If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0716072808000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.177486,"lon":-119.005849,"icon":""}]} |
Location: 00/08-28-071-07W6/0 | |
Location Alias: 00/08-28-71-07 W6M | |
Location Alias 2: 00/08-28-071-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 071 | |
Meridian: 6 | |
Range: 07 | |
Section: 28 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: TIDEWATER DIMSD 8-28-71-7 | |
Operator Name: Tidewater Midstream and Infrastructure Ltd. | |
License Number: 0086874 | |
License Date: 1980-11-07 | |
License Status: RecCertified | |
Spud Date: 1980-11-27 | |
Final Drill Date: 1980-12-25 | |
Well Total Depth: 2274.00 m | |
Surface Hole Latitude: 55.177486 | |
Surface Hole Longitude: -119.005849 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-11-07 | Obtained License |
1980-11-29 | Lost Circulation Occurred |
1980-12-25 | Finished Drilling |
1980-12-30 | Drill Stem Test Performed |
1980-12-31 | Drill Stem Test Performed |
1981-01-01 | Drill Stem Test Performed |
1981-01-03 | Production Casing Operation Performed |
1981-06-17 | Perforation Treatment Performed - Jet Perforation |
1981-06-19 | Perforation Treatment Performed - Fractured |
1981-06-20 | Well Mode changed to Drilled and Cased |
1981-06-23 | Well Began Production |
1981-06-23 | Well Fluid changed to Crude Oil |
1981-06-23 | Well Mode changed to Flowing |
2000-11-07 | Well Log Performed |
2000-11-08 | Perforation Treatment Performed - Jet Perforation |
2000-11-08 | Well Log Performed |
2000-11-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-11-20 | Perforation Treatment Performed - Cement Squeeze |
2000-11-20 | Plug Back Performed |
2005-10-31 | Well Fluid changed to Crude Oil |
2005-10-31 | Well Mode changed to Suspended |
2008-02-01 | Well Fluid changed to Crude Oil |
2008-02-01 | Well Mode changed to Flowing |
2011-01-31 | Well Fluid changed to Crude Oil |
2011-01-31 | Well Mode changed to Suspended |
2012-01-27 | Well Log Performed |
2012-01-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-01-29 | Perforation Treatment Performed - Jet Perforation |
2012-01-29 | Plug Back Performed |
2012-01-29 | Well Fluid changed to Crude Oil |
2012-01-29 | Well Log Performed |
2012-01-29 | Well Mode changed to Abandoned Zone |
2012-01-30 | Perforation Treatment Performed - Cement Plug |
2012-01-30 | Perforation Treatment Performed - Remedial Casing |
2012-02-01 | Perforation Treatment Performed - Jet Perforation |
2012-02-01 | Well Log Performed |
2012-02-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-02-02 | Perforation Treatment Performed - Remedial Casing |
2012-02-04 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-06-17 | Perforation | 2177.00 | 2182.50 | 7 |
2012-01-29 | Perforation | 1539.00 | 1540.00 | 13 |
2012-01-29 | Perforation | 1491.00 | 1492.00 | 13 |
2012-01-29 | Perforation | 1444.00 | 1445.00 | 13 |
2012-01-30 | Remedial Casing Cementing | 1444.00 | 1621.00 | 0 |
2012-01-30 | Cement Plug | 1250.00 | 1636.00 | 0 |
2012-02-01 | Perforation | 504.00 | 506.00 | 13 |
2012-02-02 | Remedial Casing Cementing | 504.00 | 506.00 | 0 |
2012-02-02 | Packing Device Capped w/Cement | 446.50 | 498.00 | 0 |
1981-06-19 | Fracture | 2177.00 | 2182.50 | 0 |
2000-11-08 | Perforation | 1418.50 | 1421.50 | 13 |
2000-11-20 | Acid Treatment | 1418.50 | 1421.50 | 0 |
2000-11-20 | Cement Squeeze | 1418.50 | 1421.50 | 0 |
2012-01-29 | Packing Device Capped w/Cement | 2161.20 | 2170.00 | 0 |
2012-01-29 | Perforation | 1620.00 | 1621.00 | 13 |
2012-01-29 | Perforation | 1597.00 | 1598.00 | 13 |
2012-01-29 | Perforation | 1560.00 | 1561.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1981 | 52 | 0.0 | 0.0 | 0.0 |
1982 | 1366 | 0.0 | 0.0 | 0.0 |
1983 | 1133 | 0.0 | 0.0 | 0.0 |
1984 | 1940 | 0.0 | 0.0 | 0.0 |
1985 | 3671 | 0.0 | 0.0 | 0.0 |
1986 | 3402 | 0.0 | 0.0 | 0.0 |
1987 | 2680 | 0.0 | 0.0 | 0.0 |
1988 | 2749 | 0.0 | 0.0 | 0.0 |
1989 | 2657 | 0.0 | 0.0 | 0.0 |
1990 | 2481 | 0.0 | 0.0 | 0.0 |
1991 | 951 | 0.0 | 0.0 | 0.0 |
1992 | 2375 | 0.0 | 0.0 | 0.0 |
1993 | 2450 | 0.0 | 0.0 | 0.0 |
1994 | 2286 | 0.0 | 0.0 | 0.0 |
1995 | 2246 | 0.0 | 0.0 | 0.0 |
1996 | 1520 | 0.0 | 0.0 | 0.0 |
1997 | 6191 | 0.0 | 0.0 | 0.0 |
1998 | 8675 | 0.0 | 0.0 | 0.0 |
1999 | 8538 | 0.0 | 0.0 | 0.0 |
2000 | 7521 | 0.0 | 0.0 | 0.0 |
2001 | 8314 | 0.0 | 0.0 | 0.0 |
2002 | 1821 | 0.0 | 0.0 | 0.0 |
2003 | 839 | 0.0 | 0.0 | 0.0 |
2004 | 7355 | 0.0 | 0.0 | 0.0 |
2005 | 5910 | 0.0 | 0.0 | 0.0 |
2008 | 6757 | 0.0 | 0.0 | 0.0 |
2009 | 7939 | 0.0 | 0.0 | 0.0 |
2010 | 6059 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1980-11-29 | Lost Circulation | 220.00 | 254.00 |
For data sources see[6]