0725043410000

Well Details

Well ID: 0725043410000
Loading map...
Location: 00/10-34-072-04W5/0
Location Alias: 00/10-34-72-04 W5M
Location Alias 2: 00/10-34-072-04 W5/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 5
Range: 04
Section: 34
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: SILVERTON ET AL MITSUE 10-34-72-4
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0081250
License Date: 1980-02-21
License Status: Re-Entered
Spud Date: 1980-02-24
Final Drill Date: 1980-03-23
Well Total Depth: 1615.00 m
Surface Hole Latitude: 55.281937
Surface Hole Longitude: -114.522643

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-02-21 Obtained License
1980-03-04 Kick Occurred
1980-03-05 Lost Circulation Occurred
1980-03-15 Kick Occurred
1980-03-19 Production Casing Operation Performed
1980-03-23 Finished Drilling
1980-03-23 Perforation Treatment Performed - Open-Hole Completion
1980-03-24 Drill Stem Test Performed
1980-03-25 Drill Stem Test Performed
1980-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-04-01 Well Mode changed to Drilled and Cased
1981-01-26 Well Log Performed
1981-02-26 Perforation Treatment Performed - Cement Squeeze
1981-02-26 Perforation Treatment Performed - Jet Perforation
1981-02-28 Perforation Treatment Performed - Cement Squeeze
1981-03-02 Perforation Treatment Performed - Cement Squeeze
1981-03-09 Perforation Treatment Performed - Jet Perforation
1981-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-03-10 Well Abandoned
1981-03-10 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-03-23 Open Hole/Barefoot Completion 1576.00 1615.00 0
1980-03-26 Packing Device Capped w/Cement 1562.00 1570.00 0
1981-02-26 Perforation 560.00 561.00 13
1981-02-26 Cement Squeeze 560.00 561.00 0
1981-02-28 Cement Squeeze 560.00 561.00 0
1981-03-02 Cement Squeeze 560.00 561.00 0
1981-03-09 Perforation 601.50 603.00 7
1981-03-10 Packing Device Capped w/Cement 527.50 535.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-03-04 Kick 987.00 1000.00
1980-03-05 Lost Circulation 1068.00 1070.00
1980-03-15 Kick 1545.00 1545.00

For data sources see[5]