X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0714251915002

Well Details

Well ID: 0714251915002
Loading map...
Location: 00/15-19-071-25W4/2
Location Alias: 00/15-19-71-25 W4M
Location Alias 2: 00/15-19-071-25 W4/02
Country: Canada
Province: Alberta
Township: 071
Meridian: 4
Range: 25
Section: 19
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: RIFE ULSTER SMITH 15-19-71-25
Operator Name: Rife Resources Ltd.
License Number: 0175867
License Date: 1995-02-07
License Status: RecCertified
Spud Date: 1995-02-22
Final Drill Date: 1995-02-24
Well Total Depth: 618.00 m
Surface Hole Latitude: 55.169175
Surface Hole Longitude: -113.833539

For data sources see[1][2]

Well History

Date Event
1995-02-07 Obtained License
1995-02-23 Surface Casing Operation Performed
1995-02-24 Finished Drilling
1995-02-24 Well Log Performed
1995-02-24 Well Mode changed to Drilled and Cased
1995-02-25 Production Casing Operation Performed
1995-02-25 Rig Released
1995-03-08 Well Log Performed
1995-03-10 Perforation Treatment Performed - Jet Perforation
1997-01-11 Well Log Performed
1997-01-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-01-12 Perforation Treatment Performed - Jet Perforation
1997-01-12 Plug Back Performed
1997-01-23 Well Began Production
1997-01-23 Well Fluid changed to Gas
1997-01-23 Well Mode changed to Flowing
2001-04-30 Well Fluid changed to Gas
2001-04-30 Well Mode changed to Suspended
2007-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-11 Plug Back Performed
2007-02-11 Well Fluid changed to Gas
2007-02-11 Well Log Performed
2007-02-11 Well Mode changed to Abandoned Zone
2007-02-15 Well Abandoned
2007-02-15 Well Fluid changed to Gas
2007-02-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-03-10 Perforation 565.50 566.50 13
1997-01-12 Packing Device Capped w/Cement 555.00 563.00 0
1997-01-12 Perforation 402.50 403.50 20
2007-02-11 Packing Device Capped w/Cement 387.00 395.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 8091 0.0 0.0 0.0
1998 8122 0.0 0.0 0.0
1999 3437 0.0 0.0 0.0

For data sources see[5]

References