Well Details

Well ID: 0715042309000
Loading map...
Location: 00/09-23-071-04W5/0
Location Alias: 00/09-23-71-04 W5M
Location Alias 2: 00/09-23-071-04 W5/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 5
Range: 04
Section: 23
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CARDINAL MITSUE 9-23-71-4
Operator Name: Cardinal Energy Ltd.
License Number: 0075345
License Date: 1979-04-24
License Status: Suspension
Spud Date: 1979-05-04
Final Drill Date: 1979-07-09
Well Total Depth: 1748.00 m
Surface Hole Latitude: 55.166608
Surface Hole Longitude: -114.493397

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-04-24 Obtained License
1979-05-04 Direction Drilling Operation Performed - 98
1979-05-11 Lost Circulation Occurred
1979-05-18 Kick Occurred
1979-05-29 Kick Occurred
1979-06-28 Lost Circulation Occurred
1979-07-09 Finished Drilling
1979-07-11 Production Casing Operation Performed
1979-07-30 Perforation Treatment Performed - Jet Perforation
1979-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-25 Perforation Treatment Performed - Cement Squeeze
1979-08-27 Perforation Treatment Performed - Jet Perforation
1979-10-01 Perforation Treatment Performed - Jet Perforation
1980-02-07 Well Mode changed to Drilled and Cased
1986-07-03 Well Began Production
1986-07-03 Well Fluid changed to Crude Oil
1986-07-03 Well Mode changed to Pumping
1991-02-09 Perforation Treatment Performed - Chemical Squeeze
1998-11-04 Perforation Treatment Performed - Cement Plug
1998-11-04 Plug Back Performed
1998-11-05 Well Fluid changed to Crude Oil
1998-11-05 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1979-05-04 1381.50 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-07-30 Perforation 1726.00 1727.50 7
1979-07-30 Perforation 1720.50 1725.00 7
1979-08-25 Acid Treatment 1720.50 1727.50 0
1979-08-25 Cement Squeeze 1720.50 1727.50 0
1979-08-27 Perforation 1720.50 1725.00 7
1979-10-01 Perforation 1720.50 1725.00 7
1991-02-09 Chemical Squeeze 1720.50 1725.00 0
1998-11-04 Cement Plug 1682.50 1734.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 4340 0.0 0.0 0.0
1987 7224 0.0 0.0 0.0
1988 7864 0.0 0.0 0.0
1989 8370 0.0 0.0 0.0
1990 7963 0.0 0.0 0.0
1991 7781 0.0 0.0 0.0
1992 8275 0.0 0.0 0.0
1993 5358 0.0 0.0 0.0
1994 6416 0.0 0.0 0.0
1995 8748 0.0 0.0 0.0
1996 8637 0.0 0.0 0.0
1997 5409 0.0 0.0 0.0
1998 3294 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-05-11 Lost Circulation 870.00 940.00
1979-05-18 Kick 1681.00 1681.00
1979-05-29 Kick 1681.00 1681.00
1979-06-28 Lost Circulation 1404.00 1404.00

For data sources see[7]