X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0716101804000

Well Details

Well ID: 0716101804000
Loading map...
Location: 00/04-18-071-10W6/0
Location Alias: 00/04-18-71-10 W6M
Location Alias 2: 00/04-18-071-10 W6/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 6
Range: 10
Section: 18
County/Municipality: County of Grande Prairie No. 1
Well Name: CARDINAL ELM 4-18-71-10
Operator Name: Cardinal Energy Ltd.
License Number: 0453716
License Date: 2013-01-16
License Status: Issued
Spud Date: 2013-02-08
Final Drill Date: 2013-02-21
Well Total Depth: 2618.00 m
Surface Hole Latitude: 55.155492
Surface Hole Longitude: -119.532404

For data sources see[1][2]

Well History

Date Event
2013-01-16 Obtained License
2013-02-10 Surface Casing Operation Performed
2013-02-13 Direction Drilling Operation Performed - Deviate
2013-02-15 Intermediate Casing Operation Performed
2013-02-16 Direction Drilling Operation Performed - Horizontal
2013-02-21 Finished Drilling
2013-02-21 Well Mode changed to Drilled and Cased
2013-02-23 Liner Casing Operation Performed
2013-02-23 Perforation Treatment Performed - Open-Hole Completion
2013-02-24 Rig Released
2013-03-01 Well Log Performed
2013-03-03 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-25 Well Began Production
2013-03-25 Well Fluid changed to Crude Oil
2013-03-25 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-02-09 Precision Drilling Corporation 325 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-02-13 1092.00 Deviate (5 - 79 degrees)
2013-02-16 1462.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-02-23 Open Hole/Barefoot Completion 2585.00 2618.00 0
2013-03-03 Multi-Stage Fracture 1760.20 1760.30 0
2013-03-03 Multi-Stage Fracture 1698.60 1698.70 0
2013-03-03 Multi-Stage Fracture 1603.50 1603.60 0
2013-03-03 Multi-Stage Fracture 1507.60 1507.70 0
2013-03-03 Multi-Stage Fracture 2572.80 2572.90 0
2013-03-03 Multi-Stage Fracture 2473.30 2473.40 0
2013-03-03 Multi-Stage Fracture 2365.50 2365.60 0
2013-03-03 Multi-Stage Fracture 2257.70 2257.80 0
2013-03-03 Multi-Stage Fracture 2174.50 2174.60 0
2013-03-03 Multi-Stage Fracture 2057.00 2057.10 0
2013-03-03 Multi-Stage Fracture 1950.50 1950.60 0
2013-03-03 Multi-Stage Fracture 1844.30 1844.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-03-03 2013-03-03 1,366 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 No specific ingredients Not Available 100 77.6176 N/A
Sand (20/40) Canyon Aluminum Oxide 1344-28-1 100 20.9112 N/A
Crystalline silica. quartz 14808-60-7 100 20.9112 N/A
Iron Oxide 1309-37-1 100 20.9113 N/A
Titanium Oxide 13463-67-7 100 20.9111 N/A
CAN-2300 Breaker (Enzyme HpH. 10L:1L) Canyon Breaker Cellulase Enzyme Solution Not Available 100 0.0381 N/A
Water 7732-18-5 100 0.0381 N/A
CAN-2301 Breaker (Oxidizer) Canyon Breaker Ammonium Persulfate 7727-54-0 100 0.0369 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0369 N/A
CAN-LTC Clay Control / IFTR / NE Canyon Clay Control Refer to MSDS 6662 100 0.6122 N/A
CAN-2200 Crosslinker / pH buffer (Borate) Canyon Crosslinker Boric Acid 10043-35-3 100 0.2645 N/A
Monoethanolamine 141-43-5 100 0.2645 N/A
Water 7732-18-5 100 0.2645 N/A
CAN-2000 Gellant (Guar) Canyon Gelling Agent Polysacharide Suspension Not Available 100 0.5193 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-03-03 2013-03-18 Municipal Water 1040

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 6571 0.0 0.0 0.0
2014 8696 0.0 0.0 0.0
2015 8472 0.0 0.0 0.0
2016 8761 0.0 0.0 0.0
2017 8583 0.0 0.0 0.0
2018 8747 0.0 0.0 0.0
2019 8751 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References