X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0736133306000

Well Details

Well ID: 0736133306000
Loading map...
Location: 00/06-33-073-13W6/0
Location Alias: 00/06-33-73-13 W6M
Location Alias 2: 00/06-33-073-13 W6/00
Country: Canada
Province: Alberta
Township: 073
Meridian: 6
Range: 13
Section: 33
County/Municipality: County of Grande Prairie No. 1
Well Name: TIDEWATER SINCLAIR 6-33-73-13
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0399977
License Date: 2008-08-21
License Status: Amended
Spud Date: 2008-09-03
Final Drill Date: 2008-10-13
Well Total Depth: 2980.00 m
Surface Hole Latitude: 55.371739
Surface Hole Longitude: -119.946234

For data sources see[1][2]

Well History

Date Event
2008-08-21 Obtained License
2008-09-07 Surface Casing Operation Performed
2008-09-13 Direction Drilling Operation Performed - Horizontal
2008-09-22 Intermediate Casing Operation Performed
2008-10-13 Finished Drilling
2008-10-13 Well Mode changed to Drilled and Cased
2008-10-16 Liner Casing Operation Performed
2008-10-24 Perforation Treatment Performed - Open-Hole Completion
2008-10-26 Rig Released
2008-11-03 Well Log Performed
2008-11-10 Perforation Treatment Performed - Multi-Stage Fracture
2008-12-01 Well Began Production
2008-12-01 Well Fluid changed to Gas
2008-12-01 Well Mode changed to Flowing
2009-09-03 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-09-13 1788.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-10-24 Open Hole/Barefoot Completion 2782.00 2980.00 0
2008-11-10 Multi-Stage Fracture 2760.10 2760.20 0
2008-11-10 Multi-Stage Fracture 2669.30 2669.40 0
2008-11-10 Multi-Stage Fracture 2533.30 2533.40 0
2008-11-10 Multi-Stage Fracture 2397.00 2397.10 0
2008-11-10 Multi-Stage Fracture 2248.50 2248.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 400 0.0 0.0 0.0
2009 6602 0.0 0.0 0.0
2010 8135 0.0 0.0 0.0
2011 8423 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8526 0.0 0.0 0.0
2014 7154 0.0 0.0 0.0
2015 7704 0.0 0.0 0.0
2016 8240 0.0 0.0 0.0
2017 8015 0.0 0.0 0.0
2018 3456 0.0 0.0 0.0
2019 1521 0.0 0.0 0.0

For data sources see[6]

References