X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0716103116000

Well Details

Well ID: 0716103116000
Loading map...
Location: 00/16-31-071-10W6/0
Location Alias: 00/16-31-71-10 W6M
Location Alias 2: 00/16-31-071-10 W6/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 6
Range: 10
Section: 31
County/Municipality: County of Grande Prairie No. 1
Well Name: TIDEWATER SINCLAIR 16-31-71-10
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0421344
License Date: 2010-06-22
License Status: Issued
Spud Date: 2010-07-28
Final Drill Date: 2010-08-14
Well Total Depth: 3070.00 m
Surface Hole Latitude: 55.196983
Surface Hole Longitude: -119.536801

For data sources see[1][2]

Well History

Date Event
2010-06-22 Obtained License
2010-07-29 Surface Casing Operation Performed
2010-08-02 Direction Drilling Operation Performed - Horizontal
2010-08-06 Intermediate Casing Operation Performed
2010-08-14 Finished Drilling
2010-08-14 Perforation Treatment Performed - Open-Hole Completion
2010-08-14 Well Mode changed to Drilled and Cased
2010-08-15 Liner Casing Operation Performed
2010-08-17 Perforation Treatment Performed - Open-Hole Completion
2010-08-17 Rig Released
2010-08-23 Well Log Performed
2010-08-27 Perforation Treatment Performed - Multi-Stage Fracture
2010-08-28 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-10 Well Began Production
2010-09-10 Well Fluid changed to Gas
2010-09-10 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-08-02 1682.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-14 Open Hole/Barefoot Completion 1985.00 3070.00 0
2010-08-28 Multi-Stage Fracture 2520.80 2520.90 0
2010-08-28 Multi-Stage Fracture 2448.20 2448.30 0
2010-08-28 Multi-Stage Fracture 2366.30 2366.40 0
2010-08-28 Multi-Stage Fracture 2296.60 2296.70 0
2010-08-28 Multi-Stage Fracture 2214.30 2214.40 0
2010-08-28 Multi-Stage Fracture 2144.70 2144.80 0
2010-08-28 Multi-Stage Fracture 2062.00 2062.10 0
2010-08-28 Multi-Stage Fracture 2019.00 2019.10 0
2010-08-17 Open Hole/Barefoot Completion 3066.00 3070.00 0
2010-08-27 Multi-Stage Fracture 3039.40 3039.50 0
2010-08-27 Multi-Stage Fracture 2966.00 2966.10 0
2010-08-27 Multi-Stage Fracture 2893.70 2893.80 0
2010-08-27 Multi-Stage Fracture 2822.70 2822.80 0
2010-08-27 Multi-Stage Fracture 2739.90 2740.00 0
2010-08-27 Multi-Stage Fracture 2667.20 2667.30 0
2010-08-28 Multi-Stage Fracture 2594.10 2594.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2712 0.0 0.0 0.0
2011 8595 0.0 0.0 0.0
2012 8522 0.0 0.0 0.0
2013 8531 0.0 0.0 0.0
2014 8422 0.0 0.0 0.0
2015 8504 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8137 0.0 0.0 0.0
2019 8644 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-09-05 No Incident Encountered 0.00 0.00

For data sources see[7]

References