If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0716082506020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.175321,"lon":-119.094031,"icon":""}]} |
Location: 02/06-25-071-08W6/0 | |
Location Alias: 02/06-25-71-08 W6M | |
Location Alias 2: 02/06-25-071-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 071 | |
Meridian: 6 | |
Range: 08 | |
Section: 25 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: NUVISTA WEMBLEY 6-25-71-8 | |
Operator Name: NuVista Energy Ltd. | |
License Number: 0115091 | |
License Date: 1985-06-04 | |
License Status: RecCertified | |
Spud Date: 1985-06-10 | |
Final Drill Date: 1985-06-28 | |
Well Total Depth: 2325.00 m | |
Surface Hole Latitude: 55.175321 | |
Surface Hole Longitude: -119.094031 |
Date | Event |
---|---|
1985-06-04 | Obtained License |
1985-06-11 | Surface Casing Operation Performed |
1985-06-28 | Finished Drilling |
1985-06-29 | Well Log Performed |
1985-06-30 | Well Log Performed |
1985-07-01 | Well Log Performed |
1985-07-02 | Drill Stem Test Performed |
1985-07-03 | Drill Stem Test Performed |
1985-07-05 | Drill Stem Test Performed |
1985-07-06 | Production Casing Operation Performed |
1985-07-07 | Rig Released |
1985-08-20 | Well Log Performed |
1985-08-21 | Well Log Performed |
1985-08-22 | Perforation Treatment Performed - Jet Perforation |
1985-08-24 | Perforation Treatment Performed - Fractured |
1985-08-26 | Well Log Performed |
1985-08-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-08-27 | Plug Back Performed |
1985-08-28 | Perforation Treatment Performed - Jet Perforation |
1985-08-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-08-30 | Plug Back Performed |
1985-08-30 | Well Mode changed to Abandoned |
1987-09-25 | Perforation Treatment Performed - Jet Perforation |
1987-09-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-09-26 | Perforation Treatment Performed - Jet Perforation |
1987-09-26 | Perforation Treatment Performed - Remedial Casing |
1987-09-26 | Plug Back Performed |
1987-09-28 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-08-22 | Perforation | 2007.70 | 2010.10 | 13 |
1987-09-26 | Remedial Casing Cementing | 375.00 | 416.00 | 0 |
1985-08-24 | Fracture | 2007.70 | 2010.10 | 0 |
1985-08-27 | Packing Device Capped w/Cement | 1997.00 | 2005.00 | 0 |
1985-08-28 | Perforation | 1971.00 | 1974.50 | 13 |
1985-08-30 | Packing Device Capped w/Cement | 1952.00 | 1960.00 | 0 |
1987-09-25 | Perforation | 624.00 | 625.00 | 13 |
1987-09-26 | Packing Device Capped w/Cement | 609.00 | 617.00 | 0 |
1987-09-26 | Perforation | 415.00 | 416.00 | 13 |
1987-09-26 | Perforation | 375.00 | 376.00 | 13 |
For data sources see[4]