X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0715031902033

Well Details

Well ID: 0715031902033
Loading map...
Location: 03/02-19-071-03W5/3
Location Alias: 03/02-19-71-03 W5M
Location Alias 2: 03/02-19-071-03 W5/03
Country: Canada
Province: Alberta
Township: 071
Meridian: 5
Range: 03
Section: 19
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: KXL 103 MITSUE 2-19-71-3
Operator Name: Kaiser Exploration Ltd.
License Number: 0368354
License Date: 2006-12-12
License Status: RecExempt
Spud Date: 2007-02-04
Final Drill Date: 2007-02-06
Well Total Depth: 730.00 m
Surface Hole Latitude: 55.157909
Surface Hole Longitude: -114.446824

For data sources see[1][2]

Well History

Date Event
2006-12-12 Obtained License
2007-02-04 Surface Casing Operation Performed
2007-02-05 Well Log Performed
2007-02-06 Finished Drilling
2007-02-06 Well Mode changed to Drilled and Cased
2007-02-07 Production Casing Operation Performed
2007-02-08 Rig Released
2007-02-13 Well Log Performed
2007-02-14 Perforation Treatment Performed - Jet Perforation
2007-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-15 Perforation Treatment Performed - Jet Perforation
2007-02-15 Plug Back Performed
2007-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-16 Plug Back Performed
2007-02-17 Perforation Treatment Performed - Jet Perforation
2007-02-18 Perforation Treatment Performed - Jet Perforation
2007-04-04 Well Began Production
2007-04-04 Well Fluid changed to Gas
2007-04-04 Well Mode changed to Flowing
2008-03-01 Well Fluid changed to Gas
2008-03-01 Well Mode changed to Suspended
2017-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-02 Plug Back Performed
2017-03-02 Well Fluid changed to Gas
2017-03-02 Well Mode changed to Abandoned Zone
2017-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-03 Plug Back Performed
2017-03-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-02-14 Perforation 691.00 691.50 17
2017-03-03 Packing Device Capped w/Cement 473.50 481.50 0
2007-02-15 Packing Device Capped w/Cement 691.00 691.50 0
2007-02-15 Perforation 638.00 638.30 17
2007-02-16 Packing Device Capped w/Cement 638.00 638.30 0
2007-02-17 Perforation 585.00 585.50 17
2007-02-18 Perforation 502.80 503.50 17
2007-02-18 Perforation 498.80 499.20 17
2007-02-18 Perforation 492.30 493.30 17
2017-03-02 Packing Device Capped w/Cement 570.00 578.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 3832 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-01 No Incident Encountered 0.00 0.00

For data sources see[6]

References