X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0725041711000

Well Details

Well ID: 0725041711000
Loading map...
Location: 00/11-17-072-04W5/0
Location Alias: 00/11-17-72-04 W5M
Location Alias 2: 00/11-17-072-04 W5/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 5
Range: 04
Section: 17
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CARDINAL MITSUE 11-17-72-4
Operator Name: Cardinal Energy Ltd.
License Number: 0081283
License Date: 1980-02-22
License Status: Suspension
Spud Date: 1980-03-17
Final Drill Date: 1980-05-13
Well Total Depth: 1675.00 m
Surface Hole Latitude: 55.236173
Surface Hole Longitude: -114.582168

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-02-22 Obtained License
1980-03-22 Lost Circulation Occurred
1980-05-13 Finished Drilling
1980-05-13 Well Mode changed to Drilled and Cased
1980-05-16 Liner Casing Operation Performed
1980-08-21 Perforation Treatment Performed - Jet Perforation
1980-08-22 Well Began Production
1980-08-22 Well Fluid changed to Crude Oil
1980-08-22 Well Mode changed to Flowing
1984-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-01 Well Fluid changed to Crude Oil
1984-05-01 Well Mode changed to Pumping
1989-04-25 Well Fluid changed to Crude Oil
1989-04-25 Well Mode changed to Flowing
1993-07-01 Well Fluid changed to Crude Oil
1993-07-01 Well Mode changed to Suspended
1995-04-03 Well Fluid changed to Crude Oil
1995-04-03 Well Mode changed to Flowing
2004-06-07 Perforation Treatment Performed - Cement Plug
2004-06-07 Plug Back Performed
2004-06-07 Well Fluid changed to Crude Oil
2004-06-07 Well Mode changed to Abandoned Zone
2004-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-08-21 Perforation 1643.50 1646.00 7
1984-04-30 Acid Treatment 1643.50 1646.00 0
2004-06-07 Cement Plug 1563.50 1637.30 0
2004-06-08 Packing Device Capped w/Cement 599.20 735.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1458 0.0 0.0 0.0
1981 1508 0.0 0.0 0.0
1982 3884 0.0 0.0 0.0
1983 4740 0.0 0.0 0.0
1984 7608 0.0 0.0 0.0
1985 5973 0.0 0.0 0.0
1986 8212 0.0 0.0 0.0
1987 4505 0.0 0.0 0.0
1988 6848 0.0 0.0 0.0
1989 8003 0.0 0.0 0.0
1990 4672 0.0 0.0 0.0
1991 5871 0.0 0.0 0.0
1992 884 0.0 0.0 0.0
1995 840 0.0 0.0 0.0
2003 1488 0.0 0.0 0.0
2004 2016 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-03-22 Lost Circulation 730.00 1143.00

For data sources see[6]

References