X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0715041804000

Well Details

Well ID: 0715041804000
Loading map...
Location: 00/04-18-071-04W5/0
Location Alias: 00/04-18-71-04 W5M
Location Alias 2: 00/04-18-071-04 W5/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 5
Range: 04
Section: 18
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CARDINAL MITSUE 4-18-71-4
Operator Name: Cardinal Energy Ltd.
License Number: 0028488
License Date: 1965-06-29
License Status: Issued
Spud Date: 1965-07-01
Final Drill Date: 1965-07-17
Well Total Depth: 1842.50 m
Surface Hole Latitude: 55.143743
Surface Hole Longitude: -114.613219

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-06-29 Obtained License
1965-07-17 Finished Drilling
1965-07-17 Well Mode changed to Drilled and Cased
1965-07-18 Drill Stem Test Performed
1965-07-20 Production Casing Operation Performed
1965-07-24 Perforation Treatment Performed - Jet Perforation
1965-08-10 Perforation Treatment Performed - Jet Perforation
1965-08-12 Well Began Production
1965-08-12 Well Fluid changed to Crude Oil
1965-08-12 Well Mode changed to Flowing
1971-09-11 Well Fluid changed to Crude Oil
1971-09-11 Well Mode changed to Pumping
1980-12-07 Well Fluid changed to Crude Oil
1980-12-07 Well Mode changed to Suspended
1992-09-14 Perforation Treatment Performed - Jet Perforation
1992-09-14 Well Log Performed
1992-10-15 Well Fluid changed to Crude Oil
1992-10-15 Well Mode changed to Pumping
2002-05-22 Well Log Performed
2012-12-05 Perforation Treatment Performed - Chemical Squeeze
2012-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-07-24 Perforation 1820.30 1821.20 13
1965-08-10 Perforation 1821.50 1822.40 13
1992-09-14 Perforation 1820.00 1822.50 13
1992-09-14 Perforation 1826.50 1829.50 13
2012-12-05 Chemical Squeeze 1820.00 1829.50 0
2012-12-06 Acid Treatment 1820.00 1829.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1971 2752 0.0 0.0 0.0
1972 7806 0.0 0.0 0.0
1973 5892 0.0 0.0 0.0
1974 4871 0.0 0.0 0.0
1975 7511 0.0 0.0 0.0
1976 6512 0.0 0.0 0.0
1977 6972 0.0 0.0 0.0
1978 7532 0.0 0.0 0.0
1979 6522 0.0 0.0 0.0
1980 3108 0.0 0.0 0.0
1992 409 0.0 0.0 0.0
1993 4467 0.0 0.0 0.0
1994 2929 0.0 0.0 0.0
1995 7492 0.0 0.0 0.0
1996 7811 0.0 0.0 0.0
1997 8075 0.0 0.0 0.0
1998 7367 0.0 0.0 0.0
1999 8595 0.0 0.0 0.0
2000 8744 0.0 0.0 0.0
2001 7830 0.0 0.0 0.0
2002 4685 0.0 0.0 0.0
2003 5300 0.0 0.0 0.0
2004 8276 0.0 0.0 0.0
2005 8265 0.0 0.0 0.0
2006 8210 0.0 0.0 0.0
2007 8639 0.0 0.0 0.0
2008 8469 0.0 0.0 0.0
2009 8593 0.0 0.0 0.0
2010 8590 0.0 0.0 0.0
2011 7934 0.0 0.0 0.0
2012 8612 0.0 0.0 0.0
2013 8019 0.0 0.0 0.0
2014 8733 0.0 0.0 0.0
2015 7758 0.0 0.0 0.0
2016 8547 0.0 0.0 0.0
2017 8247 0.0 0.0 0.0
2018 8574 0.0 0.0 0.0
2019 8235 0.0 0.0 0.0
2020 2112 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-12-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References