X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0725051104000

Well Details

Well ID: 0725051104000
Loading map...
Location: 00/04-11-072-05W5/0
Location Alias: 00/04-11-72-05 W5M
Location Alias 2: 00/04-11-072-05 W5/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 5
Range: 05
Section: 11
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CARDINAL MITSUE 4-11-72-5
Operator Name: Cardinal Energy Ltd.
License Number: 0027374
License Date: 1964-12-18
License Status: Issued
Spud Date: 1964-12-25
Final Drill Date: 1965-01-16
Well Total Depth: 1762.40 m
Surface Hole Latitude: 55.216467
Surface Hole Longitude: -114.665447

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-12-18 Obtained License
1964-12-25 Lost Circulation Occurred
1965-01-16 Finished Drilling
1965-01-16 Well Mode changed to Drilled and Cased
1965-01-18 Production Casing Operation Performed
1965-02-27 Perforation Treatment Performed - Bullet Perforation
1965-03-08 Well Began Production
1965-03-08 Well Fluid changed to Crude Oil
1965-03-08 Well Mode changed to Flowing
1976-09-13 Perforation Treatment Performed - Cement Squeeze
1976-09-14 Perforation Treatment Performed - Cement Squeeze
1985-12-04 Perforation Treatment Performed - Jet Perforation
1985-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-08-01 Well Began Injection
1986-08-01 Well Fluid changed to Solvent
1986-08-01 Well Type changed to Injection
1986-11-23 Well Log Performed
1987-01-30 Well Log Performed
1987-05-22 Well Log Performed
1988-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-20 Well Fluid changed to Water
1996-09-20 Well Type changed to Injection
2005-08-14 Well Log Performed
2005-08-15 Perforation Treatment Performed - Jet Perforation
2005-08-15 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-02-27 Bullet Perforation 1734.00 1734.60 3
2005-08-15 Perforation 1740.60 1742.20 14
2005-08-15 Perforation 1737.70 1739.80 14
2005-08-15 Perforation 1734.30 1736.70 14
1976-09-13 Cement Squeeze 1734.00 1734.60 0
1976-09-14 Cement Squeeze 1734.00 1734.60 0
1976-09-14 Cement Squeeze 1734.00 1734.60 0
1985-12-04 Perforation 1734.30 1736.70 13
1985-12-04 Perforation 1737.70 1739.80 13
1985-12-04 Perforation 1740.60 1742.20 13
1985-12-05 Acid Treatment 1734.30 1742.20 0
1988-07-25 Acid Treatment 1737.70 1742.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2671 0.0 0.0 0.0
1968 5945 0.0 0.0 0.0
1969 7275 0.0 0.0 0.0
1970 7666 0.0 0.0 0.0
1971 8086 0.0 0.0 0.0
1972 3391 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1964-12-25 Lost Circulation 60.90 60.90

For data sources see[6]

References