If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0736070905002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.307767,"lon":-119.020153,"icon":""}]} |
Location: 00/05-09-073-07W6/2 | |
Location Alias: 00/05-09-73-07 W6M | |
Location Alias 2: 00/05-09-073-07 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 073 | |
Meridian: 6 | |
Range: 07 | |
Section: 09 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: SECURE GRANDPR 5-9-73-7 | |
Operator Name: Secure Energy Services Inc. | |
License Number: 0178674 | |
License Date: 1995-06-19 | |
License Status: Issued | |
Spud Date: 1995-06-27 | |
Final Drill Date: 1995-07-11 | |
Well Total Depth: 2190.00 m | |
Surface Hole Latitude: 55.307767 | |
Surface Hole Longitude: -119.020153 |
Date | Event |
---|---|
1995-06-19 | Obtained License |
1995-06-28 | Surface Casing Operation Performed |
1995-07-11 | Finished Drilling |
1995-07-11 | Well Log Performed |
1995-07-11 | Well Mode changed to Drilled and Cased |
1995-07-12 | Production Casing Operation Performed |
1995-07-13 | Rig Released |
1995-07-18 | Well Log Performed |
1995-09-30 | Perforation Treatment Performed - Jet Perforation |
1995-09-30 | Well Log Performed |
1995-10-03 | Perforation Treatment Performed - Fractured |
2001-12-10 | Perforation Treatment Performed - Cement Plug |
2001-12-10 | Perforation Treatment Performed - Jet Perforation |
2001-12-10 | Plug Back Performed |
2002-06-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-06-20 | Perforation Treatment Performed - Fractured |
2007-10-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-10-20 | Plug Back Performed |
2007-10-21 | Perforation Treatment Performed - Jet Perforation |
2007-10-23 | Perforation Treatment Performed - Fractured |
2007-10-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-04-08 | Well Began Injection |
2008-04-08 | Well Fluid changed to Water |
2008-04-08 | Well Type changed to Disposal |
2017-03-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2018-06-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2018-11-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2019-03-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2019-11-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-09-30 | Perforation | 1962.00 | 1966.00 | 14 |
2007-10-27 | Packing Device Capped w/Cement | 1257.00 | 1265.00 | 0 |
2017-03-05 | Acid Treatment | 1219.50 | 1226.00 | 0 |
2018-06-28 | Acid Treatment | 1219.50 | 1226.00 | 0 |
2018-11-16 | Acid Treatment | 1219.50 | 1226.00 | 0 |
2019-03-04 | Acid Treatment | 1219.50 | 1226.00 | 0 |
2019-11-01 | Acid Treatment | 1219.00 | 1226.00 | 0 |
1995-10-03 | Fracture | 1962.00 | 1966.00 | 0 |
2001-12-10 | Perforation | 1911.50 | 1914.50 | 20 |
2001-12-10 | Cement Plug | 1948.00 | 1955.00 | 0 |
2002-06-16 | Acid Treatment | 1911.50 | 1914.50 | 0 |
2002-06-20 | Fracture | 1911.50 | 1914.50 | 0 |
2007-10-20 | Packing Device Capped w/Cement | 1898.00 | 1906.00 | 0 |
2007-10-21 | Perforation | 1219.50 | 1226.00 | 17 |
2007-10-23 | Fracture | 1219.50 | 1226.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 0 | 0.0 | 0.0 | 0.0 |
2009 | 0 | 0.0 | 0.0 | 0.0 |
2010 | 0 | 0.0 | 0.0 | 0.0 |
2011 | 0 | 0.0 | 0.0 | 0.0 |
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-03-06 | No Incident Encountered | 0.00 | 0.00 |
2018-06-28 | No Incident Encountered | 0.00 | 0.00 |
2018-11-16 | No Incident Encountered | 0.00 | 0.00 |
2019-03-04 | No Incident Encountered | 0.00 | 0.00 |
2019-11-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]