X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0716071603002

Well Details

Well ID: 0716071603002
Loading map...
Location: 00/03-16-071-07W6/2
Location Alias: 00/03-16-71-07 W6M
Location Alias 2: 00/03-16-071-07 W6/02
Country: Canada
Province: Alberta
Township: 071
Meridian: 6
Range: 07
Section: 16
County/Municipality: County of Grande Prairie No. 1
Well Name: PIPESTONE DIMSD 3-16-71-7
Operator Name: Pipestone Energy Corp.
License Number: 0483941
License Date: 2017-06-09
License Status: Amended
Spud Date: 2017-07-05
Final Drill Date: 2017-07-28
Well Total Depth: 4220.00 m
Surface Hole Latitude: 55.124897
Surface Hole Longitude: -119.014963

For data sources see[1][2]

Well History

Date Event
2017-06-09 Obtained License
2017-07-07 Surface Casing Operation Performed
2017-07-09 Direction Drilling Operation Performed - Deviate
2017-07-16 Direction Drilling Operation Performed - Horizontal
2017-07-28 Finished Drilling
2017-07-28 Well Mode changed to Drilled and Cased
2017-07-30 Well Log Performed
2017-07-31 Production Casing Operation Performed
2017-07-31 Rig Released
2017-08-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-27 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-29 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-30 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-01 Well Fluid changed to Gas
2017-09-01 Well Mode changed to Testing
2017-09-17 Well Log Performed
2018-03-31 Well Fluid changed to Gas
2018-03-31 Well Mode changed to Test Completed
2018-04-10 Well Fluid changed to Gas
2018-04-10 Well Mode changed to Testing
2018-05-31 Well Fluid changed to Gas
2018-05-31 Well Mode changed to Test Completed
2018-06-01 Well Fluid changed to Gas
2018-06-01 Well Mode changed to Testing
2018-06-30 Well Fluid changed to Gas
2018-06-30 Well Mode changed to Test Completed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-07-09 1700.10 Deviate (5 - 79 degrees)
2017-07-16 2223.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-08-26 Multi-Stage Fracture 4190.70 4191.50 0
2017-08-26 Multi-Stage Fracture 3920.80 3922.80 0
2017-08-26 Multi-Stage Fracture 3890.90 3982.80 0
2017-08-27 Multi-Stage Fracture 3860.90 3862.90 0
2017-08-27 Multi-Stage Fracture 3831.00 3833.00 0
2017-08-27 Multi-Stage Fracture 3801.10 3803.00 0
2017-08-28 Multi-Stage Fracture 3771.10 3773.10 0
2017-08-28 Multi-Stage Fracture 3741.20 3743.10 0
2017-08-28 Multi-Stage Fracture 3711.70 3713.60 0
2017-08-28 Multi-Stage Fracture 3682.60 3684.50 0
2017-08-28 Multi-Stage Fracture 3652.80 3654.80 0
2017-08-26 Multi-Stage Fracture 4160.30 4162.20 0
2017-08-28 Multi-Stage Fracture 3623.30 3625.30 0
2017-08-28 Multi-Stage Fracture 3593.40 3595.40 0
2017-08-28 Multi-Stage Fracture 3562.50 3565.40 0
2017-08-28 Multi-Stage Fracture 3533.60 3535.60 0
2017-08-28 Multi-Stage Fracture 3503.70 3505.60 0
2017-08-29 Multi-Stage Fracture 3473.80 3475.80 0
2017-08-29 Multi-Stage Fracture 3444.10 3446.10 0
2017-08-29 Multi-Stage Fracture 3414.50 3416.40 0
2017-08-29 Multi-Stage Fracture 3384.80 3386.70 0
2017-08-29 Multi-Stage Fracture 3354.80 3356.70 0
2017-08-26 Multi-Stage Fracture 4130.30 4132.30 0
2017-08-29 Multi-Stage Fracture 3324.90 3326.80 0
2017-08-29 Multi-Stage Fracture 3295.10 3296.60 0
2017-08-29 Multi-Stage Fracture 3265.00 3266.90 0
2017-08-29 Multi-Stage Fracture 3235.00 3237.00 0
2017-08-29 Multi-Stage Fracture 3205.00 3207.00 0
2017-08-29 Multi-Stage Fracture 3175.10 3177.00 0
2017-08-29 Multi-Stage Fracture 3145.10 3147.00 0
2017-08-29 Multi-Stage Fracture 3115.10 3117.10 0
2017-08-29 Multi-Stage Fracture 3085.30 3087.20 0
2017-08-29 Multi-Stage Fracture 3055.40 3057.30 0
2017-08-26 Multi-Stage Fracture 4100.40 4102.30 0
2017-08-29 Multi-Stage Fracture 3025.50 3027.40 0
2017-08-29 Multi-Stage Fracture 2995.50 2997.40 0
2017-08-30 Multi-Stage Fracture 2965.70 2967.60 0
2017-08-30 Multi-Stage Fracture 2935.70 2937.60 0
2017-08-30 Multi-Stage Fracture 2905.70 2907.70 0
2017-08-30 Multi-Stage Fracture 2875.80 2877.70 0
2017-08-30 Multi-Stage Fracture 2846.00 2847.80 0
2017-08-30 Multi-Stage Fracture 2816.00 2817.90 0
2017-08-30 Multi-Stage Fracture 2786.00 2788.00 0
2017-08-30 Multi-Stage Fracture 2756.00 2758.00 0
2017-08-26 Multi-Stage Fracture 4070.40 4072.30 0
2017-08-30 Multi-Stage Fracture 2726.10 2728.10 0
2017-08-30 Multi-Stage Fracture 2696.20 2698.10 0
2017-08-30 Multi-Stage Fracture 2666.20 2668.20 0
2017-08-30 Multi-Stage Fracture 2636.40 2638.30 0
2017-08-30 Multi-Stage Fracture 2607.00 2609.00 0
2017-08-30 Multi-Stage Fracture 2577.00 2579.00 0
2017-08-30 Multi-Stage Fracture 2547.70 2549.60 0
2017-08-30 Multi-Stage Fracture 2517.70 2519.60 0
2017-08-30 Multi-Stage Fracture 2488.00 2490.00 0
2017-08-30 Multi-Stage Fracture 2471.00 2472.90 0
2017-08-26 Multi-Stage Fracture 4040.40 4042.40 0
2017-08-26 Multi-Stage Fracture 4010.60 4012.50 0
2017-08-26 Multi-Stage Fracture 3980.60 3982.50 0
2017-08-26 Multi-Stage Fracture 3950.60 3952.60 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-08-26 2017-08-30 2,304 20,222 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 84.7163 N/A
30/50 Prime Plus Calfrac Quartz 14808-60-7 100 2.421 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 9.7374 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 2.3977 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 1.2191 N/A
Water 7732-18-5 100 1.2191 N/A
Activator W Calfrac Activator Alcohols. C12-14-Secondary. Ethoxylated 84133-50-6 100 0.0714 N/A
Methanol 67-56-1 100 0.0714 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0714 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.011 N/A
Non-Hazardous Ingredients Trade Secret 100 0.011 N/A
CI-9100G Calfrac Corrosion Inhibitor Alcohols. C12-15. ethoxylated 68131-39-5 100 0.0038 N/A
Cinnamaldehyde 104-55-2 100 0.0038 N/A
Dipropylene glycol monomethyl ether 34590-94-8 100 0.0038 N/A
Ethylene Glycol 107-21-1 100 0.0038 N/A
Formic acid 64-18-6 100 0.0038 N/A
Isopropyl alcohol 67-63-0 100 0.0038 N/A
Tar bases. quinoline derivs. 68513-87-1 100 0.0038 N/A
Tar bases. quinolone derivs.. benzyl chloride-quarternized 72480-70-7 100 0.0038 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.0731 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0731 N/A
DWP-641 Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.0805 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0805 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0805 N/A
DAP-902 Calfrac Scale Inhibitor Non-Hazardous Ingredients Trade Secret 100 0.0153 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-08-17 2017-10-18 Surface Water - Runoff 4863
2017-08-21 2017-08-30 Surface Water - Runoff 15051

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 267 0.0 0.0 0.0
2018 64 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-07-31 No Incident Encountered 0.00 0.00
2017-09-20 No Incident Encountered 0.00 0.00

For data sources see[9]

References