X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0716102015000

Well Details

Well ID: 0716102015000
Loading map...
Location: 00/15-20-071-10W6/0
Location Alias: 00/15-20-71-10 W6M
Location Alias 2: 00/15-20-071-10 W6/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 6
Range: 10
Section: 20
County/Municipality: County of Grande Prairie No. 1
Well Name: CARDINAL HZ ELM 15-20-71-10
Operator Name: Cardinal Energy Ltd.
License Number: 0489624
License Date: 2018-06-20
License Status: Issued
Spud Date: 2018-07-30
Final Drill Date: 2018-08-08
Well Total Depth: 3068.00 m
Surface Hole Latitude: 55.152794
Surface Hole Longitude: -119.500907

For data sources see[1][2]

Well History

Date Event
2018-06-20 Obtained License
2018-07-31 Surface Casing Operation Performed
2018-08-01 Direction Drilling Operation Performed - Deviate
2018-08-03 Direction Drilling Operation Performed - Horizontal
2018-08-03 Intermediate Casing Operation Performed
2018-08-08 Finished Drilling
2018-08-08 Well Mode changed to Drilled and Cased
2018-08-09 Liner Casing Operation Performed
2018-08-10 Perforation Treatment Performed - Open-Hole Completion
2018-08-10 Rig Released
2018-08-11 Well Log Performed
2018-08-22 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-24 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-11 Well Began Production
2018-09-11 Well Fluid changed to Crude Oil
2018-09-11 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-30 Ensign Drilling Inc. 556 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-08-01 1086.50 Deviate (5 - 79 degrees)
2018-08-03 1444.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-10 Open Hole/Barefoot Completion 3062.00 3068.00 0
2018-08-23 Multi-Stage Fracture 2461.40 2461.50 0
2018-08-23 Multi-Stage Fracture 2387.10 2387.20 0
2018-08-23 Multi-Stage Fracture 2324.60 2324.70 0
2018-08-23 Multi-Stage Fracture 2249.90 2250.00 0
2018-08-23 Multi-Stage Fracture 2175.30 2175.40 0
2018-08-23 Multi-Stage Fracture 2113.00 2113.10 0
2018-08-23 Multi-Stage Fracture 2037.70 2037.80 0
2018-08-23 Multi-Stage Fracture 1963.60 1963.70 0
2018-08-23 Multi-Stage Fracture 1889.10 1889.20 0
2018-08-24 Multi-Stage Fracture 1827.30 1827.40 0
2018-08-22 Multi-Stage Fracture 3031.80 3031.90 0
2018-08-24 Multi-Stage Fracture 1753.60 1753.70 0
2018-08-24 Multi-Stage Fracture 1678.80 1678.90 0
2018-08-24 Multi-Stage Fracture 1604.20 1604.30 0
2018-08-24 Multi-Stage Fracture 1540.90 1541.00 0
2018-08-22 Multi-Stage Fracture 2953.30 2953.40 0
2018-08-23 Multi-Stage Fracture 2891.00 2891.10 0
2018-08-23 Multi-Stage Fracture 2817.00 2817.10 0
2018-08-23 Multi-Stage Fracture 2744.50 2744.60 0
2018-08-23 Multi-Stage Fracture 2682.60 2682.70 0
2018-08-23 Multi-Stage Fracture 2608.20 2608.30 0
2018-08-23 Multi-Stage Fracture 2534.80 2534.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-22 2018-08-24 1,338 1,676 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.5393 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 16.4393 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.018 N/A
dibromoacetonitrile 3252-43-5 100 0.018 N/A
non-hazardous ingredients Not Available 100 0.018 N/A
polyethylene glycol 25322-68-3 100 0.018 N/A
sodium bromide 7647-15-6 100 0.018 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0265 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1593 N/A
non-hazardous ingredients Not Available 100 0.1593 N/A
WXB-10 Trican Crosslinker borate salts 1319-33-1 100 0.1847 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1847 N/A
DF-2W Trican Defoamer non-hazardous ingredients Not Available 100 0.0085 N/A
propylene glycol 57-55-6 100 0.0085 N/A
WG-111LA Trican Gelling Agent fumaric acid 110-17-8 100 0.5552 N/A
guar gum 9000-30-0 100 0.5552 N/A
solvent naphtha (petroleum). heavy aliphatic 64742-96-7 100 0.5552 N/A
SI-18 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0259 N/A
NMR-1N Trican Surfactant methanol 67-56-1 100 0.0427 N/A
non-hazardous ingredients Not Available 100 0.0427 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-08-14 2018-08-24 Surface Water - Runoff 1676

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2664 0.0 0.0 0.0
2019 8621 0.0 0.0 0.0
2020 2015 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-11 No Incident Encountered 0.00 0.00
2018-08-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References