If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0716091905000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.146405,"lon":-119.352854,"icon":""}]} |
Location: 00/05-19-071-09W6/0 | |
Location Alias: 00/05-19-71-09 W6M | |
Location Alias 2: 00/05-19-071-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 071 | |
Meridian: 6 | |
Range: 09 | |
Section: 19 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: NUVISTA ELM 5-19-71-9 | |
Operator Name: NuVista Energy Ltd. | |
License Number: 0420764 | |
License Date: 2010-05-28 | |
License Status: Issued | |
Spud Date: 2010-08-22 | |
Final Drill Date: 2010-09-24 | |
Well Total Depth: 4772.00 m | |
Surface Hole Latitude: 55.146405 | |
Surface Hole Longitude: -119.352854 |
Date | Event |
---|---|
2010-05-28 | Obtained License |
2010-08-24 | Surface Casing Operation Performed |
2010-08-31 | Direction Drilling Operation Performed - Horizontal |
2010-09-05 | Intermediate Casing Operation Performed |
2010-09-24 | Finished Drilling |
2010-09-24 | Well Log Performed |
2010-09-24 | Well Mode changed to Drilled and Cased |
2010-09-28 | Liner Casing Operation Performed |
2010-09-28 | Perforation Treatment Performed - Open-Hole Completion |
2010-09-29 | Rig Released |
2010-10-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-10-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-10-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-10-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-10-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-10-20 | Perforation Treatment Performed - Fractured |
2010-10-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-10-30 | Well Began Production |
2010-10-30 | Well Fluid changed to Gas |
2010-10-30 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-08-31 | 2246.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-09-28 | Open Hole/Barefoot Completion | 4732.30 | 4772.00 | 0 |
2010-10-17 | Multi-Stage Fracture | 3706.20 | 3840.30 | 0 |
2010-10-17 | Multi-Stage Fracture | 3587.90 | 3706.20 | 0 |
2010-10-18 | Multi-Stage Fracture | 3469.10 | 3587.90 | 0 |
2010-10-18 | Multi-Stage Fracture | 3323.10 | 3469.10 | 0 |
2010-10-18 | Multi-Stage Fracture | 3190.60 | 3323.10 | 0 |
2010-10-19 | Multi-Stage Fracture | 3058.50 | 3190.60 | 0 |
2010-10-19 | Multi-Stage Fracture | 2940.10 | 3058.50 | 0 |
2010-10-19 | Multi-Stage Fracture | 2804.40 | 2940.10 | 0 |
2010-10-20 | Multi-Stage Fracture | 2642.90 | 2804.40 | 0 |
2010-10-20 | Fracture | 4732.30 | 4772.00 | 0 |
2010-10-15 | Multi-Stage Fracture | 4544.40 | 4665.40 | 0 |
2010-10-15 | Multi-Stage Fracture | 4665.40 | 4731.90 | 0 |
2010-10-15 | Multi-Stage Fracture | 4426.00 | 4544.40 | 0 |
2010-10-15 | Multi-Stage Fracture | 4307.90 | 4426.00 | 0 |
2010-10-16 | Multi-Stage Fracture | 4188.20 | 4307.90 | 0 |
2010-10-16 | Multi-Stage Fracture | 4081.30 | 4188.20 | 0 |
2010-10-16 | Multi-Stage Fracture | 3961.40 | 4081.30 | 0 |
2010-10-17 | Multi-Stage Fracture | 3840.30 | 3961.40 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 144 | 0.0 | 0.0 | 0.0 |
2011 | 6403 | 0.0 | 0.0 | 0.0 |
2012 | 8101 | 0.0 | 0.0 | 0.0 |
2013 | 6241 | 0.0 | 0.0 | 0.0 |
2014 | 6825 | 0.0 | 0.0 | 0.0 |
2015 | 7776 | 0.0 | 0.0 | 0.0 |
2016 | 7554 | 0.0 | 0.0 | 0.0 |
2017 | 6232 | 0.0 | 0.0 | 0.0 |
2018 | 215 | 0.0 | 0.0 | 0.0 |
2019 | 4895 | 0.0 | 0.0 | 0.0 |
2020 | 2173 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2010-09-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]