X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0725040609000

Well Details

Well ID: 0725040609000
Loading map...
Location: 00/09-06-072-04W5/0
Location Alias: 00/09-06-72-04 W5M
Location Alias 2: 00/09-06-072-04 W5/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 5
Range: 04
Section: 06
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CARDINAL MITSUE 9-6-72-4
Operator Name: Cardinal Energy Ltd.
License Number: 0045459
License Date: 1973-03-19
License Status: Suspension
Spud Date: 1973-05-13
Final Drill Date: 1973-05-28
Well Total Depth: 1892.80 m
Surface Hole Latitude: 55.206889
Surface Hole Longitude: -114.594613

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-03-19 Obtained License
1973-05-28 Finished Drilling
1973-05-28 Well Mode changed to Drilled and Cased
1973-05-29 Production Casing Operation Performed
1973-06-28 Perforation Treatment Performed - Jet Perforation
1973-07-03 Well Began Production
1973-07-03 Well Fluid changed to Crude Oil
1973-07-03 Well Mode changed to Flowing
1975-02-11 Perforation Treatment Performed - Fractured
1977-03-11 Well Fluid changed to Crude Oil
1977-03-11 Well Mode changed to Pumping
1985-01-14 Well Fluid changed to Crude Oil
1985-01-14 Well Mode changed to Suspended
1988-03-13 Well Fluid changed to Crude Oil
1988-03-13 Well Mode changed to Abandoned Zone
1989-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-03-13 Plug Back Performed
2001-05-12 Perforation Treatment Performed - Jet Perforation
2001-10-04 Well Fluid changed to Crude Oil
2001-10-04 Well Mode changed to Pumping
2002-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-21 Plug Back Performed
2002-10-21 Well Fluid changed to Crude Oil
2002-10-21 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-06-28 Perforation 1862.30 1865.40 7
1973-06-28 Perforation 1858.10 1859.30 7
1975-02-11 Fracture 1858.10 1865.40 0
1989-03-13 Packing Device Capped w/Cement 1840.80 1848.80 0
2001-05-12 Perforation 1862.30 1865.40 7
2002-10-21 Packing Device Capped w/Cement 1843.00 1851.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 3510 0.0 0.0 0.0
1974 710 0.0 0.0 0.0
1975 4727 0.0 0.0 0.0
1976 912 0.0 0.0 0.0
1977 5180 0.0 0.0 0.0
1978 7642 0.0 0.0 0.0
1979 7600 0.0 0.0 0.0
1980 8299 0.0 0.0 0.0
1981 3238 0.0 0.0 0.0
1982 8496 0.0 0.0 0.0
1983 8219 0.0 0.0 0.0
1984 6363 0.0 0.0 0.0
1985 144 0.0 0.0 0.0
2001 1176 0.0 0.0 0.0
2002 456 0.0 0.0 0.0

For data sources see[5]

References