If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0716083008002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.177085,"lon":-119.208036,"icon":""}]} |
Location: 00/08-30-071-08W6/2 | |
Location Alias: 00/08-30-71-08 W6M | |
Location Alias 2: 00/08-30-071-08 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 071 | |
Meridian: 6 | |
Range: 08 | |
Section: 30 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: NUVISTA WEMBLEY 8-30-71-8 | |
Operator Name: NuVista Energy Ltd. | |
License Number: 0101079 | |
License Date: 1983-03-24 | |
License Status: RecCertified | |
Spud Date: 1983-04-02 | |
Final Drill Date: 1983-04-26 | |
Well Total Depth: 2475.00 m | |
Surface Hole Latitude: 55.177085 | |
Surface Hole Longitude: -119.208036 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1983-03-24 | Obtained License |
1983-04-10 | Drill Stem Test Performed |
1983-04-21 | Kick Occurred |
1983-04-26 | Finished Drilling |
1983-04-27 | Well Log Performed |
1983-04-28 | Drill Stem Test Performed |
1983-04-30 | Drill Stem Test Performed |
1983-05-01 | Production Casing Operation Performed |
1983-05-30 | Perforation Treatment Performed - Jet Perforation |
1983-05-31 | Perforation Treatment Performed - Remedial Casing |
1983-06-02 | Perforation Treatment Performed - Jet Perforation |
1983-06-03 | Perforation Treatment Performed - Cement Squeeze |
1983-06-08 | Perforation Treatment Performed - Cement Squeeze |
1983-06-09 | Perforation Treatment Performed - Jet Perforation |
1983-06-11 | Perforation Treatment Performed - Fractured |
1983-06-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1983-06-16 | Perforation Treatment Performed - Jet Perforation |
1983-06-21 | Perforation Treatment Performed - Cement Squeeze |
1983-06-24 | Perforation Treatment Performed - Jet Perforation |
1983-06-30 | Perforation Treatment Performed - Cement Squeeze |
1983-06-30 | Perforation Treatment Performed - Jet Perforation |
1983-07-10 | Perforation Treatment Performed - Jet Perforation |
1983-07-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-07-14 | Perforation Treatment Performed - Jet Perforation |
1983-07-15 | Perforation Treatment Performed - Cement Squeeze |
1983-07-19 | Perforation Treatment Performed - Cement Squeeze |
1983-07-21 | Perforation Treatment Performed - Jet Perforation |
1983-07-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-10-17 | Perforation Treatment Performed - Fractured |
1987-07-15 | Perforation Treatment Performed - Cement Squeeze |
1987-07-15 | Plug Back Performed |
1987-07-22 | Perforation Treatment Performed - Cement Squeeze |
1987-08-02 | Perforation Treatment Performed - Cement Squeeze |
1987-08-03 | Perforation Treatment Performed - Cement Squeeze |
1987-08-06 | Perforation Treatment Performed - Jet Perforation |
1987-08-06 | Well Mode changed to Drilled and Cased |
1987-08-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-10-04 | Well Fluid changed to Gas |
1991-10-04 | Well Mode changed to Testing |
1991-10-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-10-05 | Perforation Treatment Performed - Jet Perforation |
1991-10-05 | Plug Back Performed |
1991-10-05 | Well Fluid changed to Gas |
1991-10-05 | Well Mode changed to Abandoned |
1991-10-07 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-05-30 | Perforation | 2372.50 | 2373.50 | 7 |
1983-06-09 | Perforation | 1675.80 | 1679.00 | 7 |
1983-06-11 | Fracture | 1673.30 | 1679.00 | 0 |
1983-06-15 | Packing Device Capped w/Cement | 1641.50 | 1649.00 | 0 |
1983-06-16 | Perforation | 1127.00 | 1129.50 | 7 |
1983-06-21 | Cement Squeeze | 1127.00 | 1129.50 | 0 |
1983-06-24 | Perforation | 1127.00 | 1129.50 | 13 |
1983-06-30 | Perforation | 1140.00 | 1141.00 | 7 |
1983-06-30 | Cement Squeeze | 1127.00 | 1129.50 | 0 |
1983-06-30 | Cement Squeeze | 1140.00 | 1141.00 | 0 |
1983-07-10 | Perforation | 1124.50 | 1128.00 | 13 |
1983-05-30 | Perforation | 2335.00 | 2336.00 | 7 |
1983-07-12 | Acid Treatment | 1124.50 | 1128.00 | 0 |
1983-07-14 | Perforation | 1140.00 | 1141.00 | 13 |
1983-07-15 | Cement Squeeze | 1140.00 | 1141.00 | 0 |
1983-07-19 | Cement Squeeze | 1124.50 | 1128.00 | 0 |
1983-07-21 | Perforation | 1125.50 | 1127.50 | 7 |
1983-07-22 | Acid Treatment | 1125.50 | 1127.50 | 0 |
1983-10-17 | Fracture | 1125.50 | 1127.50 | 0 |
1987-07-15 | Cement Squeeze | 1125.50 | 1127.50 | 0 |
1987-07-22 | Cement Squeeze | 1656.00 | 1679.00 | 0 |
1987-08-02 | Cement Squeeze | 1656.00 | 1690.00 | 0 |
1983-05-31 | Remedial Casing Cementing | 2335.00 | 2336.00 | 0 |
1987-08-03 | Cement Squeeze | 1124.50 | 1141.00 | 0 |
1987-08-06 | Perforation | 2345.00 | 2347.00 | 7 |
1987-08-06 | Perforation | 2348.00 | 2349.50 | 7 |
1987-08-06 | Perforation | 2351.00 | 2354.00 | 7 |
1987-08-06 | Perforation | 2356.00 | 2359.00 | 7 |
1987-08-07 | Acid Treatment | 2345.00 | 2359.00 | 0 |
1991-10-05 | Packing Device Capped w/Cement | 2322.00 | 2330.00 | 0 |
1991-10-05 | Packing Device Capped w/Cement | 1112.00 | 1120.00 | 0 |
1991-10-05 | Perforation | 498.00 | 500.00 | 73 |
1991-10-05 | Packing Device Capped w/Cement | 482.00 | 490.00 | 0 |
1983-05-31 | Remedial Casing Cementing | 2372.50 | 2373.50 | 0 |
1983-06-02 | Perforation | 1689.00 | 1690.00 | 7 |
1983-06-02 | Perforation | 1656.00 | 1657.00 | 7 |
1983-06-03 | Cement Squeeze | 1656.00 | 1690.00 | 0 |
1983-06-08 | Cement Squeeze | 1689.00 | 1690.00 | 0 |
1983-06-09 | Perforation | 1673.30 | 1675.50 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1991 | 70 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1983-04-21 | Kick | 2350.00 | 2350.00 |
For data sources see[6]