X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0726101311000

Well Details

Well ID: 0726101311000
Loading map...
Location: 00/11-13-072-10W6/0
Location Alias: 00/11-13-72-10 W6M
Location Alias 2: 00/11-13-072-10 W6/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 6
Range: 10
Section: 13
County/Municipality: County of Grande Prairie No. 1
Well Name: NUVISTA SINCLAIR 11-13-72-10
Operator Name: NuVista Energy Ltd.
License Number: 0476919
License Date: 2015-09-14
License Status: Amended
Spud Date: 2016-02-12
Final Drill Date: 2016-05-04
Well Total Depth: 5312.00 m
Surface Hole Latitude: 55.218948
Surface Hole Longitude: -119.373567

For data sources see[1][2]

Well History

Date Event
2015-09-14 Obtained License
2016-02-14 Surface Casing Operation Performed
2016-03-09 Direction Drilling Operation Performed - Deviate
2016-03-11 Direction Drilling Operation Performed - Horizontal
2016-03-12 Well Log Performed
2016-03-13 Intermediate Casing Operation Performed
2016-05-04 Finished Drilling
2016-05-04 Well Log Performed
2016-05-04 Well Mode changed to Drilled and Cased
2016-05-06 Perforation Treatment Performed - Open-Hole Completion
2016-05-06 Production Casing Operation Performed
2016-05-07 Rig Released
2016-05-07 Well Log Performed
2016-08-22 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-23 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-24 Perforation Treatment Performed - Multi-Stage Fracture
2016-11-15 Well Began Production
2016-11-15 Well Fluid changed to Gas
2016-11-15 Well Mode changed to Flowing
2019-08-19 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-03-05 Precision Drilling Corporation 867 N/A Resumption
2016-02-13 Precision Drilling Corporation 867 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-03-09 2162.80 Deviate (5 - 79 degrees)
2016-03-11 2707.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-05-06 Open Hole/Barefoot Completion 5272.00 5312.00 0
2016-08-22 Multi-Stage Fracture 4667.80 4668.80 0
2016-08-22 Multi-Stage Fracture 4602.10 4603.10 0
2016-08-22 Multi-Stage Fracture 4522.20 4523.20 0
2016-08-23 Multi-Stage Fracture 4443.60 4444.60 0
2016-08-23 Multi-Stage Fracture 4378.40 4379.40 0
2016-08-23 Multi-Stage Fracture 4298.40 4299.40 0
2016-08-23 Multi-Stage Fracture 4218.30 4219.30 0
2016-08-23 Multi-Stage Fracture 4152.60 4153.60 0
2016-08-23 Multi-Stage Fracture 4072.70 4073.70 0
2016-08-23 Multi-Stage Fracture 3993.10 3994.10 0
2016-08-22 Multi-Stage Fracture 5260.90 5261.90 0
2016-08-23 Multi-Stage Fracture 3927.50 3928.50 0
2016-08-23 Multi-Stage Fracture 3847.30 3848.30 0
2016-08-23 Multi-Stage Fracture 3768.90 3769.90 0
2016-08-23 Multi-Stage Fracture 3704.20 3705.20 0
2016-08-23 Multi-Stage Fracture 3625.90 3626.90 0
2016-08-23 Multi-Stage Fracture 3546.80 3547.80 0
2016-08-24 Multi-Stage Fracture 3467.90 3468.90 0
2016-08-24 Multi-Stage Fracture 3403.10 3404.10 0
2016-08-24 Multi-Stage Fracture 3323.70 3324.70 0
2016-08-24 Multi-Stage Fracture 3245.70 3246.70 0
2016-08-22 Multi-Stage Fracture 5195.30 5196.30 0
2016-08-24 Multi-Stage Fracture 3179.50 3180.50 0
2016-08-24 Multi-Stage Fracture 3099.40 3100.40 0
2016-08-24 Multi-Stage Fracture 3019.40 3020.40 0
2016-08-24 Multi-Stage Fracture 2953.30 2954.30 0
2016-08-24 Multi-Stage Fracture 2872.70 2873.70 0
2016-08-22 Multi-Stage Fracture 5130.20 5131.20 0
2016-08-22 Multi-Stage Fracture 5050.80 5051.80 0
2016-08-22 Multi-Stage Fracture 4971.50 4972.50 0
2016-08-22 Multi-Stage Fracture 4905.40 4906.40 0
2016-08-22 Multi-Stage Fracture 4826.50 4827.50 0
2016-08-22 Multi-Stage Fracture 4747.60 4748.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-08-22 2016-08-24 2,566 0 N/A
2 2016-08-22 2016-08-22 2,566 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 86.3199 N/A
WF125. YF125FlexD. Slickwater. N002 Schlumberger Quartz. Crystalline silica 14808-60-7 100 10.5135 N/A
WF125. YF125FlexD. Slickwater. N002 Schlumberger Energizing Fluid 2-Propenamid (impurity) 79-06-1 100 0 N/A
Acetic acid. potassium salt 127-08-2 100 0 N/A
Acrylamide. 2-acrylamido-2-methylpropanesulfonic
acid. sodiu
38193-60-1 100 0.0137 N/A
Alcohol. C11-14. ethoxylated 78330-21-9 100 0.0013 N/A
Alcohols. C9-11-iso-. C10-rich 68526-85-2 100 0.0006 N/A
Amines. dicoco alkylmethyl 61788-62-3 100 0 N/A
Copper(II) sulfate 7758-98-7 100 0 N/A
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 100 0.0004 N/A
Distillates. petroleum. hydrotreated light 64742-47-8 100 0.0122 N/A
Glutaraldehyde 111-30-8 100 0.0154 N/A
Nitrogen. liquid form 7727-37-9 100 0.1432 N/A
Polyethylene glycol monohexyl ether 31726-34-8 100 0.0056 N/A
Propan-2-ol 67-63-0 100 0 N/A
Sodium chloride 7647-14-5 100 0.0072 N/A
Sorbitan monooleate 1338-43-8 100 0.0007 N/A
Sorbitan monooleate. ethoxylated 9005-65-6 100 0.0005 N/A
Tetrasodium ethylenediaminetetraacetate 64-02-8 100 0 N/A
2 WF125. YF125FlexD. Slickwater. N002 Schlumberger Energizing Fluid 1.4-Benzenedicarboxylic acid. polymer
with 1.2-ethanediol an
9016-88-0 100 0 N/A
1.4-Dioxane-2.5-dione. 3.6- dimethyl-.
(3Rcis)-. polymer wit
9051-89-2 100 0.1358 N/A
2-bromo-2-nitropropane-1.3-diol 52-51-7 100 0 N/A
Boric acid 10043-35-3 100 0.0014 N/A
Boronatrocalcite 1319-33-1 100 0.0549 N/A
C12 fatty alcohol 112-53-8 100 0 N/A
C13 alcohol ethoxylate 9043-30-5 100 0 N/A
Diammonium peroxodisulphate 7727-54-0 100 0.0077 N/A
Diutan gum 125005-87-0 100 0 N/A
Ethylene Glycol 107-21-1 100 0.0318 N/A
Fumaric acid 110-17-8 100 0.0014 N/A
Guar gum 9000-30-0 100 0.2397 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0 N/A
Monosodium fumarate 7704-73-6 100 0.0014 N/A
Non-crystalline silica (impurity) 7631-86-9 100 0.0006 N/A
Oxirane. 2-methyl-. polymer with
oxirane. mono-(9Z)-9-octade
72283-36-4 100 0.0001 N/A
Phosphoric acid. dodecyl ester. potassium salt 39322-78-6 100 0 N/A
poly(tetrafluoroethylene) 9002-84-0 100 0 N/A
Sodium hydroxide 1310-73-2 100 0.0149 N/A
Sodium tetraborate 1330-43-4 100 0.0046 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0016 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-08-15 2016-08-24 Surface Water - Runoff 18727

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 73 0.0 0.0 0.0
2017 7671 0.0 0.0 0.0
2018 8476 0.0 0.0 0.0
2019 7758 0.0 0.0 0.0
2020 2090 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-05-07 No Incident Encountered 0.00 0.00
2016-09-05 No Incident Encountered 0.00 0.00

For data sources see[10]

References