0735040712000

Well Details

Well ID: 0735040712000
Loading map...
Location: 00/12-07-073-04W5/0
Location Alias: 00/12-07-73-04 W5M
Location Alias 2: 00/12-07-073-04 W5/00
Country: Canada
Province: Alberta
Township: 073
Meridian: 5
Range: 04
Section: 07
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CARDINAL MITSUE 12-7-73-4
Operator Name: Cardinal Energy Ltd.
License Number: 0028516
License Date: 1965-07-06
License Status: Abandoned
Spud Date: 1965-07-17
Final Drill Date: 1965-08-05
Well Total Depth: 1661.20 m
Surface Hole Latitude: 55.310375
Surface Hole Longitude: -114.614007

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-07-06 Obtained License
1965-08-01 Production Casing Operation Performed
1965-08-05 Finished Drilling
1965-08-05 Perforation Treatment Performed - Open-Hole Completion
1965-08-05 Well Mode changed to Drilled and Cased
1965-08-12 Well Began Production
1965-08-12 Well Fluid changed to Crude Oil
1965-08-12 Well Mode changed to Flowing
1967-01-23 Well Fluid changed to Crude Oil
1967-01-23 Well Mode changed to Pumping
1994-09-01 Well Fluid changed to Crude Oil
1994-09-01 Well Mode changed to Suspended
1994-09-10 Perforation Treatment Performed - Cement Plug
1994-09-10 Plug Back Performed
1994-09-10 Well Fluid changed to Crude Oil
1994-09-10 Well Mode changed to Abandoned Zone
1997-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-12 Plug Back Performed
1997-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-20 Plug Back Performed
1997-03-22 Well Abandoned
1997-03-22 Well Fluid changed to Crude Oil
1997-03-22 Well Mode changed to Abandoned
1998-03-12 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-08-05 Open Hole/Barefoot Completion 1623.10 1643.50 0
1994-09-10 Cement Plug 1590.90 1620.00 0
1997-03-12 Packing Device Capped w/Cement 1577.00 1585.00 0
1997-03-20 Packing Device Capped w/Cement 227.00 235.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8333 0.0 0.0 0.0
1968 3296 0.0 0.0 0.0
1970 1296 0.0 0.0 0.0
1971 6399 0.0 0.0 0.0
1972 5316 0.0 0.0 0.0
1973 8174 0.0 0.0 0.0
1974 5982 0.0 0.0 0.0
1975 7263 0.0 0.0 0.0
1976 4642 0.0 0.0 0.0
1977 4993 0.0 0.0 0.0
1978 4307 0.0 0.0 0.0
1979 7729 0.0 0.0 0.0
1980 8143 0.0 0.0 0.0
1981 6995 0.0 0.0 0.0
1982 8394 0.0 0.0 0.0
1983 7496 0.0 0.0 0.0
1984 8471 0.0 0.0 0.0
1985 6328 0.0 0.0 0.0
1986 2208 0.0 0.0 0.0
1987 1296 0.0 0.0 0.0
1988 3600 0.0 0.0 0.0
1989 8360 0.0 0.0 0.0
1990 7899 0.0 0.0 0.0
1991 8491 0.0 0.0 0.0
1992 8594 0.0 0.0 0.0
1993 5822 0.0 0.0 0.0
1994 744 0.0 0.0 0.0

For data sources see[5]