If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0716080213020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.115427,"lon":-119.09159,"icon":""}]} |
| Location: 02/13-02-071-08W6/0 | |
| Location Alias: 02/13-02-71-08 W6M | |
| Location Alias 2: 02/13-02-071-08 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 071 | |
| Meridian: 6 | |
| Range: 08 | |
| Section: 02 | |
| County/Municipality: County of Grande Prairie No. 1 | |
| Well Name: PIPESTONE 102 HZ ELM 13-2-71-8 | |
| Operator Name: Pipestone Energy Corp. | |
| License Number: 0490697 | |
| License Date: 2018-08-30 | |
| License Status: Amended | |
| Spud Date: 2019-02-27 | |
| Final Drill Date: 2019-03-12 | |
| Well Total Depth: 4730.00 m | |
| Surface Hole Latitude: 55.115427 | |
| Surface Hole Longitude: -119.091590 |
| Date | Event |
|---|---|
| 2018-08-30 | Obtained License |
| 2019-02-28 | Surface Casing Operation Performed |
| 2019-03-02 | Direction Drilling Operation Performed - Deviate |
| 2019-03-07 | Direction Drilling Operation Performed - Horizontal |
| 2019-03-07 | Well Log Performed |
| 2019-03-12 | Finished Drilling |
| 2019-03-12 | Well Log Performed |
| 2019-03-12 | Well Mode changed to Drilled and Cased |
| 2019-03-14 | Production Casing Operation Performed |
| 2019-03-14 | Rig Released |
| 2019-05-23 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-05-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-05-26 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-05-27 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-05-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-05-29 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-05-30 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-05-31 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-06-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-06-02 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-06-03 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-06-04 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-06-05 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-06-06 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-06-07 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-07-01 | Well Fluid changed to Gas |
| 2019-07-01 | Well Mode changed to Testing |
| 2019-08-01 | Well Fluid changed to Gas |
| 2019-08-01 | Well Mode changed to Test Completed |
| 2019-09-24 | Well Began Production |
| 2019-09-24 | Well Fluid changed to Gas |
| 2019-09-24 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2019-02-27 | Precision Drilling Corporation | 630 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2019-03-02 | 1022.90 | Deviate (5 - 79 degrees) |
| 2019-03-07 | 2508.40 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2019-05-23 | Multi-Stage Fracture | 4670.50 | 4683.90 | 0 |
| 2019-05-30 | Multi-Stage Fracture | 3831.20 | 3915.40 | 0 |
| 2019-05-31 | Multi-Stage Fracture | 3738.80 | 3823.00 | 0 |
| 2019-05-31 | Multi-Stage Fracture | 3646.80 | 3730.10 | 0 |
| 2019-06-01 | Multi-Stage Fracture | 3553.40 | 3638.50 | 0 |
| 2019-06-02 | Multi-Stage Fracture | 3460.60 | 3545.10 | 0 |
| 2019-06-02 | Multi-Stage Fracture | 3368.10 | 3452.20 | 0 |
| 2019-06-03 | Multi-Stage Fracture | 3275.20 | 3359.40 | 0 |
| 2019-06-03 | Multi-Stage Fracture | 3182.40 | 3267.00 | 0 |
| 2019-06-04 | Multi-Stage Fracture | 3089.90 | 3174.10 | 0 |
| 2019-06-04 | Multi-Stage Fracture | 3000.50 | 3081.30 | 0 |
| 2019-05-25 | Multi-Stage Fracture | 4572.30 | 4647.80 | 0 |
| 2019-06-05 | Multi-Stage Fracture | 2908.40 | 2992.50 | 0 |
| 2019-06-05 | Multi-Stage Fracture | 2815.50 | 2899.70 | 0 |
| 2019-06-06 | Multi-Stage Fracture | 2722.30 | 2806.90 | 0 |
| 2019-06-06 | Multi-Stage Fracture | 2629.80 | 2714.00 | 0 |
| 2019-06-07 | Multi-Stage Fracture | 2537.00 | 2621.20 | 0 |
| 2019-06-07 | Multi-Stage Fracture | 2444.00 | 2527.80 | 0 |
| 2019-05-26 | Multi-Stage Fracture | 4489.80 | 4564.00 | 0 |
| 2019-05-27 | Multi-Stage Fracture | 4387.40 | 4469.50 | 0 |
| 2019-05-27 | Multi-Stage Fracture | 4294.50 | 4378.70 | 0 |
| 2019-05-28 | Multi-Stage Fracture | 4201.80 | 4286.30 | 0 |
| 2019-05-28 | Multi-Stage Fracture | 4109.10 | 4191.70 | 0 |
| 2019-05-29 | Multi-Stage Fracture | 4016.70 | 4100.80 | 0 |
| 2019-05-29 | Multi-Stage Fracture | 3923.70 | 4007.90 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2019-05-23 | 2019-06-07 | 2,371 | 0 | N/A |
| 2 | 2019-05-25 | 2019-06-07 | 2,371 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water (Including Mix Water Supplied by Client)* | 7732-18-5 | 100 | 81.1218 | N/A | |||
| Slickwater | Schlumberger | Quartz. Crystalline silica | 14808-60-7 | 100 | 18.3948 | N/A | ||
| Enviro-Syn HCR-7000FRAC-WL | Fluid Energy Group Ltd. | Acid | Cinnamaldehyde | 104-55-2 | 100 | 0.0001 | N/A | |
| Corrosion Inhibitors | Not Available | 100 | 0.0012 | N/A | ||||
| Hydrochloric Acid | 7647-01-0 | 100 | 0.026 | N/A | ||||
| Nitrogenous base | Trade Secret | 100 | 0.0085 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.3539 | N/A | ||||
| Slickwater | Schlumberger | Energizing Fluid | Acrylic polymer | Trade Secret | 100 | 0.047 | N/A | |
| Glutaraldehyde | 111-30-8 | 100 | 0.0021 | N/A | ||||
| Hydrocarbon | Trade Secret | 100 | 0.0336 | N/A | ||||
| Methanol (impurity) | 67-56-1 | 100 | 0 | N/A | ||||
| Non-ionic surfactant | Trade Secret | 100 | 0.0033 | N/A | ||||
| Secondary alcohols. ethoxylated | Trade Secret | 100 | 0.0033 | N/A | ||||
| 2 | Slickwater | Schlumberger | Energizing Fluid | Diammonium peroxodisulphate | 7727-54-0 | 100 | 0.0031 | N/A |
| Magnesium silicate hydrate (talc) | 14807-96-6 | 100 | 0 | N/A | ||||
| poly(tetrafluoroethylene) | 9002-84-0 | 100 | 0 | N/A | ||||
| Vinylidene chloride/methylacrylate copolymer | 25038-72-6 | 100 | 0.0006 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2019-05-13 | 2019-07-25 | Surface Water - Runoff | 6878 |
| 2019-05-13 | 2019-07-25 | Surface Water - Runoff | 1010 |
| 2019-05-13 | 2019-07-25 | Surface Water - Runoff | 1974 |
| 2019-05-13 | 2019-07-25 | Surface Water - Runoff | 2138 |
| 2019-05-13 | 2019-07-25 | Surface Water - Runoff | 8464 |
| 2019-05-13 | 2019-07-25 | Surface Water - Runoff | 7019 |
| 2019-05-13 | 2019-07-25 | Surface Water - Runoff | 1369 |
| 2019-05-13 | 2019-07-25 | Surface Water - Runoff | 2498 |
| 2019-05-13 | 2019-07-25 | Surface Water - Runoff | 2010 |
| 2019-05-13 | 2019-07-25 | Surface Water - Runoff | 1130 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2019 | 2198 | 0.0 | 0.0 | 0.0 |
| 2020 | 1905 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-03-14 | No Incident Encountered | 0.00 | 0.00 |
| 2019-07-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]