X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0714253415003

Well Details

Well ID: 0714253415003
Loading map...
Location: 00/15-34-071-25W4/3
Location Alias: 00/15-34-71-25 W4M
Location Alias 2: 00/15-34-071-25 W4/03
Country: Canada
Province: Alberta
Township: 071
Meridian: 4
Range: 25
Section: 34
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: RIFE SMITH 15-34-71-25
Operator Name: Rife Resources Ltd.
License Number: 0142009
License Date: 1989-12-05
License Status: Abandoned
Spud Date: 1989-12-11
Final Drill Date: 1989-12-14
Well Total Depth: 582.00 m
Surface Hole Latitude: 55.195983
Surface Hole Longitude: -113.760989

For data sources see[1][2]

Well History

Date Event
1989-12-05 Obtained License
1989-12-12 Surface Casing Operation Performed
1989-12-14 Finished Drilling
1989-12-14 Lost Circulation Occurred
1989-12-14 Well Log Performed
1989-12-14 Well Mode changed to Drilled and Cased
1989-12-15 Production Casing Operation Performed
1989-12-15 Rig Released
1990-03-09 Perforation Treatment Performed - Jet Perforation
1990-03-10 Well Log Performed
2001-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-28 Perforation Treatment Performed - Jet Perforation
2001-01-28 Plug Back Performed
2001-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-29 Perforation Treatment Performed - Jet Perforation
2001-01-29 Plug Back Performed
2001-02-15 Well Began Production
2001-02-15 Well Fluid changed to Gas
2001-02-15 Well Mode changed to Flowing
2003-10-14 Well Fluid changed to Gas
2003-10-14 Well Mode changed to Suspended
2007-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-08 Plug Back Performed
2007-02-08 Well Fluid changed to Gas
2007-02-08 Well Log Performed
2007-02-08 Well Mode changed to Abandoned Zone
2007-02-09 Perforation Treatment Performed - Jet Perforation
2007-02-09 Well Log Performed
2007-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-23 Plug Back Performed
2007-02-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-03-09 Perforation 544.30 546.30 13
2001-01-28 Packing Device Capped w/Cement 528.00 536.00 0
2001-01-28 Perforation 519.00 522.00 17
2001-01-29 Packing Device Capped w/Cement 505.00 513.00 0
2001-01-29 Perforation 459.50 460.50 17
2007-02-08 Packing Device Capped w/Cement 447.00 455.00 0
2007-02-09 Perforation 374.00 375.00 17
2007-02-23 Packing Device Capped w/Cement 348.50 365.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 2930 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-12-14 Lost Circulation 582.00 582.00

For data sources see[6]

References