed
1991-02-24 Kick Occurred
1991-02-25 Production Casing Operation Performed
1991-02-25 Rig Released
1991-03-06 Well Log Performed
1991-03-07 Perforation Treatment Performed - Jet Perforation
1991-03-07 Well Log Performed
1991-03-08 Perforation Treatment Performed - Jet Perforation
1991-03-08 Well Log Performed
1991-03-09 Perforation Treatment Performed - Cement Squeeze
1991-03-12 Perforation Treatment Performed - Jet Perforation
1991-03-12 Well Log Performed
1995-01-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-01-05 Plug Back Performed
1995-01-05 Well Log Performed
1995-01-06 Perforation Treatment Performed - Jet Perforation
1995-01-06 Well Log Performed
1995-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-09 Well Began Production
1995-01-09 Well Fluid changed to Gas
1995-01-09 Well Mode changed to Flowing
1995-01-22 Well Log Performed
1995-02-23 Perforation Treatment Performed - Jet Perforation
1995-02-23 Well Log Performed
1995-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-02-25 Well Log Performed
1995-02-26 Perforation Treatment Performed - Jet Perforation
1995-02-26 Well Log Performed
1995-02-27 Well Log Performed
1995-02-28 Perforation Treatment Performed - Jet Perforation
1995-03-01 Perforation Treatment Performed - Jet Perforation
1995-03-01 Well Log Performed
1995-03-06 Well Log Performed
1995-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-03-07 Plug Back Performed
1995-03-07 Well Fluid changed to Gas
1995-03-07 Well Mode changed to Abandoned Zone
1998-07-02 Well Abandoned
1998-07-02 Well Fluid changed to Gas
1998-07-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-03-07 Perforation 536.00 537.00 13
1995-02-26 Perforation 466.00 467.00 13
1995-02-28 Perforation 457.00 458.00 13
1995-03-01 Perforation 414.50 415.50 13
1995-03-07 Packing Device Capped w/Cement 397.20 405.20 0
1991-03-08 Perforation 540.50 541.50 13
1991-03-09 Cement Squeeze 536.00 541.50 0
1991-03-12 Perforation 536.00 537.00 13
1995-01-05 Packing Device Capped w/Cement 525.90 534.00 0
1995-01-06 Perforation 502.10 503.10 13
1995-01-08 Acid Treatment 502.10 503.10 0
1995-02-23 Perforation 487.00 488.00 13
1995-02-25 Packing Device Capped w/Cement 476.00 484.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 932 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1991-02-22 Lost Circulation 662.00 662.00
1991-02-22 Kick 662.00 662.00
1991-02-24 Kick 662.00 662.00

For data sources see[6]

References