If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0716102012000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.152834,"lon":-119.508612,"icon":""}]} |
| Location: 00/12-20-071-10W6/0 | |
| Location Alias: 00/12-20-71-10 W6M | |
| Location Alias 2: 00/12-20-071-10 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 071 | |
| Meridian: 6 | |
| Range: 10 | |
| Section: 20 | |
| County/Municipality: County of Grande Prairie No. 1 | |
| Well Name: CARDINAL HZ ELM 12-20-71-10 | |
| Operator Name: Cardinal Energy Ltd. | |
| License Number: 0489295 | |
| License Date: 2018-05-28 | |
| License Status: Issued | |
| Spud Date: 2018-07-07 | |
| Final Drill Date: 2018-07-18 | |
| Well Total Depth: 2615.00 m | |
| Surface Hole Latitude: 55.152834 | |
| Surface Hole Longitude: -119.508612 |
| Date | Event |
|---|---|
| 2018-05-28 | Obtained License |
| 2018-07-08 | Surface Casing Operation Performed |
| 2018-07-10 | Direction Drilling Operation Performed - Deviate |
| 2018-07-12 | Direction Drilling Operation Performed - Horizontal |
| 2018-07-14 | Intermediate Casing Operation Performed |
| 2018-07-18 | Finished Drilling |
| 2018-07-18 | Well Mode changed to Drilled and Cased |
| 2018-07-19 | Liner Casing Operation Performed |
| 2018-07-19 | Well Log Performed |
| 2018-07-20 | Perforation Treatment Performed - Open-Hole Completion |
| 2018-07-20 | Rig Released |
| 2018-07-31 | Well Log Performed |
| 2018-08-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-08-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-09-08 | Well Began Production |
| 2018-09-08 | Well Fluid changed to Crude Oil |
| 2018-09-08 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2018-07-07 | Ensign Drilling Inc. | 556 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2018-07-10 | 1065.90 | Deviate (5 - 79 degrees) |
| 2018-07-12 | 1471.50 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2018-07-20 | Open Hole/Barefoot Completion | 2606.00 | 2615.00 | 0 |
| 2018-08-25 | Multi-Stage Fracture | 2090.70 | 2091.80 | 0 |
| 2018-08-25 | Multi-Stage Fracture | 2039.80 | 2040.90 | 0 |
| 2018-08-25 | Multi-Stage Fracture | 1989.60 | 1990.70 | 0 |
| 2018-08-25 | Multi-Stage Fracture | 1858.50 | 1859.60 | 0 |
| 2018-08-25 | Multi-Stage Fracture | 1785.40 | 1786.50 | 0 |
| 2018-08-25 | Multi-Stage Fracture | 1723.60 | 1724.70 | 0 |
| 2018-08-25 | Multi-Stage Fracture | 1661.60 | 1662.70 | 0 |
| 2018-08-20 | Multi-Stage Fracture | 2587.50 | 2588.60 | 0 |
| 2018-08-20 | Multi-Stage Fracture | 2521.90 | 2523.00 | 0 |
| 2018-08-20 | Multi-Stage Fracture | 2460.70 | 2461.80 | 0 |
| 2018-08-20 | Multi-Stage Fracture | 2399.80 | 2400.90 | 0 |
| 2018-08-20 | Multi-Stage Fracture | 2338.20 | 2339.30 | 0 |
| 2018-08-20 | Multi-Stage Fracture | 2277.00 | 2278.10 | 0 |
| 2018-08-25 | Multi-Stage Fracture | 2214.90 | 2216.00 | 0 |
| 2018-08-25 | Multi-Stage Fracture | 2153.40 | 2154.50 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2018-08-20 | 2018-08-25 | 1,334 | 1,063 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 81.2861 | N/A | |||
| Sand 20/40 | Trican | silica crystalline | 14808-60-7 | 100 | 17.6365 | N/A | ||
| AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0145 | N/A | |
| dibromoacetonitrile | 3252-43-5 | 100 | 0.0145 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0145 | N/A | ||||
| polyethylene glycol | 25322-68-3 | 100 | 0.0145 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.0145 | N/A | ||||
| WBO-2 | Trican | Breaker | sodium persulfate | 7775-27-1 | 100 | 0.0277 | N/A | |
| CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1628 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.1628 | N/A | ||||
| WXB-10 | Trican | Crosslinker | borate salts | 1319-33-1 | 100 | 0.2057 | N/A | |
| distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.2057 | N/A | ||||
| DF-2W | Trican | Defoamer | non-hazardous ingredients | Not Available | 100 | 0.0083 | N/A | |
| propylene glycol | 57-55-6 | 100 | 0.0083 | N/A | ||||
| WG-111LA | Trican | Gelling Agent | fumaric acid | 110-17-8 | 100 | 0.5911 | N/A | |
| guar gum | 9000-30-0 | 100 | 0.5911 | N/A | ||||
| solvent naphtha (petroleum). heavy aliphatic | 64742-96-7 | 100 | 0.5911 | N/A | ||||
| SI-18 | Trican | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.0235 | N/A | |
| NMR-1N | Trican | Surfactant | methanol | 67-56-1 | 100 | 0.0432 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.0432 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2018-08-17 | 2018-08-25 | Surface Water - Runoff | 1136 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2018 | 2776 | 0.0 | 0.0 | 0.0 |
| 2019 | 8753 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2018-07-20 | No Incident Encountered | 0.00 | 0.00 |
| 2018-08-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]